Linking of BG track, dismantling BG track & point and crossing, carting & stacking of released materials, linking of level crossing, unloading & spreading of ballast, unloading 52 Kg/60 Kg rails and panels, spreading of PSC sleeper, Linking and packing of BG track, point and crossing, transportation and leading P. Way materials etc. between NKE (including) to VKNR (including) in connection with doubling of NKE-VKNR
Estimate Cost
₹14.37 Cr
Sanctioned estimate
Tendered Cost
₹16.49 Cr
+14.8% vs estimate
Physical Progress
70%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsLinking of BG track, dismantling BG track & point and crossing, carting & stacking of released materials, linking of level crossing, unloading & spreading of ballast, unloading 52 Kg/60 Kg rails and panels, spreading of PSC sleeper, Linking and packing of BG track, point and crossing, transportation and leading P. Way materials etc. between NKE (including) to VKNR (including) in connection with doubling of NKE-VKNR is an East Central Railway (ECR) infrastructure work in Bihar, executed by Sidhu Enterprises. The tendered cost of the work is ₹16.49 Cr, and it is currently In Progress with physical progress recorded at 70%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Linking of BG track, dismantling BG track & point and crossing, carting & stacki"?
- Status: In Progress. This East Central Railway work is being executed by Sidhu Enterprises. Physical progress stands at 70%. Current date of completion (DOC): 31-10-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Sidhu Enterprises, Sir Ganeshdutt Nagar Road No. 4, Bhagwanpur, Muzaffarpur-842001. Acceptance / agreement reference: LOA No.:- ECR/CAO/Con/North/ETN-36-19-20 Dated 28.11.2019.. Work started on 28-11-2019.
- QWhat is the cost of this railway work?
- The tendered cost of "Linking of BG track, dismantling BG track & point and crossi" is ₹16.49 Cr (against an estimate of ₹14.37 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking of BG track, dismantling BG track & point and crossi" is one of hundreds of railway works covered.