Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
VK
Government ContractorVerified Bidding RecordPublic Works

Vijay Kumar Contractor

Aggregated public procurement dossier compiling official financial evaluations, competitive bidding ranks (L1, L2, L3), and tender awards.

Historical Win Rate16 Wins
34%award ratio

16 awarded across 47 participated tenders

Primary Issuing Authorities:bhakra beas management boardministry of road transport and highwaysnational highways authority of india
Official Central e-Procurement Evaluation Data

Total Tenders Bidded

47

Evaluated bids submitted

Official L1 Wins

16

Lowest responsive bidder

Won Contracts Value

₹428.82 Cr

Cumulative awarded volume

Total Quoted Pipeline

₹653.46 Cr

Aggregated financial quotes

Competitive Position & Rank Distribution

Historical rank distribution across technical evaluations and financial openings

Average Margin vs Estimate: -16.5%
Bidding Outcome Proportion47 Total Evaluated Bids
L134.0%

16

Winning Bid

L24.3%

2

Runner Up

L36.4%

3

3rd Lowest

L4+4.3%

2

Higher Ranks

DQ14.9%

7

Disqualified

Profile Summary & Procurement Overview

Vijay Kumar Contractor is an active participant in public government e-procurement tenders. Across documented records, the contractor has placed financial quotes for 47 distinct tenders, achieving the lowest conforming bid position (L1) on 16 tenders with a historical win rate of 34%.

The contractor has executed or been awarded project works amounting to ₹428.82 Cr. In competitive bidding assessments, the firm has also finished as the secondary bidder (L2) in 2 tenders. Primary issuing authorities include bhakra beas management board, ministry of road transport and highways, national highways authority of india.

