Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
SI
Government ContractorVerified Bidding RecordPublic Works

Silica Infra Private Limited

Aggregated public procurement dossier compiling official financial evaluations, competitive bidding ranks (L1, L2, L3), and tender awards.

Historical Win Rate3 Wins
7.3%award ratio

3 awarded across 41 participated tenders

Primary Issuing Authorities:national highways authority of indiaministry of road transport and highwayswapcos limitedircon international limitedairports authority of india
Official Central e-Procurement Evaluation Data

Total Tenders Bidded

41

Evaluated bids submitted

Official L1 Wins

3

Lowest responsive bidder

Won Contracts Value

₹252.99 Cr

Cumulative awarded volume

Total Quoted Pipeline

₹1258.91 Cr

Aggregated financial quotes

Competitive Position & Rank Distribution

Historical rank distribution across technical evaluations and financial openings

Average Margin vs Estimate: -30.7%
Bidding Outcome Proportion41 Total Evaluated Bids
L17.3%

3

Winning Bid

L22.4%

1

Runner Up

L32.4%

1

3rd Lowest

L4+12.2%

5

Higher Ranks

DQ29.3%

12

Disqualified

Profile Summary & Procurement Overview

Silica Infra Private Limited is an active participant in public government e-procurement tenders. Across documented records, the contractor has placed financial quotes for 41 distinct tenders, achieving the lowest conforming bid position (L1) on 3 tenders with a historical win rate of 7.3%.

The contractor has executed or been awarded project works amounting to ₹252.99 Cr. In competitive bidding assessments, the firm has also finished as the secondary bidder (L2) in 1 tenders. Primary issuing authorities include national highways authority of india, ministry of road transport and highways, wapcos limited, ircon international limited.

