Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25. (Block:-Barh, (1). Panchayat:- Bhatgaon, Habitation ward No. 1,2,3,5,6,8,9,10,15,16A,16B (2).Panchayat:-Sarkati Saidpur Habitation ward No.10,11 (3). Panchayat:- Rana Bigha, Habitation ward No.8 (4).Panchayat:- Nawada, Habitation ward No. 1,2,4,7,11,13 (5) Panchayat:- Ibrahimpur, Habitation ward No. 15 (6). Panchayat:- Dhanwan Mobarakpur, Habitation ward No. 2,11,14 (7). Panchayat:- Nadwan, Habitation ward No. 5,3,12) (8). Ekdanda Ward No.3
Tender Amount
₹6.50 Cr
Awarded Cost
₹6.50 Cr
Start Date
—
Completion
—
Project Details
Financial & Timeline
Executing Contractor
M/s AVIAN INFRASTRUCTURE AND ENERGY PRIVATE LIMITED
Project Overview
Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25. (Block:-Barh, (1). Panchayat:- Bhatgaon, Habitation ward No. 1,2,3,5,6,8,9,10,15,16A,16B (2).Panchayat:-Sarkati Saidpur Habitation ward No.10,11 (3). Panchayat:- Rana Bigha, Habitation ward No.8 (4).Panchayat:- Nawada, Habitation ward No. 1,2,4,7,11,13 (5) Panchayat:- Ibrahimpur, Habitation ward No. 15 (6). Panchayat:- Dhanwan Mobarakpur, Habitation ward No. 2,11,14 (7). Panchayat:- Nadwan, Habitation ward No. 5,3,12) (8). Ekdanda Ward No.3 is a water resources project in Nawada district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹6.50 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Su"?
- The current status of this project is "Ongoing". This is a water resources project in Nawada district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Nawada district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹6.50 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.