Bihar Infrastructure ProjectOngoing
Urban Development
Design, Build, Construct, Install and commissioning of Material Recovery Facility (MRF) of 50 TPD for dry waste along with operation and maintenance of the plant for 5 years on EPC Mode
Urban Development and Housing Department
Tender Amount
₹9.21 Cr
Awarded Cost
₹9.13 Cr
Start Date
—
Completion
—
Project Details
DistrictNawada
DepartmentUrban Development and Housing Department
CategoryUrban Development
StatusOngoing
ContractorM/s HARSH ENGICON PRIVATE LIMITED
Financial & Timeline
Tender Amount₹9.21 Cr
Awarded Cost₹9.13 Cr
Start Date—
End Date—
Last Updated—
Executing Contractor
M/s HARSH ENGICON PRIVATE LIMITED
Project Overview
Design, Build, Construct, Install and commissioning of Material Recovery Facility (MRF) of 50 TPD for dry waste along with operation and maintenance of the plant for 5 years on EPC Mode is a urban development project in Nawada district, Bihar, being implemented by Urban Development and Housing Department. The project has an approved cost of ₹9.13 Cr. Current status is Ongoing.
Frequently Asked Questions
- What is the current status of "Design, Build, Construct, Install and commissioning of Material Recovery Facilit"?
- The current status of this project is "Ongoing". This is a urban development project in Nawada district, Bihar.
- Which department is responsible for this project?
- This project is being implemented by Urban Development and Housing Department, Government of Bihar. It falls under the Urban Development category and is located in Nawada district.
- What is the cost of this Bihar infrastructure project?
- The project cost is ₹9.13 Cr. This is a urban development project funded by the Government of Bihar under Urban Development and Housing Department.