Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps For Left Out Tolas of Prd Wards in Bhagalpur Districts of Bihar on turn-key basis with 3 months Trial Run after successful completion of Trial Run Period under Mukhya Mantri Nishchay Yojna on Turn Key basis under P. H. Dvision Bhagalpur West, Bhagalpur [BLOCK-NATHNAGAR, PANCHAYAT-KAJRAILY WARD NO.-1A, 1B, 2A, 2B, 4A, (6A+11A), 10A, 10B, 12A, 12B, 14A, 14B, PANCHAYAT-BISHANRAMPUR WARD NO.-1A, 1B, 2A, 3A, 3B, 4B, 7A, 8A, 11A, 12A, 13A PANCHAYAT-GOURACHAUKI WARD NO.-9A, 8A, 6A, (4A+5A), 12A, PANCHAYAT-NISFAMBE WARD NO.-2A, 7A, PANCHAYAT-BELKHORIYA WARD NO.-11A PANCHAYAT-RAMPURKHURD WARD NO.-10A, 6A, 9A, 8A, 8B, (1A+3A) (TOTAL 37 NOS. SCHEMES)] (Group No-03)
Tender Amount
₹6.66 Cr
Awarded Cost
₹6.05 Cr
Start Date
—
Completion
—
Project Details
Financial & Timeline
Executing Contractor
M/s MANGLAM AGROCON (INDIA) PRIVATE LIMITED
Project Overview
Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps For Left Out Tolas of Prd Wards in Bhagalpur Districts of Bihar on turn-key basis with 3 months Trial Run after successful completion of Trial Run Period under Mukhya Mantri Nishchay Yojna on Turn Key basis under P. H. Dvision Bhagalpur West, Bhagalpur [BLOCK-NATHNAGAR, PANCHAYAT-KAJRAILY WARD NO.-1A, 1B, 2A, 2B, 4A, (6A+11A), 10A, 10B, 12A, 12B, 14A, 14B, PANCHAYAT-BISHANRAMPUR WARD NO.-1A, 1B, 2A, 3A, 3B, 4B, 7A, 8A, 11A, 12A, 13A PANCHAYAT-GOURACHAUKI WARD NO.-9A, 8A, 6A, (4A+5A), 12A, PANCHAYAT-NISFAMBE WARD NO.-2A, 7A, PANCHAYAT-BELKHORIYA WARD NO.-11A PANCHAYAT-RAMPURKHURD WARD NO.-10A, 6A, 9A, 8A, 8B, (1A+3A) (TOTAL 37 NOS. SCHEMES)] (Group No-03) is a water resources project in Bhagalpur district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹6.05 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes wit"?
- The current status of this project is "Ongoing". This is a water resources project in Bhagalpur district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Bhagalpur district.
- What is the cost of this Bihar infrastructure project?