Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated works as per Railway's specification and standard in connection with construction of new By-pass line at Lalitgram between Saraigarh-Forbesganj section in Samastipur Division of East Central Railway.
Estimate Cost
₹3.29 Cr
Sanctioned estimate
Tendered Cost
₹3.19 Cr
-3.0% vs estimate
Physical Progress
100%
Work completed
Status
Final Bill / Closure
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated works as per Railway's specification and standard in connection with construction of new By-pass line at Lalitgram between Saraigarh-Forbesganj section in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S SWATA CONSTRUCTION BEGUSARAI. The tendered cost of the work is ₹3.19 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work completed. Final variation & Final bill is under process.
Frequently Asked Questions
- QWhat is the current status of the railway work "Supply, stacking and spreading of stone ballast, linking of permanent way includ"?
- Status: Final Bill / Closure. This East Central Railway work is being executed by M/S SWATA CONSTRUCTION BEGUSARAI. Physical progress stands at 100%. Current date of completion (DOC): 31-03-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/S SWATA CONSTRUCTION BEGUSARAI. Acceptance / agreement reference: ECR-CAO-C-N-ETN-48-23-24/00973860092594 Dated 06/12/2023 CA-ECR/ECRC/Civil/2024/0001 Dt 22.01.2024. Work started on 22-01-2024.
- QWhat is the cost of this railway work?
- The tendered cost of "Supply, stacking and spreading of stone ballast, linking of " is ₹3.19 Cr (against an estimate of ₹3.29 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, stacking and spreading of stone ballast, linking of " is one of hundreds of railway works covered.