E-Tender No. ECR-CAO-C-N-ETN-130-19-20 closing date 12-03-2020 for Transportation, assembly, erection and launching of girders of major bridge No. 248, bridge No. 260, bridge No. 274, bridge No. 279, bridge No. 283, bridge No. 286, bridge No. 287, and important bridge No. 285; supply & fixing of bearings, supply & fabrication of H-beam/steel channel sleepers including track linking over bridges and other ancillary & miscellaneous work in connection with doubling work of Sagauli-Narkatiaganj section under Dy. CE/Con/Bettiah of East Central Railway.
Estimate Cost
₹9.04 Cr
Sanctioned estimate
Tendered Cost
₹10.25 Cr
+13.4% vs estimate
Physical Progress
100%
Work completed
Status
Final Bill / Closure
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsE-Tender No. ECR-CAO-C-N-ETN-130-19-20 closing date 12-03-2020 for Transportation, assembly, erection and launching of girders of major bridge No. 248, bridge No. 260, bridge No. 274, bridge No. 279, bridge No. 283, bridge No. 286, bridge No. 287, and important bridge No. 285; supply & fixing of bearings, supply & fabrication of H-beam/steel channel sleepers including track linking over bridges and other ancillary & miscellaneous work in connection with doubling work of Sagauli-Narkatiaganj section under Dy. CE/Con/Bettiah of East Central Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Pilcon Engineering-Nagpur. The tendered cost of the work is ₹10.25 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
progress note: 100% (Work physically completed. Final bill under process.)
Frequently Asked Questions
- QWhat is the current status of the railway work "E-Tender No. ECR-CAO-C-N-ETN-130-19-20 closing date 12-03-2020 for Transportatio"?
- Status: Final Bill / Closure. This East Central Railway work is being executed by M/s Pilcon Engineering-Nagpur. Physical progress stands at 100%. Current date of completion (DOC): 30-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Pilcon Engineering-Nagpur, 16-19, Najaf Colony, Sadiqabad, Nagpur-440030, Maharashtra, India. Acceptance / agreement reference: ECR/CAO/C/N/ETN-130/19-20 dated. 02.07.2020. Work started on 02-07-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "E-Tender No. ECR-CAO-C-N-ETN-130-19-20 closing date 12-03-20" is ₹10.25 Cr (against an estimate of ₹9.04 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender No. ECR-CAO-C-N-ETN-130-19-20 closing date 12-03-20" is one of hundreds of railway works covered.