Strengthening and Major maintenance work of stretch of Two Laning with paved shoulder of Chhapra - Gopalganj section of NH-85 from Km 0+000 to Km 93+500 (Existing Chainage) and Km. 0+000 to Km. 94+258 (Design Chainage), (Total Design length: 94.258 Kms.) in the State of Bihar on PBMC Mode
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
N/A
Contract value
Length
94.258 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
5450
Aerial captures
Project Progress
Stage
Under O&M through OMT/TOT/O&M Agency at Site
Due Date
22-07-2030
Likely Date
-
Completion
0.0%
Physical Done
Project Timeline
Awarded
29-04-2025
Construction Started
29-04-2025
In Progress
Near Completion
-
Completed
-
Physical vs Financial Progress
Project Details
UPC
N/08055/01003/BR
National Highway
NH-531
Regional Office
RO-Patna
State
Bihar
Mode
PBMC
Length
94.258 km
Contractor
INCKAH Infrastructure Technologies Pvt. Ltd.
Project Stage
Under O&M through OMT/TOT/O&M Agency at Site
Drone Frames
5450 frames
Last Flight
2026-01-27
Cost & Timeline
Awarded Cost
N/A
Capital Cost
N/A
Start Date
29-04-2025
PCOD Date
-
Scheduled Completion
22-07-2030
Likely Completion
-
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-06-16 13:14:27
Contractor Profile
INCKAH Infrastructure Technologies Pvt. Ltd.
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 94.258 km on NH-531, improving regional connectivity.
5450 drone frames uploaded — real-time aerial monitoring is active for this project.
Strengthening and Major maintenance work of stretch of Two Laning with paved shoulder of Chhapra - Gopalganj section of NH-85 from Km 0+000 to Km 93+500 (Existing Chainage) and Km. 0+000 to Km. 94+258 (Design Chainage), (Total Design length: 94.258 Kms.) in the State of Bihar on PBMC Mode is a National Highways Authority of India (NHAI) project on NH-531 in Bihar. is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Drone Imagery Available
5,450 frames · NHAI surveillance footage · UPC N/08055/01003/BR
Frequently Asked Questions
- What is the current status of the NHAI project "Strengthening and Major maintenance work of stretch of Two Laning with paved sho"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under O&M through OMT/TOT/O&M Agency at Site. On schedule. Scheduled completion: 22-07-2030. Likely completion: -.
- Who is the contractor for this NHAI highway project?
- The contractor for Strengthening and Major maintenance work of stretch of Two Laning with paved shoulder of Chhapra - Gopalganj section of NH-85 from Km 0+000 to Km 93+500 (Existing Chainage) and Km. 0+000 to Km. 94+258 (Design Chainage), (Total Design length: 94.258 Kms.) in the State of Bihar on PBMC Mode is INCKAH Infrastructure Technologies Pvt. Ltd.. The project is under RO-Patna and covers 94.258 km on NH-531.
- What is the cost of this NHAI highway project?
- Project cost details are not available in our current drone-monitored data for this stretch.
- What is UPC N/08055/01003/BR in NHAI?
- UPC (Unique Project Code) N/08055/01003/BR refers to "Strengthening and Major maintenance work of stretch of Two Laning with paved shoulder of Chhapra - Gopalganj section of NH-85 from Km 0+000 to Km 93+500 (Existing Chainage) and Km. 0+000 to Km. 94+258 (Design Chainage), (Total Design length: 94.258 Kms.) in the State of Bihar on PBMC Mode" — a National Highway project on NH-531 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.