Rendering services for preparation of L-section, ESP, SIP, GAD and Structural design of Bridges/LHS/RUB/ROB, Collection of Hydrological data of Bridges/LHS/RUB/ROB, Architectural and structural drawing of station building & other type of building, soil exploration and preparation of Bill of quantity between Madhubani (excl)–Sagauli (incl) (40Km) section in connection with construction of New BG Rail Line between Hajipur-Sagauli section.
Estimate Cost
₹1.79 Cr
Sanctioned estimate
Tendered Cost
₹1.38 Cr
-22.9% vs estimate
Physical Progress
25%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsRendering services for preparation of L-section, ESP, SIP, GAD and Structural design of Bridges/LHS/RUB/ROB, Collection of Hydrological data of Bridges/LHS/RUB/ROB, Architectural and structural drawing of station building & other type of building, soil exploration and preparation of Bill of quantity between Madhubani (excl)–Sagauli (incl) (40Km) section in connection with construction of New BG Rail Line between Hajipur-Sagauli section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s C.E.Testing Company Private Ltd. The tendered cost of the work is ₹1.38 Cr, and it is currently In Progress with physical progress recorded at 25%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Rendering services for preparation of L-section, ESP, SIP, GAD and Structural de"?
- Status: In Progress. This East Central Railway work is being executed by M/s C.E.Testing Company Private Ltd. Physical progress stands at 25%. Current date of completion (DOC): 10-10-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s C.E.Testing Company Private Ltd, 124-A N S C Bose Road, Kolkata-700092, W.B. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-42-22-23 /00861140066245 dt 21.11.22.. Work started on 21-11-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "Rendering services for preparation of L-section, ESP, SIP, G" is ₹1.38 Cr (against an estimate of ₹1.79 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Rendering services for preparation of L-section, ESP, SIP, G" is one of hundreds of railway works covered.