East Central RailwayIn Progress

Linking of BG track, dismantling BG track & point and crossing, carting & stacking of released materials, linking of level crossing, unloading & spreading of ballast, unloading 52 Kg/60 Kg rails and panels, spreading of PSC sleeper, Linking and packing of BG track, point and crossing, transportation and leading P. Way materials etc. between NKE (including) to VKNR (including) in connection with doubling of NKE-VKNR

Work #319
As of June 2026

Estimate Cost

₹14.37 Cr

Sanctioned estimate

Tendered Cost

₹16.49 Cr

+14.8% vs estimate

Physical Progress

70%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹16.49 Cr
Progress70%
Started28-11-2019
Target DOC31-10-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram, AEN/C/NKE

Work Details

5 Fields
Work No.
319
Agency
Sidhu Enterprises
Sir Ganeshdutt Nagar Road No. 4, Bhagwanpur, Muzaffarpur-842001
Acceptance / LOA
LOA No.:- ECR/CAO/Con/North/ETN-36-19-20 Dated 28.11.2019.
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹14.37 Cr
Tendered Cost
₹16.49 Cr
Physical Progress
70%
Date Started
28-11-2019
Original DOC
31-10-2026
Extended DOC
N/A

Linking of BG track, dismantling BG track & point and crossing, carting & stacking of released materials, linking of level crossing, unloading & spreading of ballast, unloading 52 Kg/60 Kg rails and panels, spreading of PSC sleeper, Linking and packing of BG track, point and crossing, transportation and leading P. Way materials etc. between NKE (including) to VKNR (including) in connection with doubling of NKE-VKNR is an East Central Railway (ECR) infrastructure work in Bihar, executed by Sidhu Enterprises. The tendered cost of the work is ₹16.49 Cr, and it is currently In Progress with physical progress recorded at 70%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking of BG track, dismantling BG track & point and crossing, carting & stacki"?
Status: In Progress. This East Central Railway work is being executed by Sidhu Enterprises. Physical progress stands at 70%. Current date of completion (DOC): 31-10-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Sidhu Enterprises, Sir Ganeshdutt Nagar Road No. 4, Bhagwanpur, Muzaffarpur-842001. Acceptance / agreement reference: LOA No.:- ECR/CAO/Con/North/ETN-36-19-20 Dated 28.11.2019.. Work started on 28-11-2019.
QWhat is the cost of this railway work?
The tendered cost of "Linking of BG track, dismantling BG track & point and crossi" is ₹16.49 Cr (against an estimate of ₹14.37 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking of BG track, dismantling BG track & point and crossi" is one of hundreds of railway works covered.