Name of The Work: Comprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in Block MAHNAR total no. of Panchayat:- 14, Ward:- 145,Scheme:-151, [ Hasanpur North-15,Hasanpur South-08, Alipur Hatta-10,Lawapur Mahnar-08, Lawapur Narayan-14, Basdevpur Chandel-11, Chmarhara-08, Dedhpura-04, Gorigama-11, Karnauti-17, Mahindwara-15, Mohamadpur-11, Paharpur Bishunpur-11, Sarmastpur-08.] in Block DESARI total no. of Panchayat:- 8, Ward:- 41,Scheme:-42,[ Jafrabad-06, Desari-05, Ufraul-03, Bikhanpura-06, Azampur-02, Dharampur Ramrai-04, Jahangirpur-06, Rasulpur Habib-10.] and in Block SAHDEI BUZURG total no. of Panchayat:- 11, Ward:- 78,Scheme:-83 [Bajitpur Chaksturi-06, Sahdei Buzurg-06 Murautpur-07,Sultanpur-16,Majruhi urf Saharia-11, Chakjamal-05,Nayagaon East-03, Chakfaiz-05, Nayagaon West-08, Pohiyar Buzur
Tender Amount
₹5.98 Cr
Awarded Cost
₹5.79 Cr
Start Date
—
Completion
—
Project Details
Financial & Timeline
Executing Contractor
MAA AMBEY ENTERPRISES
Project Overview
Name of The Work: Comprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in Block MAHNAR total no. of Panchayat:- 14, Ward:- 145,Scheme:-151, [ Hasanpur North-15,Hasanpur South-08, Alipur Hatta-10,Lawapur Mahnar-08, Lawapur Narayan-14, Basdevpur Chandel-11, Chmarhara-08, Dedhpura-04, Gorigama-11, Karnauti-17, Mahindwara-15, Mohamadpur-11, Paharpur Bishunpur-11, Sarmastpur-08.] in Block DESARI total no. of Panchayat:- 8, Ward:- 41,Scheme:-42,[ Jafrabad-06, Desari-05, Ufraul-03, Bikhanpura-06, Azampur-02, Dharampur Ramrai-04, Jahangirpur-06, Rasulpur Habib-10.] and in Block SAHDEI BUZURG total no. of Panchayat:- 11, Ward:- 78,Scheme:-83 [Bajitpur Chaksturi-06, Sahdei Buzurg-06 Murautpur-07,Sultanpur-16,Majruhi urf Saharia-11, Chakjamal-05,Nayagaon East-03, Chakfaiz-05, Nayagaon West-08, Pohiyar Buzur is a water resources project in Vaishali district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹5.79 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Name of The Work: Comprehensive operation and maintenance and Special repair o"?
- The current status of this project is "Ongoing". This is a water resources project in Vaishali district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Vaishali district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹5.79 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.