Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected), in GP- BARDELA (5B, 9B, 11B, 15B), BISHANPUR (2C, 5B, 6B, 9B, 12), ITHARI (11B, 11C, 13B), KISHANPUR BALWA (3B, 6B, 7B), and KUWARI (2B, 6B, 17B, 18B) of Block- DHAMDAHA (Total- 19 Nos. Schemes) Under P.H. Division, Dhamdaha

Public Health Engineering Department

Tender Amount

₹8.19 Cr

Awarded Cost

₹6.22 Cr

Start Date

Completion

Project Details

DistrictPurnia
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorRAKESH KUMAR SINGH

Financial & Timeline

Tender Amount₹8.19 Cr
Awarded Cost₹6.22 Cr
Start Date
End Date
Last Updated

Executing Contractor

RAKESH KUMAR SINGH

Project Overview

Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected), in GP- BARDELA (5B, 9B, 11B, 15B), BISHANPUR (2C, 5B, 6B, 9B, 12), ITHARI (11B, 11C, 13B), KISHANPUR BALWA (3B, 6B, 7B), and KUWARI (2B, 6B, 17B, 18B) of Block- DHAMDAHA (Total- 19 Nos. Schemes) Under P.H. Division, Dhamdaha is a water resources project in Purnia district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹6.22 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Sc"?
The current status of this project is "Ongoing". This is a water resources project in Purnia district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Purnia district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹6.22 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.