East Central RailwayOverdue

Linking BG track manually linking level crossing spreading of ballest, unloading of 52kg rail etc. bet. Biraul (excl)-Kusheshwar Asthan(incl)

Work #168
As of June 2026

Estimate Cost

₹2.01 Cr

Sanctioned estimate

Tendered Cost

₹2.18 Cr

+8.5% vs estimate

Physical Progress

40%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹2.18 Cr
Progress40%
Started11-02-2011
Target DOC30-10-2018
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
168
Agency
Kamal kumar Jain
PO Saram, Distt-Bokaro (Jharkhand)
Acceptance / LOA
W/C/815/II/DBG/WT/09-10/17 Dt 29.11.10 ** DCE/Con/II/DBG/Agt/09-10/03 dt.18.3.10/05.02.11
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹2.01 Cr
Tendered Cost
₹2.18 Cr
Physical Progress
40%
Date Started
11-02-2011
Original DOC
28-05-2011
Extended DOC
30-10-2018

Linking BG track manually linking level crossing spreading of ballest, unloading of 52kg rail etc. bet. Biraul (excl)-Kusheshwar Asthan(incl) is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Kamal kumar Jain. The tendered cost of the work is ₹2.18 Cr, and it is currently Overdue with physical progress recorded at 40%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking BG track manually linking level crossing spreading of ballest, unloading"?
Status: Overdue (overdue). This East Central Railway work is being executed by M/s Kamal kumar Jain. Physical progress stands at 40%. Current date of completion (DOC): 30-10-2018.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Kamal kumar Jain, PO Saram, Distt-Bokaro (Jharkhand). Acceptance / agreement reference: W/C/815/II/DBG/WT/09-10/17 Dt 29.11.10 ** DCE/Con/II/DBG/Agt/09-10/03 dt.18.3.10/05.02.11. Work started on 11-02-2011.
QWhat is the cost of this railway work?
The tendered cost of "Linking BG track manually linking level crossing spreading o" is ₹2.18 Cr (against an estimate of ₹2.01 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG track manually linking level crossing spreading o" is one of hundreds of railway works covered.