Tender Bidding Archive & Historical Records

Evaluation records and financial bids submitted by Silica Infra Private Limited

RankTender & AuthorityQuoted BidEstimated CostMarginOutcomeLink
DQRoad Safety Improvement of existing four lane section of Muzaffarnagar-Haridwar Section of NH-334 on EPC Mode in the state of Uttar Pradesh and Uttarakhand under NH(O)
national highways authority of indiaNHAI HQ16-Aug-2024
₹148.77 Cr₹381.95 Cr-61.05%
Awarded: SRSC Infra Private Limited
View
L1Rectification of Blackspots by Construction of Flyover VUP at Chidiya Bawdi, Tabiji, Kharwa, Piplaz Junction on Kishangarh Ajmer Beawar section of NH 448 and 58 and at Srinagar Village, Dilwari Village on Kishangarh Gulabpura Section of NH 48
national highways authority of indiaNHAI RO JAIPUR02-Dec-2024
₹138.00 Cr₹169.04 Cr-18.36%Awarded (L1)View
Construction of 04 no. of Additional Structures on six lane Gurgaon-Jaipur section of NH-48 between km 42.700 to km 107.100 in the State of Haryana on EPC Mode
national highways authority of indiaNHAI HQ30-Dec-2024
₹108.96 CrAdmitted-FinanceView
Const of EC for Gammon Junc at Km. 903.265 Blackspot ID No. AP 05 092 and Diwancheruvu junc at Km. 902.308 Blackspot ID No. AP 03 299 on NH16 in Andhra Pradesh under NH(O) on EPC mode
national highways authority of indiaNHAI HQ03-Jan-2025
₹263.30 CrAdmitted-FinanceView
L2Upgrad to 2 Lane with paved shoulder 4lane of SHirwal to Lonand sec from Km 159.900 to Km. 186.828 of NH965DD and 2lane with paved sholders of Lonand to Satara Sec from Km 184.994 to Km 2287.131 of NH965D in Maharashtra on EPC mode.
national highways authority of indiaNHAI HQ04-Jan-2025
₹341.25 Cr₹437.00 Cr-21.91%
Awarded: THAKUR INFRAPROJECTS PVT LTD
View
L3Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B in Gadchandur Town in the State of Maharashtra on EPC Mode
national highways authority of indiaNHAI HQ04-Jan-2025
₹87.00 Cr₹145.53 Cr-40.22%
Awarded: vindhya construction company
View
Design and Construction of VUP and Service roads on Indore Gujarat section of NH 47 under Road safety improvement in the State of Madhya Pradesh on Engineering, Procurement and Construction EPC Contract
national highways authority of indiaRO Bhopal03-Feb-2025
₹168.58 CrAdmitted-FinanceView
Construction of four lane Arrah bypass (Asni to Baonpali) from Km 0.000 (Design Chainage) to Km 4.500 (Design Chainage) of NH319 (Old NH30) in the State of Bihar on EPC Mode
national highways authority of indiaNHAI HQ03-Feb-2025
₹95.02 CrAdmitted-FinanceView
Const. of Service Road including Grade Sep. str. at specified junctions for improvement of corridor eff. of Domel Udhampur sec. of NH44 from Ch 220.500 to 182.200, length 14.370 Km on LHS and length 10.890 Km on RHS in the UT of JK on EPC Mode.
national highways authority of indiaDomel Udhampur04-Feb-2025
₹275.00 CrAccepted-TechnicalView
Rectification of 7 nos. of Blackspots by Construction of Service Road at Kanchi Ghati,Flyover at Badanyagav, Service Road at Silor puliya tiraha, Flyover at Ramganj balaji, Flyover at Barundhan Tiraha, Flyover at Aktasa Bypass on Deoli Kota section
national highways authority of indiaNHAI RO JAIPUR02-Apr-2025
₹149.39 CrAccepted-TechnicalView
DQRectification of 08 nos. MoRTH identified Blackspots on Chittorgarh Kota section of NH 27 in the state of Rajasthan on Engineering, Procurement and Construction (EPC) Mode
national highways authority of indiaNHAI RO JAIPUR03-Apr-2025
₹113.24 CrRejected-TechnicalView
L1Design and Construction of Flyover at Sijwaha Tiraha at Ch 1377.750 on Shivpuri Jhansi section of NH27 for permanent rectification of MoRTH identified Blackspot location in the State of Uttar Pradesh on EPC Mode
national highways authority of indiaRO Bhopal06-Jun-2025
₹38.45 Cr₹49.79 Cr-22.77%Awarded (L1)View
DQO and M and other Road Safety Works on Muzaffarnagar Haridwar Sec of NH334 from Km 130.500 to Km 206.220 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
national highways authority of indiaNHAI HQ09-Jun-2025
₹191.97 Cr
Awarded: Suraj Construction Company
View
RECTIFICATION OF 03 NO. OF BLACKSPOTS ON JAIPUR-REENGUS-SIKAR SECTION OF NH-52 IN THE STATE OF RAJASTHAN on EPC Mode
national highways authority of indiaNHAI RO JAIPUR20-Jun-2025
₹100.41 CrAdmitted-FinanceView
