Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations PRD Left Out Tola under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in District West Champaran, Bihar on turn-key basis with 03 months Trial Run Period (including Electricity Bill of the trail run period) under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Bettiah in Block Yogapatti

Public Health Engineering Department

Tender Amount

₹4.28 Cr

Awarded Cost

₹3.85 Cr

Start Date

Completion

Project Details

DistrictPashchim Champaran
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorM/s ARYABHAT TECNOTRADER PRIVATE LIMITED

Financial & Timeline

Tender Amount₹4.28 Cr
Awarded Cost₹3.85 Cr
Start Date
End Date
Last Updated

Executing Contractor

M/s ARYABHAT TECNOTRADER PRIVATE LIMITED

Project Overview

Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations PRD Left Out Tola under ''Har Ghar Nal Ka Jal'' nischay yojna in areas having no ground water quality issues; with Electric driven Pumps in District West Champaran, Bihar on turn-key basis with 03 months Trial Run Period (including Electricity Bill of the trail run period) under Mukhya Mantri Grameen Payjal Nishchay Yojna (Non Quality Affected). Under P. H. Dvision, Bettiah in Block Yogapatti is a water resources project in Pashchim Champaran district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹3.85 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Sc"?
The current status of this project is "Ongoing". This is a water resources project in Pashchim Champaran district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Pashchim Champaran district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹3.85 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.