| L8 | Improvement to two lane with paved shoulder of Saraigarh on NH 327A Lalganj Ganpatganj upto NH 106 New NH 131 from KM 0.000 to KM 10.672 Total Length 10.672 km of NH 327AD on EPC mode in the State of Bihar ministry of road transport and highways•supaul•25-Feb-2023 | ₹71.75 Cr | ₹83.10 Cr | -13.66% | Admitted-Finance | View |
| L7 | FOUR LANNING OF NH 4A NH 748 BETWEEN KM. 118 00 TO KM. 125 250 INCLUDING CONSTRUCTION OF HIGH LEVEL FOUR LANE NEW KHANDEPAR BRIDGE AT KM. 118 800 IN THE STATE OF GOA. BALANCE WORK ministry of road transport and highways•work•04-Mar-2023 | ₹85.76 Cr | ₹97.08 Cr | -11.66% | Admitted-Finance | View |
| L2 | Balance work of Construction of 2 Lane ROB and its approaches in lieu of existing level crossing (LC No. C-61) at Km 165.550 on NH-89 on EPC Mode in the State of Rajasthan ministry of road transport and highways•NAGAUR•17-Apr-2023 | ₹11.77 Cr | ₹9.38 Cr | +25.48% | Admitted-Finance | View |
| L5 | Widening to 2 lane with paved shoulders from 0.00 to 32.970 of Adilabad to Bela section of NH 353B in the State of Telangana ministry of road transport and highways•Telangana•15-Jun-2023 | ₹239.10 Cr | ₹360.06 Cr | -33.59% | Admitted-Finance | View |
| — | PBMC from Ch.264.100 km to Km 305.000 km and from Km 330.000Km to Km 345.000 km (Total length 55.90 km) of NH-15 under contract Maintenance of NH for 2023-24 under Nagaon NH Division, Nagaon in the state of Assam. Job No. PBMC/15/AS/2023-24/250 ministry of road transport and highways•Nagaon•13-Mar-2024 | — | — | — | Admitted-Fee/PreQual/Technical | View |
| — | PBMC estimate to NH-15 (Total 57.510 Km) under Rangia NH Division, Rangia under EPC mode of contract in the State of Assam. Job No. PBMC/15/AS/2023-24/251 ministry of road transport and highways•Rangia•14-Mar-2024 | — | — | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Widening from 2L to 2L with PS from km 21.000 to km 84.274 (Length 63.274) of New NH 106 along with resurfacing of existing bituminous surface and other miscellaneous works in the State of Meghalaya ministry of road transport and highways•NH 44E•12-Jun-2024 | — | ₹141.78 Cr | — | Rejected-Technical | View |
| — | Construction of road from km 34.700 to km 70.000 (Package-2) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹564.95 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 85.60 to km 126.15 (Package-5) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹558.58 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 35.000 to km 78.380 (Package-2) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹528.81 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 0.00 to km 28.50 (Package-1) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹476.22 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 0.000 to km 35.000 (Package-1) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹358.11 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 16.820 to km 43.650 (Package-2) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹337.23 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 43.65 to km 65.51 (Package-3) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹283.06 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 65.51 to km 85.60 (Package-4) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹249.19 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 19.554 to km 34.700 (Package-1) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹246.95 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of Balance Work of ROB at km 290.445 of Bareilly Sitapur Section of NH24 in the State of Uttar Pradesh. national highways authority of india•NHAI HQ•01-Jan-2020 | — | ₹45.23 Cr | — | Admitted-Finance | View |
| — | Construction of 6-lane Grade Separator at km.36.530 with LVUP at km. 36.894 including Approaches to Grade separator-LVUP from km.35.840-km.37.240 in Barhi-Hazaribagh Section(Hazaribagh Bypass) of the NH-33 in Jharkhand on EPC mode national highways authority of india•NHAI HQ•24-Jul-2020 | — | ₹49.07 Cr | — | Admitted-Finance | View |
