Bihar Infrastructure ProjectOngoing
Water Resources
NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEME SYSTEM (WLS) WITH ELECTRIC DRIVEN PUMPS ON TURN KEY BASIS WITH 3 MONTHS TRIAL RUN AFTER COMPLETION AND SUCCESSFUL COMMISSIONING UNDER BLOCK- ATRI DISTRICT GAYA, P.H. DIV. GAYA FOR YEAR 2024-25
Public Health Engineering Department
Tender Amount
₹4.63 Cr
Awarded Cost
₹4.48 Cr
Start Date
—
Completion
—
Project Details
DistrictGaya
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorM/s SKE WORKS PRIVATE LIMITED
Financial & Timeline
Tender Amount₹4.63 Cr
Awarded Cost₹4.48 Cr
Start Date—
End Date—
Last Updated—
Executing Contractor
M/s SKE WORKS PRIVATE LIMITED
Project Overview
NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEME SYSTEM (WLS) WITH ELECTRIC DRIVEN PUMPS ON TURN KEY BASIS WITH 3 MONTHS TRIAL RUN AFTER COMPLETION AND SUCCESSFUL COMMISSIONING UNDER BLOCK- ATRI DISTRICT GAYA, P.H. DIV. GAYA FOR YEAR 2024-25 is a water resources project in Gaya district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹4.48 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATE"?
- The current status of this project is "Ongoing". This is a water resources project in Gaya district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Gaya district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹4.48 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.