East Central RailwayOverdue
Linking BG track manually linking level crossing spreading of ballest, unloading of 52kg rail etc. bet. Biraul (excl)-Kusheshwar Asthan(incl)
Estimate Cost
₹2.01 Cr
Sanctioned estimate
Tendered Cost
₹2.18 Cr
+8.5% vs estimate
Physical Progress
40%
Work completed
Status
Overdue
Past target DOC
East Central Railway — CAO (Con)Overdue
Tendered₹2.18 Cr
Progress40%
Started11-02-2011
Target DOC30-10-2018
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Work Details
5 FieldsWork No.
168
Agency
Kamal kumar Jain
PO Saram, Distt-Bokaro (Jharkhand)
Acceptance / LOA
W/C/815/II/DBG/WT/09-10/17 Dt 29.11.10 ** DCE/Con/II/DBG/Agt/09-10/03 dt.18.3.10/05.02.11
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026
Cost, Progress & Timeline
6 FieldsEstimate Cost
₹2.01 Cr
Tendered Cost
₹2.18 Cr
Physical Progress
40%
Date Started
11-02-2011
Original DOC
28-05-2011
Extended DOC
30-10-2018
Linking BG track manually linking level crossing spreading of ballest, unloading of 52kg rail etc. bet. Biraul (excl)-Kusheshwar Asthan(incl) is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Kamal kumar Jain. The tendered cost of the work is ₹2.18 Cr, and it is currently Overdue with physical progress recorded at 40%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
?
Frequently Asked Questions
- QWhat is the current status of the railway work "Linking BG track manually linking level crossing spreading of ballest, unloading"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Kamal kumar Jain. Physical progress stands at 40%. Current date of completion (DOC): 30-10-2018.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Kamal kumar Jain, PO Saram, Distt-Bokaro (Jharkhand). Acceptance / agreement reference: W/C/815/II/DBG/WT/09-10/17 Dt 29.11.10 ** DCE/Con/II/DBG/Agt/09-10/03 dt.18.3.10/05.02.11. Work started on 11-02-2011.
- QWhat is the cost of this railway work?
- The tendered cost of "Linking BG track manually linking level crossing spreading o" is ₹2.18 Cr (against an estimate of ₹2.01 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG track manually linking level crossing spreading o" is one of hundreds of railway works covered.