DQOperation Routine Maintenance Repair and Periodic renewal work of two lane with paved shoulder of Raisinghnagar Poogal section (101.000 to Design Ch. 263.460) (L162.46 Km) in Rajasthan (PKG2) on Performance Based Maintenance Contracts (PBMC) mode
national highways authority of indiaNHAI HQ04-Jul-2025
₹147.05 CrRejected-TechnicalView
L1Construction Longterm Rectification of 03 Nos of Blackspots Gram Madai Village Gorakhpur Chauraha and Nagjhar Bypass Tiraha by Constructing 6 Lane Vehicular Underpasses at Km 550.650 Km 580.560 and Km 597.090 in Lakhnadon to Khawasa Section of NH 44
national highways authority of indiaNHAI RO Bhopal19-Sep-2025
₹76.54 Cr₹109.73 Cr-30.25%Awarded (L1)View
DQConstruction of 6 lane VUPs at Km. 96.570 (Madina Bypass) and Km. 106.445 (Behlba) with slip roads on both sides on Rohtak - Hisar Section of NH-9 in the State of Haryana on EPC Mode
national highways authority of indiaPIU Hisar22-Sep-2025
₹28.36 Cr₹36.18 Cr-21.61%
Awarded: Varun Chandra Development and Construction LLP
View
Pavement Quality Concrete at Kishnagarh Area from Chainage 4.000 To 5.700 RHS and 4.688 to 5.700 LHS along with the Harmada and Makrana Junction on Kishnagarh Ajmer Beawar Section of NH 448 and 58 in the state of Rajasthan-2nd Call
national highways authority of indiaNHAI RO JAIPUR01-Nov-2025
₹4.87 CrAccepted-TechnicalView
Request for Pre-Qualification (RFQ) 2026 for the maintenance works to be taken up on Risk and Cost of the Concessionaire-Contractor under jurisdiction of RO-Delhi
national highways authority of indiaNHAI HQ13-May-2026
Admitted-TechnicalView
DQRehabilitation and Up-gradation from Design Ch km 35.300 to km 65.740 (Length-30.440Km) of NH-166G (Gaganbawada to Kale) to 2LPS in the state of Maharashtra on EPC mode.
ministry of road transport and highwaysGaganbawada03-Feb-2025
₹351.40 CrRejected-TechnicalView
L11Rehabilitation and Upgradation of kolde kalamba to visarwadi NH-6 Nandurbar State Highway design ch. Km 50.200 to km 56.800 62.400 to 100.400 NH Section NH752-G to two lane with paved shoulder 4 Lane in the state of Maharashtra on EPC Mode
ministry of road transport and highwaysvisarwadi01-Mar-2025
₹187.00 CrAdmitted-FinanceView
DQUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 Bagasara to Thangalol section of NH351 in the state of Gujarat Package IV on EPC mode
ministry of road transport and highwaysBagasara to Thanagalol section13-Mar-2025
₹282.02 CrRejected-TechnicalView
DQRectification of 05 no blackspots viz Khara Industrial Area, Jamasar Bus Stand, Lunkaransar, Mokalsar, Premnagar Fata NH 62 Bikaner Suratgarh section under Road Safety Annual Plan 2024-25 in the State of Rajasthan on EPC Mode
ministry of road transport and highwaysbikaner21-Mar-2025
₹47.23 CrRejected-TechnicalView
DQConstruction of Champawat Bypass with two lane with paved shoulder configuration starting from existing chainage 121.700 to existing chainage 129.450 (Design Length 9.847) of NH-125 in District-Champawat in the state of Uttrakhand on EPC
ministry of road transport and highwaysChampawat Bypass24-Mar-2025
₹153.77 CrRejected-TechnicalView
L9Construction of two lane with paved shoulder of Ghatol Bypass from km 133.250 to km 140.950 of NH-56 (old NH-113) on EPC mode in the State of Rajasthan
ministry of road transport and highwaysGhatol04-Apr-2025
₹93.77 Cr₹123.40 Cr-24.01%Admitted-FinanceView
L9Rehabilitation and Up-Gradation of Wardha Salod Hirapur - Pulgaon Section of NH 347A from Km 134.283 to Km 159.075 Design Chainage Km 0.000 to Km 24.792 to Two Laning with paved shoulder in the state of Maharashtra on EPC mode
ministry of road transport and highwaysWardha Salod Hirapur - Pulgaon29-Apr-2025
₹119.77 Cr₹187.60 Cr-36.16%Admitted-FinanceView
Construction of 6 lane VUP at Junction of NH-148B (4-L) and NH-709E (4-L) on Bhiwani Bypass Bhiwani in Bhiwani District
ministry of road transport and highwaysRohtak30-Apr-2025
₹42.29 CrNot Admitted-Fee/PreQual/TechnicalView
Survey, Investigation, Planning, Designing and Construction of Tower-12 and Tower-13 at National Industrial Township at Agartala, Tripura on EPC Mode-I
wapcos limitedAgartala, Tripura21-Jun-2025
₹78.93 CrAdmitted-Fee/PreQual/TechnicalView
Survey, Investigation, Planning, Designing and Construction of Tower-8 and Tower-9 at National Industrial Township at Agartala, Tripura on EPC Mode-I
