East Central RailwayFinal Bill / Closure

Supplying and laying boulder in wire crates and pitching on slopes and its allied in work as protection scheme of embankment between Saraigarh & Forbesganj section in connection with Gauge Conversion work of Saharsa-Forbesganj section of Samastipur Division of East Central Railway

Work #40
As of March 2026

Estimate Cost

₹46.45 Cr

Sanctioned estimate

Tendered Cost

₹64.49 Cr

+38.8% vs estimate

Physical Progress

91%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹64.49 Cr
Progress91%
Started10-03-2020
Target DOC28-02-2025
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG

Work Details

5 Fields
Work No.
40
Acceptance / LOA
ECR/CAO/Con/WT/E-Tender/North/113/19-20/1203 Dtd 25.02.2020 ECR/Cao/Con/WT/Agt/113 Dt. 24.08.2020
Officer in Charge
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹46.45 Cr
Tendered Cost
₹64.49 Cr
Physical Progress
91%
Date Started
10-03-2020
Original DOC
28-02-2025
Extended DOC
N/A

Supplying and laying boulder in wire crates and pitching on slopes and its allied in work as protection scheme of embankment between Saraigarh & Forbesganj section in connection with Gauge Conversion work of Saharsa-Forbesganj section of Samastipur Division of East Central Railway is an East Central Railway (ECR) infrastructure work in Bihar, executed by Bateshwar Singh. The tendered cost of the work is ₹64.49 Cr, and it is currently Final Bill / Closure with physical progress recorded at 91%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work completed. Final variation & Final bill is under process.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supplying and laying boulder in wire crates and pitching on slopes and its allie"?
Status: Final Bill / Closure. This East Central Railway work is being executed by Bateshwar Singh. Physical progress stands at 91%. Current date of completion (DOC): 28-02-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is Bateshwar Singh. Acceptance / agreement reference: ECR/CAO/Con/WT/E-Tender/North/113/19-20/1203 Dtd 25.02.2020 ECR/Cao/Con/WT/Agt/113 Dt. 24.08.2020. Work started on 10-03-2020.
QWhat is the cost of this railway work?
The tendered cost of "Supplying and laying boulder in wire crates and pitching on " is ₹64.49 Cr (against an estimate of ₹46.45 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supplying and laying boulder in wire crates and pitching on " is one of hundreds of railway works covered.