Balance work of linking BG track with 20 rail panel, unloading of 20 rail panel from EUR rake/BFR, supply unloading, stacking & spreading of stone ballast on ready formation, installation of glued joint in situ, transportation of P.way materials like rails, sleepers, fittings etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge conversion work from Saharsa-Forbesganj section of Samastipur division, ECR.
Estimate Cost
₹28.84 Cr
Sanctioned estimate
Tendered Cost
₹27.51 Cr
-4.6% vs estimate
Physical Progress
100%
Work completed
Status
Completed
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsBalance work of linking BG track with 20 rail panel, unloading of 20 rail panel from EUR rake/BFR, supply unloading, stacking & spreading of stone ballast on ready formation, installation of glued joint in situ, transportation of P.way materials like rails, sleepers, fittings etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge conversion work from Saharsa-Forbesganj section of Samastipur division, ECR. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Jyoti Construction and Engineering Pvt. Ltd.. The tendered cost of the work is ₹27.51 Cr, and it is currently Completed with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
tendered_cost_crore raw: 27.51 after 1st Variation 32.58
Frequently Asked Questions
- QWhat is the current status of the railway work "Balance work of linking BG track with 20 rail panel, unloading of 20 rail panel "?
- Status: Completed. This East Central Railway work is being executed by Jyoti Construction and Engineering Pvt. Ltd.. Physical progress stands at 100%. Current date of completion (DOC): 27-11-2022.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Jyoti Construction and Engineering Pvt Ltd.. Acceptance / agreement reference: ECR-CAO-C-N-ETN-109-19-20/10114650014460 Dated 27.01.2020; ECR/CAO/Con/WT/Agt/94 Dtd 18.03.2020. Work started on 10-02-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "Balance work of linking BG track with 20 rail panel, unloadi" is ₹27.51 Cr (against an estimate of ₹28.84 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Balance work of linking BG track with 20 rail panel, unloadi" is one of hundreds of railway works covered.