wapcos limitedAgartala, Tripura21-Jun-2025
₹92.53 CrAdmitted-Fee/PreQual/TechnicalView
DQConstruction 4lane-PS GGM-Alwar road (NH-248A) Nuh-FZR Jhirka up to RJ Border (46.95-95.97(DC.96.980) excld 50.900-54.46 nd 61.900-65.18) strength-imp of existing road 6.84 length in Malab vill (50.900-54.46) Bhadas vill (61.900-65.18) Nuh Haryana
ministry of road transport and highwaysHaryana24-Jul-2025
₹310.44 CrRejected-TechnicalView
DQConstruction of four lane with paved shoulder of Darbhanga Dilli More Banwari Patti from km 0.000 to km 14.950 Package 1 of NH 105 New NH 527B in the state of Bihar.
ministry of road transport and highwaysAs per NIT/RFP01-Sep-2025
₹285.69 CrRejected-TechnicalView
DQConstruction of four lane Gola Flyover at Km 99.850 of NH 730 Major Junction with state highway 93 on Engineering Procurement and Construction EPC Mode in the state of Uttar Pradesh
ministry of road transport and highwaysLakhimpur kheri09-Sep-2025
₹127.56 CrRejected-TechnicalView
DQRFP for the work of Improvement and upgradation to 2 lane with Paved Shoulder configuration from existing Km 7.410 to Km 56.245(design chainage km 0.000 to Km 49.235)Hadia Chauraha to Karmaini Ghat section of NH328 in the State of U.P.on EPC mode.
ministry of road transport and highwaysSant Kabir Nagar29-Sep-2025
₹351.25 CrRejected-TechnicalView
Construction of MSME Technology Centre at Jaipur (Rajasthan) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during DLP Period
ircon international limitedJaipur (Rajasthan)19-Jan-2026
₹82.00 CrAdmitted-Fee/PreQual/TechnicalView
Construction of MSME Technology Centre at Pune (Maharashtra) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during DLP Period
ircon international limitedPune (Maharashtra)19-Jan-2026
₹82.00 CrAdmitted-Fee/PreQual/TechnicalView
Construction of MSME Technology Centre at Samba (Jammu and Kashmir) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 years during DLP
ircon international limitedSamba12-Mar-2026
₹82.00 CrAdmitted-Fee/PreQual/TechnicalView
Construction of MSME Technology Centre at Bokaro (Jharkhand) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 years during DLP Period
ircon international limitedBokaro12-Mar-2026
₹83.00 CrAdmitted-Fee/PreQual/TechnicalView
Construction of MSME Technology Centre at Sindhudurg (Maharashtra) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 years during DLP P
ircon international limitedSindhudurg12-Mar-2026
₹81.00 CrAdmitted-Fee/PreQual/TechnicalView
EOI for assoc. as JV Partner from Exp. Agencies for PKG V2 A CONSTR. OF VIADUCT V2A 1x30.5 m OWG and 57x61 m OWG INCL. CONSTR. OF FOUNDATION, SUBSTRUCTURE... B/W CH. 82,657 TO 86,363... OF INDORE BUDNI... NEWBG LINE IN BHOPAL DIVISION OF WCR IN MP
ircon international limitedIndore, Madhya Pradesh23-Apr-2026
Admitted-Fee/PreQual/Technical/FinanceView
EOI for assoc. as JV Partner from Exp. Agencies for PKG V2B CONSTR. OF VIADUCT V2B 1x30.5 m OWG and 60x61 m OWG INCL. CONSTR. OF FOUNDATION, SUBSTRUCTURE... B/W CH. 86,363 TO 90,260... OF INDORE BUDNI... NEWBG LINE IN BHOPAL DIVISION OF WCR IN MP
ircon international limitedDewas, Madhya Pradesh23-Apr-2026
Admitted-Fee/PreQual/Technical/FinanceView
DQConstruction of Parallel Taxi Track (PTT) and Rapid Exit Taxi way (RET) at B M Airport, Ranchi.
airports authority of indiaRanchi Airport17-Jan-2026
₹107.98 CrRejected-TechnicalView

Frequently Asked Questions

How many government tenders has Silica Infra Private Limited participated in?

According to public e-procurement data records, Silica Infra Private Limited has participated in 41 government infrastructure and procurement tenders across central and state authorities.

How many tenders has Silica Infra Private Limited won as lowest bidder (L1)?

Silica Infra Private Limited has secured 3 tenders as the official lowest bidder (L1) or awardee, achieving an overall win rate of 7.3%.

What is the total value of government contracts awarded to Silica Infra Private Limited?

The cumulative value of project contracts awarded to Silica Infra Private Limited is approximately ₹252.99 Cr, across agencies such as national highways authority of india, ministry of road transport and highways, wapcos limited.

Explore more public procurement intelligence and infrastructure data: