Supplying including loading, transportation, unloading of 1,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the same at nominated place/location/stacks at Garhara Yard for B.G. Railway Track & loading the same into any type of railway wagons for various projects under CAO/Con/North, ECR
Estimate Cost
₹36.41 Cr
Sanctioned estimate
Tendered Cost
₹32.19 Cr
-11.6% vs estimate
Physical Progress
81%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupplying including loading, transportation, unloading of 1,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the same at nominated place/location/stacks at Garhara Yard for B.G. Railway Track & loading the same into any type of railway wagons for various projects under CAO/Con/North, ECR is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Ram Niwas Singh-Begusarai. The tendered cost of the work is ₹32.19 Cr, and it is currently Overdue with physical progress recorded at 81%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Supplying including loading, transportation, unloading of 1,00,000 cum machine c"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Ram Niwas Singh-Begusarai. Physical progress stands at 81%. Current date of completion (DOC): 28-01-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Ram Niwas Singh-Begusarai. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-71-23-24 /00999530101525 dt. 22.04.2024; Agt. No. ECR/ECRC/Civil/2024/0010 dt. 01.04.2024. Work started on 07-05-2024.
- QWhat is the cost of this railway work?
- The tendered cost of "Supplying including loading, transportation, unloading of 1," is ₹32.19 Cr (against an estimate of ₹36.41 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supplying including loading, transportation, unloading of 1," is one of hundreds of railway works covered.