East Central RailwayOverdue

Linking BG Track, supplying and spreading of ballast from railway wagon, unloading of 260R rail panel, spreading of PSC sleeper, linking and packing of points and crossings etc. between Km 0.00 to Km 18.425 including Hasanpur Road and Bithan station yard in connection with Sakri-Hasanpur Road.

Estimate Cost

₹19.50 Cr

Sanctioned estimate

Tendered Cost

₹15.90 Cr

-18.5% vs estimate

Physical Progress

88%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹15.90 Cr
Progress88%
StartedN/A
Target DOC28-02-2026

Work Details

5 Fields
Work No.
191
Agency
Jyoti Construction and Engineering Private Limited, Begusarai
At+PO-Papraur, PS Barauni, Begusarai, Bihar-851210
Acceptance / LOA
21/09/2022 ECR/ECRNC/CIVIL/2022/0001 Dt-22/12/2022
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹19.50 Cr
Tendered Cost
₹15.90 Cr
Physical Progress
88%
Date Started
N/A
Original DOC
28-02-2026
Extended DOC
N/A

Linking BG Track, supplying and spreading of ballast from railway wagon, unloading of 260R rail panel, spreading of PSC sleeper, linking and packing of points and crossings etc. between Km 0.00 to Km 18.425 including Hasanpur Road and Bithan station yard in connection with Sakri-Hasanpur Road. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Jyoti Construction and Engineering Private Limited. The tendered cost of the work is ₹15.90 Cr, and it is currently Overdue with physical progress recorded at 88%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking BG Track, supplying and spreading of ballast from railway wagon, unloadi"?
Status: Overdue (overdue). This East Central Railway work is being executed by Jyoti Construction and Engineering Private Limited. Physical progress stands at 88%. Current date of completion (DOC): 28-02-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Jyoti Construction and Engineering Private Limited, Begusarai, At+PO-Papraur, PS Barauni, Begusarai, Bihar-851210. Acceptance / agreement reference: 21/09/2022 ECR/ECRNC/CIVIL/2022/0001 Dt-22/12/2022.
QWhat is the cost of this railway work?
The tendered cost of "Linking BG Track, supplying and spreading of ballast from ra" is ₹15.90 Cr (against an estimate of ₹19.50 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG Track, supplying and spreading of ballast from ra" is one of hundreds of railway works covered.