East Central RailwayIn Progress

Earth work from private land in filling for new embankment, trolley refuges and ditches near toe line, supply and pitching of stone boulder, provision of blanketing, construction of minor bridges (No. 16,17,18,19,20,22,23,26 & 27 and RUB no. 15A,17A,18A,20A,23A,25A,26A & 27A), deck slab for major bridge no. 24 and left over work between Km 13.00 to Kusheshwar asthan (excluding) in connection with Sakri-Hasanpur road new line construction project.

Work #189
As of June 2026

Estimate Cost

₹66.76 Cr

Sanctioned estimate

Tendered Cost

₹71.47 Cr

+7.1% vs estimate

Physical Progress

36%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹71.47 Cr
Progress36%
Started01-04-2019
Target DOC31-05-2027
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ

Work Details

5 Fields
Work No.
189
Agency
Fulena Construction (P) Ltd
Sri Krishna Nagar, Begusarai-851101
Acceptance / LOA
26.02.2019 / ECR/CAO/Con/WT/Agt/53 Dt 14.06.2019
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹66.76 Cr
Tendered Cost
₹71.47 Cr
Physical Progress
36%
Date Started
01-04-2019
Original DOC
31-05-2027
Extended DOC
N/A

Earth work from private land in filling for new embankment, trolley refuges and ditches near toe line, supply and pitching of stone boulder, provision of blanketing, construction of minor bridges (No. 16,17,18,19,20,22,23,26 & 27 and RUB no. 15A,17A,18A,20A,23A,25A,26A & 27A), deck slab for major bridge no. 24 and left over work between Km 13.00 to Kusheshwar asthan (excluding) in connection with Sakri-Hasanpur road new line construction project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Fulena Construction (P) Ltd. The tendered cost of the work is ₹71.47 Cr, and it is currently In Progress with physical progress recorded at 36%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth work from private land in filling for new embankment, trolley refuges and "?
Status: In Progress. This East Central Railway work is being executed by Fulena Construction (P) Ltd. Physical progress stands at 36%. Current date of completion (DOC): 31-05-2027.
QWho is the agency for this Bihar railway project?
The agency for this work is Fulena Construction (P) Ltd, Sri Krishna Nagar, Begusarai-851101. Acceptance / agreement reference: 26.02.2019 / ECR/CAO/Con/WT/Agt/53 Dt 14.06.2019. Work started on 01-04-2019.
QWhat is the cost of this railway work?
The tendered cost of "Earth work from private land in filling for new embankment, " is ₹71.47 Cr (against an estimate of ₹66.76 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth work from private land in filling for new embankment, " is one of hundreds of railway works covered.