| L1 | Rectification of 2 number Black Spots Package 1 Lakhanpur Golden Gate (17.711 to 18.892) and Logate Morh (26.900 to 28.720) on National Highway (NH) 44 in District of Kathua in the UT of Jammu and Kashmir national highways authority of india•Jammu•20-Aug-2020 | ₹33.63 Cr | ₹40.35 Cr | -16.66% | Awarded (L1) | View |
| L1 | Rectification of Black Spot Package 2 from km 31.640 to km 32.700 (Palli Morh) on NH 44 District Kathua in UT of Jammu and Kashmir national highways authority of india•Jammu•20-Aug-2020 | ₹21.59 Cr | ₹25.91 Cr | -16.66% | Awarded (L1) | View |
| DQ | 4 Laning of Pangare to Waranga Phata sec from Km 134.500 to Km 174.645 of NH-161 including additional lengths of 800 m from Waranga Junction to Nanded and 700 m road from Waranga Junction NH-161 to Mahagaon in the State of Maharashtra on EPC mode national highways authority of india•NHAI HQ•30-Sep-2020 | — | ₹758.28 Cr | — | Rejected-Technical | View |
| — | Construction of New Six Lane Major Bridge including Approaches from Km.172.895 to Km.173.670 of NH-215 (New NH -520) in Rimuli Koida Section in the State of Odisha under NHDP Phase III on Engineering, Procurement and Construction (EPC) Mode national highways authority of india•NHAI HQ•16-Dec-2020 | — | ₹94.01 Cr | — | Admitted-Finance | View |
| — | 4 laning of Sagar Mohari section of NH 934 from Design Chainage 8.000 to 50.300 under BMP Phase I Economic Corridor category on EPC mode in Madhya Pradesh national highways authority of india•NHAI HQ•25-Jan-2021 | — | ₹521.91 Cr | — | Accepted-Technical | View |
| — | Construction of 4-Laning of Puruliya Bypass section from Km 84.030 to Km. 94.345 of NH-32 (length 10.315 km.) in the state of West Bengal on EPC Mode. national highways authority of india•NHAI HQ•29-Jan-2021 | — | ₹235.83 Cr | — | Admitted-Finance | View |
| L2 | Improvement of Jhajjar Loharu section of NH 334B Km. 130.770 to Km. 228.630 (Design Chainage 0.000 to km.97.864) (Length 97.864 km.) in the State of Haryana Improvement of section from Km 135.070 to 173.050 (Design chainage from Km. 4.300 to 42 national highways authority of india•Rohtak•04-Feb-2021 | ₹18.71 Cr | — | — | Awarded: Suraj Construction Company | View |
| L1 | Rectification of Black Spot - Package 5 from km 67.180 to km 69.030 (Samba) i.e.1.85 national highways authority of india•Jammu•16-Apr-2021 | ₹88.90 Cr | — | — | Awarded (L1) | View |
| L1 | Improvement of Dharuhera Bhiwadi link road (NH-919, Old NH-71B) to 4 Lane with Service Road, starting from NH 48 (km 67.820) upto km 22.400 of NH-919 (4.3 km length) in Haryana national highways authority of india•NHAI HQ•01-Jul-2021 | ₹93.70 Cr | ₹117.07 Cr | -19.96% | Awarded (L1) | View |
| — | Construction of 2 lane flyovers at the junction of NH-28 and NH-28B at Kushinagar (Ch. 322.200) and at the junction of NH-28 and state MDR at Gopalgarh Tiraha (Ch. 325.750) on Gorakhpur-Kasya Section of NH-28 in the state of Uttar Pradesh on NH-27 national highways authority of india•work•08-Jul-2021 | — | — | — | Accepted-Technical | View |
| — | Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode national highways authority of india•NHAI HQ•18-Aug-2021 | — | ₹101.06 Cr | — | Admitted-Finance | View |
| L3 | Const. of 2 Lane right turning flyover from Sec 12A and industrial area Phase-I to Zirakpur over old NH22 (new NH05) between km 41.740 to km 42.350 incl. junction improvement and widening of HUDA road in Panchkula city in the State of Haryana in EPC national highways authority of india•Chandigarh•28-Oct-2021 | ₹16.21 Cr | — | — | Awarded: VISHESH INFRASTRUCTURE PVT LTD | View |
| — | Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 0.000 to 60.000 in the state of Odisha national highways authority of india•Keonjher•08-Jun-2023 | — | ₹229.50 Cr | — | Admitted-Finance | View |
| L1 | Construction of I ROB with approaches at Bhaiyachowk and SR on Sangli Solapur II VUP at Yawali incl SVUP on Pune Solapur PkgII III VUP with street light work on SolapurYedshi IV SR and widening of Box culvert on Akkalkot Solapur in Maharashtra on EPC national highways authority of india•Solapur•27-Jun-2023 | ₹96.51 Cr | ₹102.56 Cr | -5.9% | Awarded (L1) | View |
| — | Construction of balance works of two number of interchanges at Jaipur Ring Road (NH 148C) from Tonk road (NH 52) to Ajmer road section (NH 48) in the state of Rajasthan on Engineering Procurement and Construction (EPC) Mode national highways authority of india•NHAI HQ•25-Aug-2023 | — | ₹141.82 Cr | — | Admitted-Finance | View |
