Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Infrastructure

Supply & installation of LED Flood Light System with DMX Control suitable for Cricket Sports with Mast, Main Electrical Power Panel,HMLDB, UG cable, G.I Strip with civil foundation etc. under Construction of State Sports Academy cum International Standard Modern Cricket Stadium at Rajgir, Nalanda (Bihar)

Building Construction Department

Tender Amount

₹18.88 Cr

Awarded Cost

₹15.38 Cr

Start Date

Completion

Project Details

DistrictNalanda
DepartmentBuilding Construction Department
CategoryInfrastructure
StatusOngoing
ContractorM/s BAJAJ ELECTRICALS LIMITED

Financial & Timeline

Tender Amount₹18.88 Cr
Awarded Cost₹15.38 Cr
Start Date
End Date
Last Updated

Executing Contractor

M/s BAJAJ ELECTRICALS LIMITED

Project Overview

Supply & installation of LED Flood Light System with DMX Control suitable for Cricket Sports with Mast, Main Electrical Power Panel,HMLDB, UG cable, G.I Strip with civil foundation etc. under Construction of State Sports Academy cum International Standard Modern Cricket Stadium at Rajgir, Nalanda (Bihar) is a infrastructure project in Nalanda district, Bihar, being implemented by Building Construction Department. The project has an approved cost of ₹15.38 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Supply & installation of LED Flood Light System with DMX Control suitable for Cr"?
The current status of this project is "Ongoing". This is a infrastructure project in Nalanda district, Bihar.
Which department is responsible for this project?
This project is being implemented by Building Construction Department, Government of Bihar. It falls under the Infrastructure category and is located in Nalanda district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹15.38 Cr. This is a infrastructure project funded by the Government of Bihar under Building Construction Department.