Gaawar Construction Emerges Lowest Bidder for 13.175 km Darbhanga Elevated Corridor Project

Darbhanga Elevated Corridor Project
Facebook
Twitter
WhatsApp
Reddit

Gaawar Construction Limited has emerged as the lowest bidder for the construction of a 13.175 km elevated corridor in Darbhanga district, Bihar. The project involves the improvement and up-gradation of a two to four lane elevated corridor from Darbhanga Railway Station to the Amas–Darbhanga Expressway via Donar Chowk and Karpuri Chowk, as well as from Karpuri Chowk to Ekmi Chowk through Laheria Sarai Chowk and Lohiya Chowk.

The project is being undertaken by the Bihar State Road Development Corporation Limited (BSRDCL) on an EPC mode with an estimated cost of Rs 1,214.90 crore. The bids were invited in May 2025, with the due date set for July 21 and the financial bids opened on August 27.

Gaawar Construction Limited quoted Rs 971.92 crore, which is 20 percent below the estimated cost, securing the L1 position. Ashoka Buildcon Limited stood second with a bid of Rs 1,076 crore, 11.43 percent below the estimate. Afcons Infrastructure Limited quoted Rs 1,297.80 crore, 6.82 percent above the estimate, while Navayuga Engineering Co. Ltd submitted a bid of Rs 1,323 crore, 8.90 percent above the estimate. Ceigall India Limited was declared non-responsive in the evaluation process.

Once awarded, this project is expected to significantly ease traffic congestion in Darbhanga town by providing faster connectivity between key junctions and the Amas–Darbhanga Expressway. It is also anticipated to boost regional mobility and strengthen infrastructure in north Bihar.

Leave a Comment

Top Stories

3 Bidders Qualify Technically for IMC Gaya Infrastructure Project

The tender process for infrastructure works for the Integrated Manufacturing Cluster at Gaya, Bihar, under the Amritsar–Kolkata Industrial Corridor Project has been taken up at the technical evaluation stage, and three bidders have been cleared for opening of financial bids. The project is proposed to be executed on an EPC basis and involves development of

Read More »

DMRC floats ₹54 crore tender for Patna Metro Phase-I station works

The Delhi Metro Rail Corporation (DMRC) has invited online e-tenders for a major construction package under the Patna Metro Rail Project Phase-1. The tender relates to Contract PC-04A and includes the design, fabrication, supply and erection of Pre-Engineered Building (PEB) structures at seven elevated metro stations: Danapur, Saguna Mor, RPS Mor, Patliputra, Mithapur, Ramkrishna Nagar

Read More »

BiharOne Platform: How Bihar’s Unified Digital Portal Will Transform Citizen Services

The Government of Bihar has initiated the BiharOne project, a landmark digital governance reform aimed at transforming the way public services and welfare schemes are delivered across the state. BiharOne is envisioned as a unified service delivery platform integrated with the Bihar Common Social Registry (BCSR), creating a single, citizen-centric digital ecosystem for governance. The

Read More »