East Central RailwayFinal Bill / Closure

Preparation of GAD, Detailed design & proof checking (from NIT/IIT) of foundation & substructure of Major bridges, ROB/RUB/LHS or any other type of structure in this section along with non standard superstructure if any between Supaul to Pipra station in connection with construction of new B.G. rail line between Araria-Supaul Station of Samastipur division of E.C.Railway.

Work #214
As of June 2026

Estimate Cost

₹0.32 Cr

Sanctioned estimate

Tendered Cost

₹0.28 Cr

-12.5% vs estimate

Physical Progress

0%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹0.28 Cr
Progress0%
Started03-07-2021
Target DOC31-03-2022
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG

Work Details

5 Fields
Work No.
214
Acceptance / LOA
ECR-CAO-C-N-ETN-98-19-20/10271780018932 Dated 11.05.2020; ECR/CAO/Con/WT/Agt/179 Dtd 09.02.2022
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹0.32 Cr
Tendered Cost
₹0.28 Cr
Physical Progress
0%
Date Started
03-07-2021
Original DOC
31-03-2022
Extended DOC
N/A

Preparation of GAD, Detailed design & proof checking (from NIT/IIT) of foundation & substructure of Major bridges, ROB/RUB/LHS or any other type of structure in this section along with non standard superstructure if any between Supaul to Pipra station in connection with construction of new B.G. rail line between Araria-Supaul Station of Samastipur division of E.C.Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s LKT Engineering Consultants Ltd.. The tendered cost of the work is ₹0.28 Cr, and it is currently Final Bill / Closure with physical progress recorded at 0%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

progress note: 0% (Agency didn't apply further extension. Contract abandoned.)

?

Frequently Asked Questions

QWhat is the current status of the railway work "Preparation of GAD, Detailed design & proof checking (from NIT/IIT) of foundatio"?
Status: Final Bill / Closure. This East Central Railway work is being executed by M/s LKT Engineering Consultants Ltd.. Physical progress stands at 0%. Current date of completion (DOC): 31-03-2022.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s LKT Engineering Consultants Ltd.. Acceptance / agreement reference: ECR-CAO-C-N-ETN-98-19-20/10271780018932 Dated 11.05.2020; ECR/CAO/Con/WT/Agt/179 Dtd 09.02.2022. Work started on 03-07-2021.
QWhat is the cost of this railway work?
The tendered cost of "Preparation of GAD, Detailed design & proof checking (from N" is ₹0.28 Cr (against an estimate of ₹0.32 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Preparation of GAD, Detailed design & proof checking (from N" is one of hundreds of railway works covered.