East Central RailwayIn Progress

Rendering services for reparation of L-section, ESP, SIP, GAD and structural design of Bridges/LHS/UB/ROB, collection of Hydrological data of Bridges/LHS/EUB/ROB, Architectural and structural drawing station building & other type of building, soil exploration and preparation of bill of quantity between Triveniganj (excl.)-Araria Court (Incl.) (64.605 km) section in connection with construction of new BG rail line between Supaul-Araria station.

Work #49
As of March 2026

Estimate Cost

₹3.77 Cr

Sanctioned estimate

Tendered Cost

₹2.59 Cr

-31.3% vs estimate

Physical Progress

44%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹2.59 Cr
Progress44%
Started16-12-2022
Target DOC31-05-2026
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG

Work Details

5 Fields
Work No.
49
Acceptance / LOA
ECR-CAO-C-N-ETN-33-22-23/00861140067159
Officer in Charge
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹3.77 Cr
Tendered Cost
₹2.59 Cr
Physical Progress
44%
Date Started
16-12-2022
Original DOC
31-05-2026
Extended DOC
N/A

Rendering services for reparation of L-section, ESP, SIP, GAD and structural design of Bridges/LHS/UB/ROB, collection of Hydrological data of Bridges/LHS/EUB/ROB, Architectural and structural drawing station building & other type of building, soil exploration and preparation of bill of quantity between Triveniganj (excl.)-Araria Court (Incl.) (64.605 km) section in connection with construction of new BG rail line between Supaul-Araria station. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S CE Testing Company Private Limited. The tendered cost of the work is ₹2.59 Cr, and it is currently In Progress with physical progress recorded at 44%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress

?

Frequently Asked Questions

QWhat is the current status of the railway work "Rendering services for reparation of L-section, ESP, SIP, GAD and structural des"?
Status: In Progress. This East Central Railway work is being executed by M/S CE Testing Company Private Limited. Physical progress stands at 44%. Current date of completion (DOC): 31-05-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S CE Testing Company Private Limited. Acceptance / agreement reference: ECR-CAO-C-N-ETN-33-22-23/00861140067159. Work started on 16-12-2022.
QWhat is the cost of this railway work?
The tendered cost of "Rendering services for reparation of L-section, ESP, SIP, GA" is ₹2.59 Cr (against an estimate of ₹3.77 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Rendering services for reparation of L-section, ESP, SIP, GA" is one of hundreds of railway works covered.