East Central RailwayCompleted

Balance work of linking BG track with 20 rail panel, unloading of 20 rail panel from EUR rake/BFR, supply unloading, stacking & spreading of stone ballast on ready formation, installation of glued joint in situ, transportation of P.way materials like rails, sleepers, fittings etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge conversion work from Saharsa-Forbesganj section of Samastipur division, ECR.

Estimate Cost

₹28.84 Cr

Sanctioned estimate

Tendered Cost

₹27.51 Cr

-4.6% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹27.51 Cr
Progress100%
Started10-02-2020
Target DOC27-11-2022
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
246
Acceptance / LOA
ECR-CAO-C-N-ETN-109-19-20/10114650014460 Dated 27.01.2020; ECR/CAO/Con/WT/Agt/94 Dtd 18.03.2020
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹28.84 Cr
Tendered Cost
₹27.51 Cr
Physical Progress
100%
Date Started
10-02-2020
Original DOC
27-11-2022
Extended DOC
N/A

Balance work of linking BG track with 20 rail panel, unloading of 20 rail panel from EUR rake/BFR, supply unloading, stacking & spreading of stone ballast on ready formation, installation of glued joint in situ, transportation of P.way materials like rails, sleepers, fittings etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge conversion work from Saharsa-Forbesganj section of Samastipur division, ECR. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Jyoti Construction and Engineering Pvt. Ltd.. The tendered cost of the work is ₹27.51 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 27.51 after 1st Variation 32.58

?

Frequently Asked Questions

QWhat is the current status of the railway work "Balance work of linking BG track with 20 rail panel, unloading of 20 rail panel "?
Status: Completed. This East Central Railway work is being executed by Jyoti Construction and Engineering Pvt. Ltd.. Physical progress stands at 100%. Current date of completion (DOC): 27-11-2022.
QWho is the agency for this Bihar railway project?
The agency for this work is Jyoti Construction and Engineering Pvt Ltd.. Acceptance / agreement reference: ECR-CAO-C-N-ETN-109-19-20/10114650014460 Dated 27.01.2020; ECR/CAO/Con/WT/Agt/94 Dtd 18.03.2020. Work started on 10-02-2020.
QWhat is the cost of this railway work?
The tendered cost of "Balance work of linking BG track with 20 rail panel, unloadi" is ₹27.51 Cr (against an estimate of ₹28.84 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Balance work of linking BG track with 20 rail panel, unloadi" is one of hundreds of railway works covered.