East Central RailwayIn Progress

Composite Works (Civil, Electrical, Mechanical & Telecom) involving construction of Industrial sheds, Track works, ESS building, Drainage system, Road works, Landscaping, Electrification, and illumination works, procurement and commissioning of Specified Mechanical Machineries & Plant (EOT cranes etc) in connection with (i) Facilities for SSI/IOH of LHB bogies at SPJ depot (ii) Extension of C-Category shed at extended area of Samastipur Workshop for augmentation of production of new wagons at Mechanical Workshop Samastipur, Dist-Samastipur, Bihar

Work #203
As of June 2026

Estimate Cost

N/A

Sanctioned estimate

Tendered Cost

₹27.81 Cr

Awarded value

Physical Progress

15%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹27.81 Cr
Progress15%
Started25-09-2024
Target DOC31-07-2026
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ

Work Details

5 Fields
Work No.
203
Acceptance / LOA
WPO-HQ-Mechanical/WP-Mech-SPJ-WT/30-Open/10040880079938 dt 26.06.23
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
N/A
Tendered Cost
₹27.81 Cr
Physical Progress
15%
Date Started
25-09-2024
Original DOC
31-07-2026
Extended DOC
N/A

Composite Works (Civil, Electrical, Mechanical & Telecom) involving construction of Industrial sheds, Track works, ESS building, Drainage system, Road works, Landscaping, Electrification, and illumination works, procurement and commissioning of Specified Mechanical Machineries & Plant (EOT cranes etc) in connection with (i) Facilities for SSI/IOH of LHB bogies at SPJ depot (ii) Extension of C-Category shed at extended area of Samastipur Workshop for augmentation of production of new wagons at Mechanical Workshop Samastipur, Dist-Samastipur, Bihar is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s HYT Engineering Co Pvt. Ltd.-Pune. The tendered cost of the work is ₹27.81 Cr, and it is currently In Progress with physical progress recorded at 15%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Composite Works (Civil, Electrical, Mechanical & Telecom) involving construction"?
Status: In Progress. This East Central Railway work is being executed by M/s HYT Engineering Co Pvt. Ltd.-Pune. Physical progress stands at 15%. Current date of completion (DOC): 31-07-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s HYT Engineering Co Pvt Ltd-Pune. Acceptance / agreement reference: WPO-HQ-Mechanical/WP-Mech-SPJ-WT/30-Open/10040880079938 dt 26.06.23. Work started on 25-09-2024.
QWhat is the cost of this railway work?
The tendered cost of "Composite Works (Civil, Electrical, Mechanical & Telecom) in" is ₹27.81 Cr. This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Composite Works (Civil, Electrical, Mechanical & Telecom) in" is one of hundreds of railway works covered.