Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEME SYSTEM (WLS) WITH ELECTRIC DRIVEN PUMPS ON TURN KEY BASIS WITH 3 MONTHS TRIAL RUN AFTER COMPLETION AND SUCCESSFUL COMMISSIONING BLOCK-MOHRA UNDER DISTRICT GAYA, P.H. DIV. GAYA FOR YEAR 2024-25

Public Health Engineering Department

Tender Amount

₹11.01 Cr

Awarded Cost

₹10.88 Cr

Start Date

Completion

Project Details

DistrictGaya
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorKISHAN SEVA KENDRA

Financial & Timeline

Tender Amount₹11.01 Cr
Awarded Cost₹10.88 Cr
Start Date
End Date
Last Updated

Executing Contractor

KISHAN SEVA KENDRA

Project Overview

NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEME SYSTEM (WLS) WITH ELECTRIC DRIVEN PUMPS ON TURN KEY BASIS WITH 3 MONTHS TRIAL RUN AFTER COMPLETION AND SUCCESSFUL COMMISSIONING BLOCK-MOHRA UNDER DISTRICT GAYA, P.H. DIV. GAYA FOR YEAR 2024-25 is a water resources project in Gaya district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹10.88 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "NAME OF THE WORK: DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATE"?
The current status of this project is "Ongoing". This is a water resources project in Gaya district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Gaya district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹10.88 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.