E-Tender No. ECR-CAO-C-N-ETN-08-20-21 closing date 28-05-2020 14:30 for Construction of Station-Cum-S&T-building, gate, lodges, PF sheds, Foot Over Bridges, Passenger Platforms, Station approch roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulatin area, Cosntruction and fixing of various sectional boards and other allied and misc. work between Bettiah (excluding) to Narkatiaganj (excluding) in connection with SGL-NKE doubling project under Dy.CE/Con/BTH in Samastipur Division.
Estimate Cost
₹39.30 Cr
Sanctioned estimate
Tendered Cost
₹43.24 Cr
+10.0% vs estimate
Physical Progress
100%
Work completed
Status
Final Bill / Closure
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsE-Tender No. ECR-CAO-C-N-ETN-08-20-21 closing date 28-05-2020 14:30 for Construction of Station-Cum-S&T-building, gate, lodges, PF sheds, Foot Over Bridges, Passenger Platforms, Station approch roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulatin area, Cosntruction and fixing of various sectional boards and other allied and misc. work between Bettiah (excluding) to Narkatiaganj (excluding) in connection with SGL-NKE doubling project under Dy.CE/Con/BTH in Samastipur Division. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Saurabh Kumar and Brothers. The tendered cost of the work is ₹43.24 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work physically completed. Final bill under process.
Frequently Asked Questions
- QWhat is the current status of the railway work "E-Tender No. ECR-CAO-C-N-ETN-08-20-21 closing date 28-05-2020 14:30 for Construc"?
- Status: Final Bill / Closure. This East Central Railway work is being executed by Saurabh Kumar and Brothers. Physical progress stands at 100%. Current date of completion (DOC): 30-09-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Saurabh Kumar and Brothers, Jaridih Bazar, Bermo, Bokaro, Jharkhand.. Acceptance / agreement reference: ECR/CAO/Con/WT/Agt./134/ dated. 20.10.2020.. Work started on 26-08-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "E-Tender No. ECR-CAO-C-N-ETN-08-20-21 closing date 28-05-202" is ₹43.24 Cr (against an estimate of ₹39.30 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender No. ECR-CAO-C-N-ETN-08-20-21 closing date 28-05-202" is one of hundreds of railway works covered.