Construction of foundation and substructure of important bridge (1x30.5m + 9x61.0m + 1x30.5m) through girder over Bagmati river on well foundation and Guide bund between Sitamarhi-Sheohar in connection with construction of Sitamarhi-Sheohar new line in samastipur division of E.C. Railway
Estimate Cost
₹73.10 Cr
Sanctioned estimate
Tendered Cost
₹69.25 Cr
-5.3% vs estimate
Physical Progress
5%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsConstruction of foundation and substructure of important bridge (1x30.5m + 9x61.0m + 1x30.5m) through girder over Bagmati river on well foundation and Guide bund between Sitamarhi-Sheohar in connection with construction of Sitamarhi-Sheohar new line in samastipur division of E.C. Railway is an East Central Railway (ECR) infrastructure work in Bihar, executed by DURGA KRISHNA STORE PRIVATE LIMITED-GUWAHATI. The tendered cost of the work is ₹69.25 Cr, and it is currently In Progress with physical progress recorded at 5%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress.
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of foundation and substructure of important bridge (1x30.5m + 9x61."?
- Status: In Progress. This East Central Railway work is being executed by DURGA KRISHNA STORE PRIVATE LIMITED-GUWAHATI. Physical progress stands at 5%. Current date of completion (DOC): 31-05-2027.
- QWho is the agency for this Bihar railway project?
- The agency for this work is DURGA KRISHNA STORE PRIVATE LIMITED-GUWAHATI, 2ND FLOOR, SC-5, PARMESHWARI BUILDING, CHATRIBARI ROAD, GUWAHATI, KAMRUP, ASSAM, GUWAHATI, Assam -781001 India. Acceptance / agreement reference: ECR/ECRC/Civil/2024/0032 Date- 20.04.2024. Work started on 16-12-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of foundation and substructure of important bri" is ₹69.25 Cr (against an estimate of ₹73.10 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation and substructure of important bri" is one of hundreds of railway works covered.