Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps in Left out PRD Habitation\ Wards in Jamui Districts of Bihar on turn-key basis with 3 months Trial Run under Mukhya Mantri Nishchay Yojna on Turn Key basis under P. H. Dvision, Jamui Block-SIKANDRA(Details as per Abstract of BOQ)

Public Health Engineering Department

Tender Amount

₹5.71 Cr

Awarded Cost

₹5.03 Cr

Start Date

Completion

Project Details

DistrictJamui
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorSHIVAM INFRA

Financial & Timeline

Tender Amount₹5.71 Cr
Awarded Cost₹5.03 Cr
Start Date
End Date
Last Updated

Executing Contractor

SHIVAM INFRA

Project Overview

Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps in Left out PRD Habitation\ Wards in Jamui Districts of Bihar on turn-key basis with 3 months Trial Run under Mukhya Mantri Nishchay Yojna on Turn Key basis under P. H. Dvision, Jamui Block-SIKANDRA(Details as per Abstract of BOQ) is a water resources project in Jamui district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹5.03 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes wit"?
The current status of this project is "Ongoing". This is a water resources project in Jamui district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Jamui district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹5.03 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.