Tender Bidding Archive & Historical Records

Evaluation records and financial bids submitted by Vijay Kumar Contractor

RankTender & AuthorityQuoted BidEstimated CostMarginOutcomeLink
L3Complete renovation, landscaping and upgrading of plant nursery facilities to enhance cultivation and operation efficiency at BBMB Colony, Sundernagar.
bhakra beas management boardSundernagar09-Jan-2026
₹42.05 L₹25.40 L+65.54%
Awarded: Dropati Devi
View
L3Creation of Green and Clean belt in office premises of BSL (P) BBMB Sundernagar under swachhata Action Plan 2025-26
bhakra beas management boardSundernagar19-Feb-2026
₹1.68 L₹1.44 L+16.71%
Awarded: RAVI KANT
View
Improvement Aesthetic of the park area and suitable arrangement for recreational activities in CISF complex BBMB Sundernagar
bhakra beas management boardSundernagar03-Jul-2026
₹7.11 LNot Admitted-Fee/PreQual/TechnicalView
DQProviding and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode
ministry of road transport and highwaysNH-334A07-Mar-2023
₹4.74 CrRejected-TechnicalView
L6Four Laning with paved shoulders from Km 29 00 to Km 36 25 Section of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu Road NH 703A 7 25 Kms under NH Division Jalandhar on EPC Mode in the State of Punjab for the year 2022 23
ministry of road transport and highwaysJalandhar22-Mar-2023
₹29.91 Cr₹48.27 Cr-38.03%Admitted-FinanceView
L1Balance work of Construction of 2 Lane ROB and its approaches in lieu of existing level crossing (LC No. C-61) at Km 165.550 on NH-89 on EPC Mode in the State of Rajasthan
ministry of road transport and highwaysNAGAUR17-Apr-2023
₹9.51 Cr₹9.38 Cr+1.39%Awarded (L1)View
L1Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode
ministry of road transport and highwaysBiaora Bypass01-May-2023
₹64.41 Cr₹81.76 Cr-21.22%Awarded (L1)View
UPGRADATION OF GORAS TO SHYAMPUR ROAD SECTION OF NH-552 EXT., FROM DESIGN CHAINGE 48.400 TO 111.800 KM TOTAL LENGTH 63.40 KM TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ALONG WITH ONE TIME IMPROVEMENT OF 8.91 KM IN THE STATE OF MP ON EPC MODE
ministry of road transport and highwaysGORAS TO SHYAMPUR ROAD SECTION OF NH-552 EXT04-May-2023
₹308.95 CrAccepted-TechnicalView
L3CONSTRUCTION OF LVUP AND VUP AT KM 64/355, 81/400 AND 103/320 ON NH 58 (BEAWAR - GOMTI SECTION CH. 58/245 TO 108/600 IN THE STATE OF RAJASTHAN ON EPC MODE IN ROAD SAFETY ANNUAL PLAN 2022-23
ministry of road transport and highwaysUnder Jurisdiction of PWD NH Dn. Ajmer15-May-2023
₹60.41 Cr₹72.01 Cr-16.11%Rejected-FinanceView
L8Rehabilitation and Upgradation of Single / Intermediate Lane to 2 Lane from Existing Chainage (Km 64.525 to Km 74.700) Design Chainage (Km 43.400 to Km 53.365) on NH -123 (New NH no. 507) under EPC mode in the state Uttarakhand
ministry of road transport and highwaysNH-507(123)22-Dec-2023
₹60.00 Cr₹70.23 Cr-14.57%Admitted-FinanceView
Operation and Maintenance of Nagaur Jodhpur Section NH 62 from Km 267.500 (Netra Village) to Km 296.070 (Mandor) (Approx length 28.57 Km) in the state of Rajasthan on PBMC Mode
ministry of road transport and highwaysNagaur26-Jan-2024
₹39.87 CrAccepted-TechnicalView
DQMaintenance works and activities PBMC on section from Km 58 400 to 100 Gagret to Chouli on NH 70 New NH 03 in the State of Himachal Pradesh
ministry of road transport and highwaysHamirpur23-Feb-2024
₹33.18 CrRejected-TechnicalView
Maintenance works and activities PBMC on NH-503 Extn Km 0 to 19 and 28 to 44 700 Amb to Dhusara and Four Lane Portion From Jhalera to Mehatpur in the State of Himachal Pradesh
ministry of road transport and highwaysHamirpur27-Feb-2024
₹45.54 CrAdmitted-Fee/PreQual/TechnicalView
Construction of 4 Lane bypass to Ras town on NH 158 in the state of Rajasthan on EPC mode
ministry of road transport and highwaysPIU Beawar09-Mar-2024
₹61.99 CrNot Admitted-Fee/PreQual/TechnicalView
L1Construction of 2 Lane with paved shoulder configuration of bypass with provision of new ROB to Mandal town District Bhilwara with connecting NH 158 to NH 48 in the state of Rajasthan on EPC mode
ministry of road transport and highwaysPIU BEAWAR09-Mar-2024
₹52.91 Cr₹49.96 Cr+5.9%Awarded (L1)View
L1Construction of RE Wall in the approaches of LVUPs from Km 171.706 to Km 172.097 of NH62 in Suratgarh town on EPC mode under Annual Plan 2023 24 in the state of Rajasthan
ministry of road transport and highwayssuratgarh16-Mar-2024
₹5.81 Cr₹8.27 Cr-29.75%Awarded (L1)View
L2Maintenance works and activities PBMC on NH 503 Extn Km 0 to 19 and 28 to 44 700 Amb to Dhusara and Four Lane Portion From Jhalera to Mehatpur in the State of Himachal Pradesh