| — | Construction of six lane flyover with approaches and Service road (i/c Acceleration/Deceleration lane as per manual) on Bareilly bypass of NH-24 (Moradabad- Bareilly section) from km.259.690 to km.261.105 in the state of Uttar Pradesh national highways authority of india•Moradabad•01-Dec-2023 | — | ₹44.96 Cr | — | Admitted-Finance | View |
| — | Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod,Bhojlawa, Hadota, Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode national highways authority of india•NHAI RO Jaipur•08-Dec-2023 | — | ₹193.27 Cr | — | Accepted-Technical | View |
| DQ | Strengthening work of stretch of Khanapara to Jagiroad from Km. 163.400 to Km. 205.000 (Balance Portion of Guwahati Bypass, Package no. AS-03 and AS-20) of NH 37 in the State of Assam. Length 41.600 km) national highways authority of india•ROGHY NHAI•30-Jan-2024 | — | ₹62.49 Cr | — | Rejected-Technical | View |
| DQ | Construction widening of Service Road and Installation of street Lights on Solapur Yedeshi Section of NH 52 on EPC Mode national highways authority of india•Solapur•09-Jan-2024 | ₹54.00 Cr | ₹68.41 Cr | -21.06% | Awarded: Sitaram Infraproject Pvt.Ltd. | View |
| DQ | Strengthening and Major maintenance work of stretch of Patacharkuchi to Baihata from Km. 1040.300 to Km. 1097.150 (Package no. AS06 AS05 AS04 balance) of NH 31 in the State of Assam on PBMC Mode. national highways authority of india•NHAI HQ•08-Feb-2024 | — | ₹99.83 Cr | — | Rejected-Technical | View |
| — | Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli Kota section in the State of Rajasthan on EPC Mode national highways authority of india•NHAI RO JAIPUR•23-Feb-2024 | — | ₹79.26 Cr | — | Accepted-Technical | View |
| — | Construction of 2 LVUPs national highways authority of india•Thiruvananthapuram•24-Feb-2024 | — | ₹26.16 Cr | — | Accepted-Technical | View |
| L2 | Construction of 4 Nos of Standalone safety structures-works at different locations on various NHs in the State of Maharashtra on EPC Mode 2ND CALL national highways authority of india•NHAI HQ•28-Feb-2024 | ₹164.25 Cr | ₹169.86 Cr | -3.3% | Awarded: Tejas Superstructures Pvt Ltd | View |
| — | Balance Work of Rehabilitation and upgradation to 4 laning of NH31D from Km 113.200 to Km 154.854 (Pkg IIA) Falakata Salsalabari Section in the State of West Bengal on EPC Basis national highways authority of india•NHAI HQ•07-Mar-2024 | — | ₹766.67 Cr | — | Admitted-Finance | View |
| L1 | Design and Reconstruction of RE wall Approaches of ROB at km 109.900 and 121.045 in Shivpuri Bypass of Gwalior-Shivpuri Section of NH-46 in the state of Madhya Pradesh on EPC mode national highways authority of india•NHAI RO JABALPUR•15-Mar-2024 | ₹30.31 Cr | ₹36.99 Cr | -18.06% | Awarded (L1) | View |
| DQ | Design and Construction of Major Bridge along with its allied works for rectification of blackspots at Bale Bridge Ch 245 700 and at Old Pune Naka Bridge ch 246 600 on Pune Solapur Km150 050 to Km 251 325 section of NH 65 in the state of Maharashtra national highways authority of india•Solapur•16-Mar-2024 | ₹37.00 Cr | — | — | Awarded: VSP INFRASTRUCTURES | View |
| — | Streth and Major maintenance work of 2Laning with paved shoulder of Chhapra Gopalganj sec of NH85 Km 0.000 to Km 93.500 and Km. 0.000 to Km. 94.258 (Total Design length 94.258 Km) in Bihar on PBMC national highways authority of india•NHAI HQ•02-Jul-2024 | — | ₹115.95 Cr | — | Admitted-Finance | View |
| — | Strengthening and Major Maintenance of Four Lane divided carriageway Road with paved shoulders configuration from Km.205.00 to Km. 278.685 of NH37 in Assam on PBMC Mode2nd Call national highways authority of india•NHAI HQ•04-Jul-2024 | — | ₹102.31 Cr | — | Admitted-Finance | View |
| L1 | Construction of 4 lane viaduct at the junction of Ring Road with Bathinda-Tapa section of NH-07 at Km. 212.700 in Bathinda of NH-07 in the state of Punjab on EPC Mode. national highways authority of india•PIU Bathinda•15-Jan-2025 | ₹14.25 Cr | ₹16.03 Cr | -11.11% | Awarded (L1) | View |
