Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Bihar Infrastructure ProjectOngoing
Infrastructure

5 year AMC along with switch board operation (365 days x 3 shift) for 33 KV/433 volt sub-station (2MVA compact transformer 5 Nos.) with D.G.Set (1010 KVA compact DG Set 5 Nos.) Main Cum auto synchronization panel & other allied electrical Equipment's (Busbar, AB Switch, VCB Capacitor bank battery, Main electric controlled panel along with interconnection, Earthing safety equipment's and cable etc. As per site requirement) at Bihar Vidhan Sabha, Patna.

Building Construction Department

Tender Amount

₹12.23 Cr

Awarded Cost

₹12.23 Cr

Start Date

Completion

Project Details

DistrictPatna
DepartmentBuilding Construction Department
CategoryInfrastructure
StatusOngoing
ContractorM.S. Heavy Voltage construction

Financial & Timeline

Tender Amount₹12.23 Cr
Awarded Cost₹12.23 Cr
Start Date
End Date
Last Updated

Executing Contractor

M.S. Heavy Voltage construction

Project Overview

5 year AMC along with switch board operation (365 days x 3 shift) for 33 KV/433 volt sub-station (2MVA compact transformer 5 Nos.) with D.G.Set (1010 KVA compact DG Set 5 Nos.) Main Cum auto synchronization panel & other allied electrical Equipment's (Busbar, AB Switch, VCB Capacitor bank battery, Main electric controlled panel along with interconnection, Earthing safety equipment's and cable etc. As per site requirement) at Bihar Vidhan Sabha, Patna. is a infrastructure project in Patna district, Bihar, being implemented by Building Construction Department. The project has an approved cost of ₹12.23 Cr. Current status is Ongoing.

Frequently Asked Questions

What is the current status of "5 year AMC along with switch board operation (365 days x 3 shift) for 33 KV/433 "?
The current status of this project is "Ongoing". This is a infrastructure project in Patna district, Bihar.
Which department is responsible for this project?
This project is being implemented by Building Construction Department, Government of Bihar. It falls under the Infrastructure category and is located in Patna district.
What is the cost of this Bihar infrastructure project?
The project cost is ₹12.23 Cr. This is a infrastructure project funded by the Government of Bihar under Building Construction Department.