Bihar Infrastructure ProjectOngoing
Water Resources
Design, Construction, Supply, Testing, and Commissioning of Piped Water Supply Schemes (Ward level schemes) for habitations left out under "Har Ghar nal ka Jal" nischay yojna in panchayats where "Har Ghar nal ka jal" was executed by the Panchayati Raj Department with Electric Driven Pumps Block- Pachrukhi in the District of Siwan , Bihar on turn-key basis with 03 months Trial Run Period Under P.H. Division, Siwan during the year 2024-25.
Public Health Engineering Department
Tender Amount
₹4.38 Cr
Awarded Cost
₹3.50 Cr
Start Date
—
Completion
—
Project Details
DistrictSiwan
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorKAMALUDDIN KHAN
Financial & Timeline
Tender Amount₹4.38 Cr
Awarded Cost₹3.50 Cr
Start Date—
End Date—
Last Updated—
Executing Contractor
KAMALUDDIN KHAN
Project Overview
Design, Construction, Supply, Testing, and Commissioning of Piped Water Supply Schemes (Ward level schemes) for habitations left out under "Har Ghar nal ka Jal" nischay yojna in panchayats where "Har Ghar nal ka jal" was executed by the Panchayati Raj Department with Electric Driven Pumps Block- Pachrukhi in the District of Siwan , Bihar on turn-key basis with 03 months Trial Run Period Under P.H. Division, Siwan during the year 2024-25. is a water resources project in Siwan district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹3.50 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Design, Construction, Supply, Testing, and Commissioning of Piped Water Supply S"?
- The current status of this project is "Ongoing". This is a water resources project in Siwan district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Siwan district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹3.50 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.