ministry of road transport and highwaysHamirpur29-Apr-2024
₹30.55 Cr₹45.54 Cr-32.91%Rejected-FinanceView
L2Maintenance works and activities PBMC on NH 20A New NH 303 Nagrota Bagwan Ranital road km 0 to 5 and NH 20A New NH 503 Ranital to Mubarikpur in Km 39 to91 in the State of Himachal Pradesh
ministry of road transport and highwaysHamirpur29-Apr-2024
₹28.48 Cr₹43.10 Cr-33.91%Rejected-FinanceView
DQCONSTRUCTION OF GRADE SEPARATED STRUCTURE VUP ON AJMER NAGAUR SECTION OF NH 89 (NEW NH-58) AT KM 3/630 (KAYAD), KM 6/020 (SIKAR JUNCTION) AND AT KM 18/500 (DEV NAGAR) IN THE STATE OF RAJASTHAN
ministry of road transport and highwaysUnder Jurisdiction of PWD NH Dn. Ajmer15-Oct-2024
₹91.54 CrRejected-TechnicalView
DQStrengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.
national highways authority of indiaSonipat24-Jun-2021
Awarded: SHIVALAYA CONSTRUCTION CO PVT LTD
View
L12/4 Laning of Bhiwani-Hansi-Barwala Section of NH-148B in the State of Haryana - Repair and Maintenance of highway from km 129.770 to km 163.000.
national highways authority of indiaBhiwani09-Jul-2021
₹5.81 CrAwarded (L1)View
L1Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode
national highways authority of indiaAmbala27-Apr-2022
₹18.89 Cr₹25.91 Cr-27.09%Awarded (L1)View
L1Construction of flyover at km 233.110 on Dogal Kalan to Punjab-Haryana Border Section on NH-71 (new NH-52) in the State of Punjab on EPC Mode
national highways authority of indiaPATIALA08-Jun-2022
₹16.91 Cr₹19.70 Cr-14.16%Awarded (L1)View
L1Construction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.
national highways authority of indiaNHAI PIU-Shimla01-Aug-2022
₹27.91 Cr₹37.34 Cr-25.25%Awarded (L1)View
L1Construction of Underpass at Sohal Town on Pathankot-Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode
national highways authority of indiaAmritsar11-May-2023
₹19.91 Cr₹28.86 Cr-31.01%Awarded (L1)View
L1Overlay work on 4-lane Rajpura to Patiala from Chainage Km.28.110 to Km.50.00 and Existing Patiala Bypass Section of NH-64 (New NH-07) from Chainage Km 50.00 to Km 69.280 in the State of Punjab
national highways authority of indiaChandigarh27-Jun-2023
₹15.58 Cr₹20.75 Cr-24.91%Awarded (L1)View
L1Construction of Service road (length 1786 M.) BHS on Kaithal-Rajasthan Border for village Bir Babran from Km.97.900 to Km.98.800 of NH-65 (New NH-52/152) in the State of Haryana
national highways authority of indiaPIU Hisar13-Sep-2023
₹3.74 Cr₹5.75 Cr-35%Awarded (L1)View
Construction of Vehicular Underpass at km 229.500 including Widening of New Service road, Exit-Entry, Dismantling, Reconstruction of Drain and Relocating of Highway Lighting on Panipat-Jalandhar section of old NH-1 (new NH 44) in the State of Punjab
national highways authority of indiaPIU Ambala11-Oct-2023
₹24.95 CrAdmitted-FinanceView
DQOperation and Maintenance of Shimla-Mataur Section of NH-205 from Ch. 0.000 to 65.000 and descoped section of Solan-Kaithilighat (NH-05) from km 127.450 to km 128.830 in the state of Himachal Pradesh. (2nd Call)
national highways authority of indiaRO NHAI Shimla13-Mar-2024
₹19.97 CrRejected-TechnicalView
6 Laning of de scoped work of Chittorgarh Udaipur section of NH 27 from km. 269.650 to km. 270.900 near Village Vana, in the state of Rajasthan on EPC mode
national highways authority of indiaNational Highways Authority of India14-Mar-2024
₹26.28 CrAccepted-TechnicalView
Construction of Interchange Loop with underpass at Beas on Amritsar- Jalandhar section of NH-03 in the State of Punjab on EPC Mode
national highways authority of indiaPIU Amritsar14-Mar-2024
₹21.04 CrAdmitted-FinanceView
DQWidening and Reconstruction of existing Two Lane Carriageway to Four Lane with Paved Shoulder in Makhu Town from km. 170.000 to km. 171.900 including ROB at km. 171.387 of NH-54 in the State of Punjab on EPC mode.
national highways authority of indiaPIU Bathinda11-Jul-2024
₹46.29 Cr
Awarded: Suraj Construction Company
View
L1Balance works of 4 Sinnar to Shirdi section of NH 160 from design Ch 0 000 to 50 943 in the state of Maharashtra on EPC Mode
national highways authority of indiaNashik01-Aug-2024
₹67.91 CrAwarded (L1)View
L1Design and Construction of Vehicular Underpass VUP at Khadakjamb at Ch 373 430 and Light Vehicular Underpass LVUP at Ch 373 650 for Rectification of MoRTH identified Blackspot MH 04 195 on Dhule Pimpalgaon Section of NH 3 in the State of Maharasht
national highways authority of indiaNashik14-Aug-2024
₹35.33 CrAwarded (L1)View
L1Construction of Service Road at Laling Mungase Vadalibhoi Raigad Nagar and Road Safety Works in Rahud Ghat on Dhule Pimpalgaon Section of NH 3 in the State of Maharashtra on EPC Mode
