East Central RailwayCompleted

Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated works as per Railway's specification and standard in connection with construction of new By-pass line at Lalitgram between Saraigarh–Forbesganj section in Samastipur Division of East Central Railway.

Work #220
As of June 2026

Estimate Cost

₹3.29 Cr

Sanctioned estimate

Tendered Cost

₹3.19 Cr

-3.0% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹3.19 Cr
Progress100%
Started22-01-2024
Target DOC31-03-2025
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
220
Acceptance / LOA
ECR-CAO-C-N-ETN-48-23-24/00973860092594 Dated 06/12/2023; ECR/ECRC/Civil/2024/0001 Dt 22.01.2024
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹3.29 Cr
Tendered Cost
₹3.19 Cr
Physical Progress
100%
Date Started
22-01-2024
Original DOC
31-03-2025
Extended DOC
N/A

Supply, stacking and spreading of stone ballast, linking of permanent way including transportation of P.Way materials like Rail, Sleeper, fittings etc and other associated works as per Railway's specification and standard in connection with construction of new By-pass line at Lalitgram between Saraigarh–Forbesganj section in Samastipur Division of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Swata Construction-Begusarai. The tendered cost of the work is ₹3.19 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Supply, stacking and spreading of stone ballast, linking of permanent way includ"?
Status: Completed. This East Central Railway work is being executed by M/S Swata Construction-Begusarai. Physical progress stands at 100%. Current date of completion (DOC): 31-03-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Swata Construction-Begusarai. Acceptance / agreement reference: ECR-CAO-C-N-ETN-48-23-24/00973860092594 Dated 06/12/2023; ECR/ECRC/Civil/2024/0001 Dt 22.01.2024. Work started on 22-01-2024.
QWhat is the cost of this railway work?
The tendered cost of "Supply, stacking and spreading of stone ballast, linking of " is ₹3.19 Cr (against an estimate of ₹3.29 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply, stacking and spreading of stone ballast, linking of " is one of hundreds of railway works covered.