East Central RailwayCompleted

Miscellaneous work of Supply, Fabrication & execution of H. Beam Sleepers and Channel sleeper in connection with Gauge Conversion work from Saharsa-Forbesganj section in Samastipur Division of E.C. Rly.

Work #210
As of June 2026

Estimate Cost

₹3.41 Cr

Sanctioned estimate

Tendered Cost

₹3.24 Cr

-5.0% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹3.24 Cr
Progress100%
Started17-02-2015
Target DOC31-03-2022
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG

Work Details

5 Fields
Work No.
210
Acceptance / LOA
ECR/CAO/Con/WT/028/North/14-15/566 Dated 02.02.2015; ECR/CAO/Con/WT/Agt/01 Dtd 24.04.2015
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹3.41 Cr
Tendered Cost
₹3.24 Cr
Physical Progress
100%
Date Started
17-02-2015
Original DOC
31-03-2022
Extended DOC
N/A

Miscellaneous work of Supply, Fabrication & execution of H. Beam Sleepers and Channel sleeper in connection with Gauge Conversion work from Saharsa-Forbesganj section in Samastipur Division of E.C. Rly. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Jai Mangla Con.. The tendered cost of the work is ₹3.24 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Miscellaneous work of Supply, Fabrication & execution of H. Beam Sleepers and Ch"?
Status: Completed. This East Central Railway work is being executed by M/S Jai Mangla Con.. Physical progress stands at 100%. Current date of completion (DOC): 31-03-2022.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Jai Mangla Con.. Acceptance / agreement reference: ECR/CAO/Con/WT/028/North/14-15/566 Dated 02.02.2015; ECR/CAO/Con/WT/Agt/01 Dtd 24.04.2015. Work started on 17-02-2015.
QWhat is the cost of this railway work?
The tendered cost of "Miscellaneous work of Supply, Fabrication & execution of H. " is ₹3.24 Cr (against an estimate of ₹3.41 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Miscellaneous work of Supply, Fabrication & execution of H. " is one of hundreds of railway works covered.