Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Energy

Design, Manufacture, Fabrication, Testing and Inspection, Packing, Supply and Installation of FRP (Fiber Reinforced Plastic) Fencing for Safety With Necessary Hardware, Accessories, Fittings, etc for Distribution Transformer Stations under NBPDCL/ SBPDCL on Turnkey Basis

NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED

Tender Amount

₹22.05 Cr

Awarded Cost

₹15.93 Cr

Start Date

Completion

Project Details

DistrictState Wide
DepartmentNORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED
CategoryEnergy
StatusOngoing
ContractorEPP Composites PVT LTD

Financial & Timeline

Tender Amount₹22.05 Cr
Awarded Cost₹15.93 Cr
Start Date
End Date
Last Updated

Executing Contractor

EPP Composites PVT LTD

Project Overview

Design, Manufacture, Fabrication, Testing and Inspection, Packing, Supply and Installation of FRP (Fiber Reinforced Plastic) Fencing for Safety With Necessary Hardware, Accessories, Fittings, etc for Distribution Transformer Stations under NBPDCL/ SBPDCL on Turnkey Basis is a energy project in State Wide district, Bihar, being implemented by NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED. The project has an approved cost of ₹15.93 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Manufacture, Fabrication, Testing and Inspection, Packing, Supply and In"?
The current status of this project is "Ongoing". This is a energy project in State Wide district, Bihar.
Which department is responsible for this project?
This project is being implemented by NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED, Government of Bihar. It falls under the Energy category and is located in State Wide district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹15.93 Cr. This is a energy project funded by the Government of Bihar under NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED.