Rendering services for Conducting Aerial Topographical Survey using DGPS based integrated Drone, traffic studies, calculation of EIRR & FIRR, preparation of revised L-section, ESP, SIP & GAD, soil exploration, preparation of report & bill of quantity and EPC tender documents and other ancillary works in connection with Chhapra-Muzaffarpur New Line project under Sonpur Division of E.C.Railway against A/L no.-ECR-CAO-C-N-ETN-04-24-25/10030000134387 dtd 18/07/2025
Estimate Cost
₹1.18 Cr
Sanctioned estimate
Tendered Cost
N/A
Awarded value
Physical Progress
0%
Work completed
Status
Not Started
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsRendering services for Conducting Aerial Topographical Survey using DGPS based integrated Drone, traffic studies, calculation of EIRR & FIRR, preparation of revised L-section, ESP, SIP & GAD, soil exploration, preparation of report & bill of quantity and EPC tender documents and other ancillary works in connection with Chhapra-Muzaffarpur New Line project under Sonpur Division of E.C.Railway against A/L no.-ECR-CAO-C-N-ETN-04-24-25/10030000134387 dtd 18/07/2025 is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s S R Chaudhri Consultancy Services Pvt. Ltd.-Kolkata. it is currently Not Started with physical progress recorded at 0%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Rendering services for Conducting Aerial Topographical Survey using DGPS based i"?
- Status: Not Started. This East Central Railway work is being executed by M/s S R Chaudhri Consultancy Services Pvt. Ltd.-Kolkata. Physical progress stands at 0%. Current date of completion (DOC): 31-07-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s S R Chaudhri Consultancy Services Pvt Ltd-Kolkata, 23, J.C. Guha Sarani, Lake Place, Kolkata-700029, West Bengal, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-04-24-25/10030000134387 dtd 18/07/2025.
- QWhat is the cost of this railway work?
- Tendered cost details are not available in the current dataset for this railway work. Please refer to the official East Central Railway records.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Rendering services for Conducting Aerial Topographical Surve" is one of hundreds of railway works covered.