East Central RailwayIn Progress

Rendering services for preparation of L-section, ESP, SIP, GAD and Structural design of Bridges/LHS/RUB/ROB, Collection of Hydrological data of Bridges/LHS/RUB/ROB, Architectural and structural drawing of station building & other type of building, soil exploration and preparation of Bill of quantity between Madhubani (excl)-Sagauli (incl) (40Km) section in connection with construction of New BG Rail Line between Hajipur-Sagauli section.

Estimate Cost

₹1.79 Cr

Sanctioned estimate

Tendered Cost

₹1.38 Cr

-22.9% vs estimate

Physical Progress

38%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹1.38 Cr
Progress38%
Started21-11-2022
Target DOC10-06-2026
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP

Work Details

5 Fields
Work No.
105
Acceptance / LOA
CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-42-22-23/00861140066245 dt 21.11.22.
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹1.79 Cr
Tendered Cost
₹1.38 Cr
Physical Progress
38%
Date Started
21-11-2022
Original DOC
20-03-2023
Extended DOC
10-06-2026

Rendering services for preparation of L-section, ESP, SIP, GAD and Structural design of Bridges/LHS/RUB/ROB, Collection of Hydrological data of Bridges/LHS/RUB/ROB, Architectural and structural drawing of station building & other type of building, soil exploration and preparation of Bill of quantity between Madhubani (excl)-Sagauli (incl) (40Km) section in connection with construction of New BG Rail Line between Hajipur-Sagauli section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s C.E.Testing Company Private Ltd 124-A N S C Bose Road. The tendered cost of the work is ₹1.38 Cr, and it is currently In Progress with physical progress recorded at 38%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress

?

Frequently Asked Questions

QWhat is the current status of the railway work "Rendering services for preparation of L-section, ESP, SIP, GAD and Structural de"?
Status: In Progress. This East Central Railway work is being executed by M/s C.E.Testing Company Private Ltd 124-A N S C Bose Road. Physical progress stands at 38%. Current date of completion (DOC): 10-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s C.E.Testing Company Private Ltd 124-A N S C Bose Road, Kolkata-700092 W.B. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-42-22-23/00861140066245 dt 21.11.22.. Work started on 21-11-2022.
QWhat is the cost of this railway work?
The tendered cost of "Rendering services for preparation of L-section, ESP, SIP, G" is ₹1.38 Cr (against an estimate of ₹1.79 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Rendering services for preparation of L-section, ESP, SIP, G" is one of hundreds of railway works covered.