East Central RailwayIn Progress

Final Location survey for Raxaul-Kathmandu new electrified rail link (funded by MEA) (136 Km).

Work #314
As of June 2026

Estimate Cost

₹36.39 Cr

Sanctioned estimate

Tendered Cost

₹30.44 Cr

-16.4% vs estimate

Physical Progress

96%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹30.44 Cr
Progress96%
Started04-01-2021
Target DOC31-07-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
314
Agency
Konkan Railway Corporation Limited
Balapur Bhawan, Sector-II, CBD, Belapur, Navi Mumbai-400614
Acceptance / LOA
LOA No ECR/CAO/Con/North/Single-01-19-20 dated 13.03.2020
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹36.39 Cr
Tendered Cost
₹30.44 Cr
Physical Progress
96%
Date Started
04-01-2021
Original DOC
31-07-2026
Extended DOC
N/A

Final Location survey for Raxaul-Kathmandu new electrified rail link (funded by MEA) (136 Km). is an East Central Railway (ECR) infrastructure work in Bihar, executed by Konkan Railway Corporation Limited. The tendered cost of the work is ₹30.44 Cr, and it is currently In Progress with physical progress recorded at 96%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Final Location survey for Raxaul-Kathmandu new electrified rail link (funded by "?
Status: In Progress. This East Central Railway work is being executed by Konkan Railway Corporation Limited. Physical progress stands at 96%. Current date of completion (DOC): 31-07-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Konkan Railway Corporation Limited, Balapur Bhawan, Sector-II, CBD, Belapur, Navi Mumbai-400614. Acceptance / agreement reference: LOA No ECR/CAO/Con/North/Single-01-19-20 dated 13.03.2020. Work started on 04-01-2021.
QWhat is the cost of this railway work?
The tendered cost of "Final Location survey for Raxaul-Kathmandu new electrified r" is ₹30.44 Cr (against an estimate of ₹36.39 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Final Location survey for Raxaul-Kathmandu new electrified r" is one of hundreds of railway works covered.