Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEMES WITH ELECTRIC DRIVEN MOTER PUMPS AND ARSENIC REMOVEL TREATMENT PLANT HAVING TECHNOLOGY (ADSORPTION/ION EXCHANGE/MEMBRANE/NANO TECHNOLOGY ETC.) OF CSIR OR CERTIFIED BY CSIR OR ANY OTHER TECHNOLOGY ENDORSED/APPROVED BY GOI IN THE ARSENIC AFFECTED LEFT OUT HABITATIONS WARD NO. 3,8 (RAY TOLA) PANCHAYAT-BALKRISHNAPUR MORWA, WARD NO.-6,7,10 (YADAV TOLA), PANCHAYAT-BANGRAHA, WARD NO.-6,7,13,14 (YADAV TOLA), PANCHAYAT-SHERPUR DHEPURA, WARD NO. 11(BRAHMAN TOLA), PANCHAYAT-BADHAUNA, WARD NO. 1,2(MUSHAR TOLA), 4,5,6,7,8,9,11(YADAV TOLA), PANCHAYAT-KANCHA, WARD NO.1,2,11B (RAY TOLA) PANCHAYAT-MAU DHANESHPUR NORTH, WARD NO. 4(DHANU TOLA), PANCHAYAT- MAU DHANESHPUR SOUTH, WARD NO.11(RAJPUT TOLA), PANCHAYAT-SAHIT, WARD NO. 10,12,13,14(YADAV TOLA), PANCHAYAT-SIMRI, WARD NO. 4,7,11 (YADAV TOLA), PANCHAYAT- GARSISHI, WARD NO.- 01 ( NEPAL TOLA ) PANCHAYAT- SAHIT, WARD NO.-02 ( RAJPUT TOLA ) PANCHAYAT- SAHIT, W-03( MUSAH

Public Health Engineering Department

Tender Amount

₹24.14 Cr

Awarded Cost

₹21.21 Cr

Start Date

Completion

Project Details

DistrictSamastipur
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorBRAJESH KUMAR

Financial & Timeline

Tender Amount₹24.14 Cr
Awarded Cost₹21.21 Cr
Start Date
End Date
Last Updated

Executing Contractor

BRAJESH KUMAR

Project Overview

DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEMES WITH ELECTRIC DRIVEN MOTER PUMPS AND ARSENIC REMOVEL TREATMENT PLANT HAVING TECHNOLOGY (ADSORPTION/ION EXCHANGE/MEMBRANE/NANO TECHNOLOGY ETC.) OF CSIR OR CERTIFIED BY CSIR OR ANY OTHER TECHNOLOGY ENDORSED/APPROVED BY GOI IN THE ARSENIC AFFECTED LEFT OUT HABITATIONS WARD NO. 3,8 (RAY TOLA) PANCHAYAT-BALKRISHNAPUR MORWA, WARD NO.-6,7,10 (YADAV TOLA), PANCHAYAT-BANGRAHA, WARD NO.-6,7,13,14 (YADAV TOLA), PANCHAYAT-SHERPUR DHEPURA, WARD NO. 11(BRAHMAN TOLA), PANCHAYAT-BADHAUNA, WARD NO. 1,2(MUSHAR TOLA), 4,5,6,7,8,9,11(YADAV TOLA), PANCHAYAT-KANCHA, WARD NO.1,2,11B (RAY TOLA) PANCHAYAT-MAU DHANESHPUR NORTH, WARD NO. 4(DHANU TOLA), PANCHAYAT- MAU DHANESHPUR SOUTH, WARD NO.11(RAJPUT TOLA), PANCHAYAT-SAHIT, WARD NO. 10,12,13,14(YADAV TOLA), PANCHAYAT-SIMRI, WARD NO. 4,7,11 (YADAV TOLA), PANCHAYAT- GARSISHI, WARD NO.- 01 ( NEPAL TOLA ) PANCHAYAT- SAHIT, WARD NO.-02 ( RAJPUT TOLA ) PANCHAYAT- SAHIT, W-03( MUSAH is a water resources project in Samastipur district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹21.21 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEMES WIT"?
The current status of this project is "Ongoing". This is a water resources project in Samastipur district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Samastipur district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹21.21 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.