Linking BG Track, supplying and spreading of ballast from railway wagon, unloading of 260R rail panel, spreading of PSC sleeper, linking and packing of points and crossings etc. between Km 0.00 to Km 18.425 including Hasanpur Road and Bithan station yard in connection with Sakari-Hasanpur Road.
Estimate Cost
₹19.50 Cr
Sanctioned estimate
Tendered Cost
₹15.90 Cr
-18.5% vs estimate
Physical Progress
88%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsLinking BG Track, supplying and spreading of ballast from railway wagon, unloading of 260R rail panel, spreading of PSC sleeper, linking and packing of points and crossings etc. between Km 0.00 to Km 18.425 including Hasanpur Road and Bithan station yard in connection with Sakari-Hasanpur Road. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Jyoti Construction and Engineering private limited. The tendered cost of the work is ₹15.90 Cr, and it is currently Overdue with physical progress recorded at 88%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
DOC under process
Frequently Asked Questions
- QWhat is the current status of the railway work "Linking BG Track, supplying and spreading of ballast from railway wagon, unloadi"?
- Status: Overdue (overdue). This East Central Railway work is being executed by Jyoti Construction and Engineering private limited. Physical progress stands at 88%. Current date of completion (DOC): 28-02-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Jyoti Construction and Engineering private limited, Begusarai, At + PO- Papraur PS-Barauni, Begusarai Bihar)-851210. Acceptance / agreement reference: 21/09/2022 ECR/ECRNC/CIVIL/2022/0001 Dt - 22/12/2022. Work started on 21-09-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "Linking BG Track, supplying and spreading of ballast from ra" is ₹15.90 Cr (against an estimate of ₹19.50 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG Track, supplying and spreading of ballast from ra" is one of hundreds of railway works covered.