122Item Rate 9016 Drone Frames

Routine Maintenance and Incident Management of Two laning of Muzaffarpur-Barauni Section of NH-122 (Old NH-28) from 519.600 to 627.163 in the state of Bihar.

UPC: N/06011/01003/BR

Physical Progress

0.0%

Drone-monitored

Financial Progress

0.0%

Of awarded cost

Awarded Cost

₹6 Cr

Contract value

Length

107.563 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

9016

Aerial captures

Project Progress

Physical Progress0.0%
Financial Progress0.0%

Stage

Under O&M through OMT/TOT/O&M Agency at Site

Due Date

21-05-2026

Likely Date

-

Completion

0.0%

Physical Done

DoneRemaining

Project Timeline

Awarded

22-05-2025

Construction Started

22-05-2025

In Progress

Near Completion

-

Completed

-

Physical vs Financial Progress

Project Details

UPC

N/06011/01003/BR

National Highway

122

Regional Office

RO-Patna

State

Bihar

Mode

Item Rate

Length

107.563 km

Contractor

Rehabilitation Engineering (prop. Hemangini Bharatchandra Shewale)

Project Stage

Under O&M through OMT/TOT/O&M Agency at Site

Drone Frames

9016 frames

Last Flight

2026-04-26

Cost & Timeline

Awarded Cost

₹5.81 Cr

Capital Cost

N/A

Start Date

22-05-2025

PCOD Date

-

Scheduled Completion

21-05-2026

Likely Completion

-

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-08-03 14:13:18

Contractor Profile

Rehabilitation Engineering (prop. Hemangini Bharatchandra Shewale)

RO-Patna122Item Rate

Project Intelligence

1

Physical progress stands at 0.0%. Financial utilization at 0.0%.

2

Project is on schedule or ahead of planned completion date.

3

Covers 107.563 km on 122, improving regional connectivity.

4

9016 drone frames uploaded — real-time aerial monitoring is active for this project.

Routine Maintenance and Incident Management of Two laning of Muzaffarpur-Barauni Section of NH-122 (Old NH-28) from 519.600 to 627.163 in the state of Bihar. is a National Highways Authority of India (NHAI) project on 122 in Bihar. The project has an awarded cost of ₹5.81 Cr and is currently ongoing with physical progress at 0.0%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

Drone Imagery Available

9,016 frames · NHAI surveillance footage · UPC N/06011/01003/BR

View Drone Images
?

Frequently Asked Questions

QWhat is the current status of the NHAI project "Routine Maintenance and Incident Management of Two laning of Muzaffarpur-Barauni"?
Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under O&M through OMT/TOT/O&M Agency at Site. On schedule. Scheduled completion: 21-05-2026. Likely completion: -.
QWho is the contractor for this NHAI highway project?
The contractor for Routine Maintenance and Incident Management of Two laning of Muzaffarpur-Barauni Section of NH-122 (Old NH-28) from 519.600 to 627.163 in the state of Bihar. is Rehabilitation Engineering (prop. Hemangini Bharatchandra Shewale). The project is under RO-Patna and covers 107.563 km on 122.
QWhat is the cost of this NHAI highway project?
The awarded cost is ₹5.81 Crore. The project is on 122 in Bihar, monitored via drone surveillance by NHAI.
QWhat is UPC N/06011/01003/BR in NHAI?
UPC (Unique Project Code) N/06011/01003/BR refers to "Routine Maintenance and Incident Management of Two laning of Muzaffarpur-Barauni Section of NH-122 (Old NH-28) from 519.600 to 627.163 in the state of Bihar. " — a National Highway project on 122 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.