Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25. (Block:- Khushrupur (1). Panchayat:-Sukarbeg Chak, Habitation Ward No.4,10,11,12 (2). Panchayat:-Mosimpur, Habitation Ward No.5,7,9 (3). Panchayat:-Hardas Bigha Habitation Ward No.1,4A,4B,6,7A,7B,8,14 (4). Panchayat:-Alawalpur, Habitation Ward No.2,3,12A,12B,13).

Public Health Engineering Department

Tender Amount

₹5.23 Cr

Awarded Cost

₹5.21 Cr

Start Date

Completion

Project Details

DistrictPatna
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorANIL SINGH

Financial & Timeline

Tender Amount₹5.23 Cr
Awarded Cost₹5.21 Cr
Start Date
End Date
Last Updated

Executing Contractor

ANIL SINGH

Project Overview

Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25. (Block:- Khushrupur (1). Panchayat:-Sukarbeg Chak, Habitation Ward No.4,10,11,12 (2). Panchayat:-Mosimpur, Habitation Ward No.5,7,9 (3). Panchayat:-Hardas Bigha Habitation Ward No.1,4A,4B,6,7A,7B,8,14 (4). Panchayat:-Alawalpur, Habitation Ward No.2,3,12A,12B,13). is a water resources project in Patna district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹5.21 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Su"?
The current status of this project is "Ongoing". This is a water resources project in Patna district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Patna district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹5.21 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.