East Central RailwayOverdue

Preparation of GAD of bridges, soil exploration, preparation of bill of quantity and EPC tender documents and other ancillary works between Sitamarhi-Sheohar (Approx-28.00Kms) in connection with construction of new BG rail line between Shitamarhi-Sheohar under Dy. CE/Con/NKE.

Estimate Cost

₹2.37 Cr

Sanctioned estimate

Tendered Cost

₹2.20 Cr

-7.2% vs estimate

Physical Progress

20%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹2.20 Cr
Progress20%
Started09-03-2025
Target DOC31-08-2025
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar AEN/C/NKE

Work Details

5 Fields
Work No.
160
Agency
GEO DESIGNS AND RESEARCH PVT LTD-VADODARA
B-10 KRISHNA INDUSTRIAL ESTATE OPP. BIDC GORWA, VADODARA, Gujarat -390016 India
Acceptance / LOA
LOA-CAO-C-N-ETN-09-24-25 Date 09.12.2024 CA-ECR/ECRC/Civil/2025/0005 Date 20.02.2025 ECR
Officer in Charge
Indrajeet Kumar CE/C/NW/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar AEN/C/NKE
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹2.37 Cr
Tendered Cost
₹2.20 Cr
Physical Progress
20%
Date Started
09-03-2025
Original DOC
31-08-2025
Extended DOC
N/A

Preparation of GAD of bridges, soil exploration, preparation of bill of quantity and EPC tender documents and other ancillary works between Sitamarhi-Sheohar (Approx-28.00Kms) in connection with construction of new BG rail line between Shitamarhi-Sheohar under Dy. CE/Con/NKE. is an East Central Railway (ECR) infrastructure work in Bihar, executed by GEO DESIGNS AND RESEARCH Pvt. Ltd.-VADODARA. The tendered cost of the work is ₹2.20 Cr, and it is currently Overdue with physical progress recorded at 20%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

DOC under process

?

Frequently Asked Questions

QWhat is the current status of the railway work "Preparation of GAD of bridges, soil exploration, preparation of bill of quantity"?
Status: Overdue (overdue). This East Central Railway work is being executed by GEO DESIGNS AND RESEARCH Pvt. Ltd.-VADODARA. Physical progress stands at 20%. Current date of completion (DOC): 31-08-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is GEO DESIGNS AND RESEARCH PVT LTD-VADODARA, B-10 KRISHNA INDUSTRIAL ESTATE OPP. BIDC GORWA, VADODARA, Gujarat -390016 India. Acceptance / agreement reference: LOA-CAO-C-N-ETN-09-24-25 Date 09.12.2024 CA-ECR/ECRC/Civil/2025/0005 Date 20.02.2025 ECR. Work started on 09-03-2025.
QWhat is the cost of this railway work?
The tendered cost of "Preparation of GAD of bridges, soil exploration, preparation" is ₹2.20 Cr (against an estimate of ₹2.37 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Preparation of GAD of bridges, soil exploration, preparation" is one of hundreds of railway works covered.