Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Energy

Design, Manufacture, Testing, Supply and Delivery of 01 (One) complete set of Aluminium based re-usable Emergency Restoration System (ERS) (10 Tension Type + 06 Suspension Type) (Monopole Design) suitable for 132 kV and 220 kV Transmission Lines.

Bihar State Power Transmission Company Limited

Tender Amount

₹24.01 Cr

Awarded Cost

₹14.84 Cr

Start Date

Completion

Project Details

DistrictState Wide
DepartmentBihar State Power Transmission Company Limited
CategoryEnergy
StatusOngoing
ContractorMADHAV ENGINEERS PRIVATE LIMITED

Financial & Timeline

Tender Amount₹24.01 Cr
Awarded Cost₹14.84 Cr
Start Date
End Date
Last Updated

Executing Contractor

MADHAV ENGINEERS PRIVATE LIMITED

Project Overview

Design, Manufacture, Testing, Supply and Delivery of 01 (One) complete set of Aluminium based re-usable Emergency Restoration System (ERS) (10 Tension Type + 06 Suspension Type) (Monopole Design) suitable for 132 kV and 220 kV Transmission Lines. is a energy project in State Wide district, Bihar, being implemented by Bihar State Power Transmission Company Limited. The project has an approved cost of ₹14.84 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Manufacture, Testing, Supply and Delivery of 01 (One) complete set of Al"?
The current status of this project is "Ongoing". This is a energy project in State Wide district, Bihar.
Which department is responsible for this project?
This project is being implemented by Bihar State Power Transmission Company Limited, Government of Bihar. It falls under the Energy category and is located in State Wide district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹14.84 Cr. This is a energy project funded by the Government of Bihar under Bihar State Power Transmission Company Limited.