Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Water Resources

Design, Construction of Water Supply Scheme with electric driven motor pump and Arsenic removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Arsenic Affected left out Habitations/wards (Quality affected) with Operation and Maintenance of 60 months after successful completion of minimum six months of Trial Run Period under Mukhya Mantri Gramin Peyjal Nischay Yojana on Turn Key basis under P.H. Division,Lakhisarai. Ward No.-1A,3A,3B,4C,5A,8A,9A,10C,12A,13A,14A panchayat-Mahisauna under Block-Lakhisarai (Total Wards-11 Nos.) GROUP NO- QL-V

Public Health Engineering Department

Tender Amount

₹4.07 Cr

Awarded Cost

₹3.59 Cr

Start Date

Completion

Project Details

DistrictLakhisarai
DepartmentPublic Health Engineering Department
CategoryWater Resources
StatusOngoing
ContractorRAJESH KUMAR

Financial & Timeline

Tender Amount₹4.07 Cr
Awarded Cost₹3.59 Cr
Start Date
End Date
Last Updated

Executing Contractor

RAJESH KUMAR

Project Overview

Design, Construction of Water Supply Scheme with electric driven motor pump and Arsenic removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Arsenic Affected left out Habitations/wards (Quality affected) with Operation and Maintenance of 60 months after successful completion of minimum six months of Trial Run Period under Mukhya Mantri Gramin Peyjal Nischay Yojana on Turn Key basis under P.H. Division,Lakhisarai. Ward No.-1A,3A,3B,4C,5A,8A,9A,10C,12A,13A,14A panchayat-Mahisauna under Block-Lakhisarai (Total Wards-11 Nos.) GROUP NO- QL-V is a water resources project in Lakhisarai district, Bihar, being implemented by Public Health Engineering Department. The project has an approved cost of ₹3.59 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "Design, Construction of Water Supply Scheme with electric driven motor pump and "?
The current status of this project is "Ongoing". This is a water resources project in Lakhisarai district, Bihar.
Which department is responsible for this project?
This project is being implemented by Public Health Engineering Department, Government of Bihar. It falls under the Water Resources category and is located in Lakhisarai district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹3.59 Cr. This is a water resources project funded by the Government of Bihar under Public Health Engineering Department.