national highways authority of indiaNashik20-Aug-2024
₹44.42 CrAwarded (L1)View
Rectification of 05 nos. Blackspots on Swaroopganj Pindwara section (Km. 264.000 to Km. 248.700 of NH 14 and Pindwara Udaipur section (Km. 0.000 to Km. 104.724 of NH 76) New NH 27 in the State of Rajasthan on EPC Mode
national highways authority of indiaNHAI RO JAIPUR16-Sep-2024
₹75.76 CrAccepted-TechnicalView
Rectification of 06 nos. Blackspots on Pindwara Udaipur section (Km. 0.000 to Km. 104.724 of NH 76) New NH 27 in the State of Rajasthan on Engineering, Procurement and Construction (EPC) Mode
national highways authority of indiaNHAI RO JAIPUR24-Sep-2024
₹99.50 CrAccepted-TechnicalView
Construction of LVUP/VUP at Km. 332.900 Jhirniya at Km 357.420 Hingoni at Km 378.490 Badodia Talab at Km 395.600 Gadiya and at Km. 390.950 Narsinghgarh Junction on Lalghati 315.725 to Biaora 421.325 section of New NH46 in the state of MP on EPC mode
national highways authority of indiaNHAI RO Bhopal12-Nov-2024
₹92.08 CrAdmitted-FinanceView
Construction of SVUP, LVUP, VUP at Km 109.420 Bhaghel Dhaba at Km 111.360 Police Station Ruthiyai bypass at Km 116.140 NFL at Km 118.400 Sada Colony and at Km 137.020 Barkheda Khurd alongwith Junction Improvement at K. 119.140 Bharsula junction/JP
national highways authority of indiaNHAI RO Bhopal12-Nov-2024
₹98.42 CrAdmitted-FinanceView
Construction of LVUP/VUP at Km 149.870 Jaisinghpura at Km 155.030 Binaganj Bypass at Km 183.780 Aranya Jod at Km 188.870 Reliance Petrol Pump on Guna Biaora section of NH46 in the state of MP on EPC mode
national highways authority of indiaNHAI RO Bhopal12-Nov-2024
₹99.97 CrAdmitted-FinanceView
L1Construction of 6 Lane LVUP for rectification of Black Spot (MORTH ID HR-(02)-022) at km. 422.114 of NH-352 (old NH-71) (Palhawas Chowk) on Rohtak-Bawal section on EPC basis in the State of Haryana
national highways authority of indiaPIU Sonepat14-Nov-2024
₹14.91 Cr₹24.43 Cr-38.97%Awarded (L1)View
Construction of VUPs at km 177.900 at Palasner ID-MH-04-110 and at km 237.200 at Waghadi ID-MH-04-99 and other remedial measures for rectification of 2 Nos. of MoRTH identified Blackspots ID-MH-04-111 and MH-04-108 and 7 Accident spots ID.
national highways authority of indiaNHAI RO NAGPUR22-Jan-2025
₹100.87 CrAccepted-TechnicalView
Rectification of Blackspot by Construction of Vehicular Underpass (VUP) with Service Road at Janapur Chauraha at Km 243.330 on Beawar Pali
national highways authority of indiaNHAI RO JAIPUR18-Feb-2025
₹18.45 CrAccepted-TechnicalView
DQConstruction of i.3-lane VUP Uni Directional at km 172.000 at Start of Beed Bypass ii. 3-lane VUP Uni Directional at km 184.280 at the End of Beed Bypass and iii.Construction of Service Roads from Km 173.060 to 173.760, Km175.840 to Km 176.480,Km 179
national highways authority of indiaNHAI RO NAGPUR25-Feb-2025
₹148.49 CrRejected-TechnicalView
Construction of Uni-directional Grade separated Structure with Slip Service Roads (Km. 247 00 to km 248 679)(Jhiri Chowk on start of Bajaura Bypass) on existing 4 lane of Takoli-Kullu Section of NH-3 in the State of Himachal Pradesh on EPC Mode
national highways authority of indiaMandi16-Apr-2025
₹52.43 CrAccepted-TechnicalView
Short Term Maintenance of four laning of Parwanoo Solan section of NH 22 Now NH 05 from km 67000 to km 106139 under NHDP phase III in the state of Himachal Pradesh on item rate percentage basis
national highways authority of indiaShimla09-May-2025
₹2.99 CrAccepted-TechnicalView
L1Design and Construction of Flyover at Sijwaha Tiraha at Ch 1377.750 on Shivpuri Jhansi section of NH27 for permanent rectification of MoRTH identified Blackspot location in the State of Uttar Pradesh on EPC Mode
national highways authority of indiaRO Bhopal06-Jun-2025
₹39.72 Cr₹49.79 Cr-20.22%Awarded (L1)View

Frequently Asked Questions

How many government tenders has Vijay Kumar Contractor participated in?

According to public e-procurement data records, Vijay Kumar Contractor has participated in 47 government infrastructure and procurement tenders across central and state authorities.

How many tenders has Vijay Kumar Contractor won as lowest bidder (L1)?

Vijay Kumar Contractor has secured 16 tenders as the official lowest bidder (L1) or awardee, achieving an overall win rate of 34%.

What is the total value of government contracts awarded to Vijay Kumar Contractor?

The cumulative value of project contracts awarded to Vijay Kumar Contractor is approximately ₹428.82 Cr, across agencies such as bhakra beas management board, ministry of road transport and highways, national highways authority of india.