Bihar Infrastructure ProjectOngoing
Water Resources
Raising, Strengthening of Embankment as per BIS Code and new HFL observed in 2024 and Blacktopping with Protection work of Bagmati Left Embankment0.00 Km to 7.27 Km, LeftAfflux Embankment 0.00 Km to 8.04 Km and Right Embankment 0.00 Km to 9.72 Km, DOAB Embankment 9.00 Km to 10.00 Km and Bairganiya Ring Bundh 0.00 Km to 6.60 Km.
Water Resources Department
Tender Amount
₹262.32 Cr
Awarded Cost
₹227.88 Cr
Start Date
—
Completion
—
Project Details
DistrictSitamarhi
DepartmentWater Resources Department
CategoryWater Resources
StatusOngoing
ContractorM/s GAWAR CONSTRUCTION LIMITED
Financial & Timeline
Tender Amount₹262.32 Cr
Awarded Cost₹227.88 Cr
Start Date—
End Date—
Last Updated—
Executing Contractor
M/s GAWAR CONSTRUCTION LIMITED
Project Overview
Raising, Strengthening of Embankment as per BIS Code and new HFL observed in 2024 and Blacktopping with Protection work of Bagmati Left Embankment0.00 Km to 7.27 Km, LeftAfflux Embankment 0.00 Km to 8.04 Km and Right Embankment 0.00 Km to 9.72 Km, DOAB Embankment 9.00 Km to 10.00 Km and Bairganiya Ring Bundh 0.00 Km to 6.60 Km. is a water resources project in Sitamarhi district, Bihar, being implemented by Water Resources Department. The project has an approved cost of ₹227.88 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Raising, Strengthening of Embankment as per BIS Code and new HFL observed in 202"?
- The current status of this project is "Ongoing". This is a water resources project in Sitamarhi district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Water Resources Department, Government of Bihar. It falls under the Water Resources category and is located in Sitamarhi district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹227.88 Cr. This is a water resources project funded by the Government of Bihar under Water Resources Department.