| L1 | Construction of Major Bridge at Ch. 14.020 (RHS) at Pinjore-Nalagarh section on NH 105(Old NH 21A) in the state of Haryana on EPC Mode national highways authority of india•NHAI PIU Shimla•03-Feb-2025 | ₹6.03 Cr | ₹7.55 Cr | -20.11% | Awarded (L1) | View |
| L1 | Construction of 6-Lane Elevated Structure at Km 462.160 at Loharka including balance Work of Approaches on Amritsar Wagah Border Section of NH-03 in the State of Punjab on EPC Mode national highways authority of india•PIU Amritsar•04-Feb-2025 | ₹16.94 Cr | ₹15.87 Cr | +6.74% | Awarded (L1) | View |
| L3 | Guwahati Bypass (NH_37) (New NH_27) from section chainage km. 146.172 to km. 162.620 in the State of Assam national highways authority of india•NHAI RO GHY•05-Feb-2025 | ₹29.66 Cr | ₹37.08 Cr | -20.01% | Rejected-Finance | View |
| DQ | Rectification of 7 nos. of Blackspots by Construction of Service Road at Kanchi Ghati,Flyover at Badanyagav, Service Road at Silor puliya tiraha, Flyover at Ramganj balaji, Flyover at Barundhan Tiraha, Flyover at Aktasa Bypass on Deoli Kota section national highways authority of india•NHAI RO JAIPUR•02-Apr-2025 | — | ₹149.39 Cr | — | Rejected-Technical | View |
| — | Rectification of 08 nos. MoRTH identified Blackspots on Chittorgarh Kota section of NH 27 in the state of Rajasthan on Engineering, Procurement and Construction (EPC) Mode national highways authority of india•NHAI RO JAIPUR•03-Apr-2025 | — | ₹113.24 Cr | — | Accepted-Technical | View |
| DQ | Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh national highways authority of india•NHAI HQ•02-Jun-2025 | — | ₹191.55 Cr | — | Rejected-Technical | View |
| L2 | Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode national highways authority of india•NHAI HQ•19-Sep-2025 | ₹66.65 Cr | ₹118.99 Cr | -43.99% | Awarded: VIDYA INFRABUILT PRIVATE LIMITED | View |
| — | Design and Construction of 03 VUP at Billowa Tiraha 1197.280 Kalyani Chauraha 1200.250 and Arru Tiraha 1216.000 for permanent rectification of MoRTH identified Blackspot locations along with Gabion wall in Jaurashi Ghati 1192.000 to 1192.700 LHS and national highways authority of india•NHAI PIU-Gwalior•27-Dec-2025 | — | ₹109.43 Cr | — | Admitted-Finance | View |
| L2 | Construction of Flyover at Parimpora Junction and Shalteng Junction on Srinagar Bypass (NH 44) in the UT of J and K under Road Safety Works on EPC mode ministry of road transport and highways•Srinagar•11-Feb-2025 | ₹61.21 Cr | ₹81.72 Cr | -25.1% | Admitted-Finance | View |
| DQ | Construction of Missing Link from km 84.0 to km 112.00 of Gundenoor to Maharashtra Chhattisgarh border section of NH 130D Total length 28.00 km in the State of Maharashtra on Item Rate Mode ministry of road transport and highways•Gundenoor•28-Nov-2025 | — | ₹277.94 Cr | — | Rejected-Technical | View |
| DQ | Construction of PTT and RET at Ranchi Airport airports authority of india•Ranchi•29-Sep-2023 | — | — | — | Rejected-Technical | View |
| L3 | Construction of new civil Enclave at Jammu Airport, Phase-I. SH Construction of Apron and associated works for parking of 13 Nos. AB-321 type of Aircraft airports authority of india•Jammu Airport•16-Nov-2023 | ₹47.36 Cr | ₹57.60 Cr | -17.79% | Awarded: M/s SHIVAM CONSTRUCTION CO., MALOUT | View |
| — | Strengthening of Basic Strip of Runway including Levelling and Grading, Construction of RCC Drain and Rain water Harvesting inside operational area at Kadapa Airport airports authority of india•KADAPA AIRPORT•06-Dec-2023 | — | ₹44.70 Cr | — | Not Admitted-Fee/PreQual/Technical | View |
| DQ | AAI/RJY/Widening of Perimeter Road airports authority of india•Rajahmundry Airport•18-Jun-2024 | ₹7.03 Cr | ₹8.60 Cr | -18.24% | Awarded: M/s S.V.CONSTRUCTIONS | View |
| L1 | Re-carpeting of Runway, Taxiway, Apron, perimeter road along with construction of runway shoulder, blast pad, perimeter road shoulder and RESA extension at CA Kandla airports authority of india•Kandla Airport•02-Jul-2025 | ₹16.50 Cr | ₹19.28 Cr | -14.43% | Awarded (L1) | View |
| L1 | Re-carpeting of Runway at Puducherry Airport airports authority of india•AAI, Puducherry Airport•19-Dec-2025 | ₹13.71 Cr | ₹17.10 Cr | -19.84% | Awarded (L1) | View |