East Central RailwayFinal Bill / Closure

From Km 39.26 to Km 54.65 E/work, Construction of Minor bridge, Road under bridges (RUB & approach roads supplying, transportation & spreading blanketing material any quarry i.c.w construction of CPR-MFP new Rail line project

Estimate Cost

₹61.41 Cr

Sanctioned estimate

Tendered Cost

₹64.47 Cr

+5.0% vs estimate

Physical Progress

15%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹64.47 Cr
Progress15%
Started31-08-2018
Target DOC31-03-2024
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP

Work Details

5 Fields
Work No.
94
Agency
Phular Construction Private Limited, At-Phular
PO-Mansoor Bihar, Muzaffarpur (Bihar)
Acceptance / LOA
LoA No. ECR/CAO/Con/WT/E-tender/North/52/17-18/5145 dt 29.08.2018 Agreement ECR/CAO/Con/WT/Agt/27 dt 30.11.17
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹61.41 Cr
Tendered Cost
₹64.47 Cr
Physical Progress
15%
Date Started
31-08-2018
Original DOC
28-02-2020
Extended DOC
31-03-2024

From Km 39.26 to Km 54.65 E/work, Construction of Minor bridge, Road under bridges (RUB & approach roads supplying, transportation & spreading blanketing material any quarry i.c.w construction of CPR-MFP new Rail line project is an East Central Railway (ECR) infrastructure work in Bihar, executed by MS Phular Construction Private Limited. The tendered cost of the work is ₹64.47 Cr, and it is currently Final Bill / Closure with physical progress recorded at 15%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

(No progress due to Non-sanction of Detailed Estimate and Contractor Applied for closure of contract)

?

Frequently Asked Questions

QWhat is the current status of the railway work "From Km 39.26 to Km 54.65 E/work, Construction of Minor bridge, Road under bridg"?
Status: Final Bill / Closure. This East Central Railway work is being executed by MS Phular Construction Private Limited. Physical progress stands at 15%. Current date of completion (DOC): 31-03-2024.
QWho is the agency for this Bihar railway project?
The agency for this work is MS Phular Construction Private Limited, At-Phular, PO-Mansoor Bihar, Muzaffarpur (Bihar). Acceptance / agreement reference: LoA No. ECR/CAO/Con/WT/E-tender/North/52/17-18/5145 dt 29.08.2018 Agreement ECR/CAO/Con/WT/Agt/27 dt 30.11.17. Work started on 31-08-2018.
QWhat is the cost of this railway work?
The tendered cost of "From Km 39.26 to Km 54.65 E/work, Construction of Minor brid" is ₹64.47 Cr (against an estimate of ₹61.41 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "From Km 39.26 to Km 54.65 E/work, Construction of Minor brid" is one of hundreds of railway works covered.