East Central RailwayOverdue

Supplying including loading, transportation, unloading of 1,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the same at nominated place/location/stacks at Garhara Yard for B.G. Railway Track & loading the same into any type of railway wagons for various projects under CAO/Con/North, ECR

Work #338
As of June 2026

Estimate Cost

₹36.41 Cr

Sanctioned estimate

Tendered Cost

₹32.19 Cr

-11.6% vs estimate

Physical Progress

81%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹32.19 Cr
Progress81%
Started07-05-2024
Target DOC28-01-2026
Indrajit Kumar, CE/C/NW; Mintu Kumar, Secy. to CAO/C/North; Manish Kumar, AEN/Con/Ballast at Pakur

Work Details

5 Fields
Work No.
338
Acceptance / LOA
CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-71-23-24 /00999530101525 dt. 22.04.2024; Agt. No. ECR/ECRC/Civil/2024/0010 dt. 01.04.2024
Officer in Charge
Indrajit Kumar, CE/C/NW; Mintu Kumar, Secy. to CAO/C/North; Manish Kumar, AEN/Con/Ballast at Pakur
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹36.41 Cr
Tendered Cost
₹32.19 Cr
Physical Progress
81%
Date Started
07-05-2024
Original DOC
21-04-2025
Extended DOC
28-01-2026

Supplying including loading, transportation, unloading of 1,00,000 cum machine crushed track ballast (Pakur/Sahibganj area) as per Railway/RDSO's specification of track ballast IRS: GE-1, June'2004 with up-to-date correction slips and stacking the same at nominated place/location/stacks at Garhara Yard for B.G. Railway Track & loading the same into any type of railway wagons for various projects under CAO/Con/North, ECR is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Ram Niwas Singh-Begusarai. The tendered cost of the work is ₹32.19 Cr, and it is currently Overdue with physical progress recorded at 81%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supplying including loading, transportation, unloading of 1,00,000 cum machine c"?
Status: Overdue (overdue). This East Central Railway work is being executed by M/s Ram Niwas Singh-Begusarai. Physical progress stands at 81%. Current date of completion (DOC): 28-01-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Ram Niwas Singh-Begusarai. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-71-23-24 /00999530101525 dt. 22.04.2024; Agt. No. ECR/ECRC/Civil/2024/0010 dt. 01.04.2024. Work started on 07-05-2024.
QWhat is the cost of this railway work?
The tendered cost of "Supplying including loading, transportation, unloading of 1," is ₹32.19 Cr (against an estimate of ₹36.41 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supplying including loading, transportation, unloading of 1," is one of hundreds of railway works covered.