| — | Performance Based Maintenance Contract Work of on Flexible and Rigid Pavement of Maksudangarh - Sironj Section Km 42.510 to 92.640 of NH-752B road (length 50.13 Km) in the State of Madhya Pradesh. ministry of road transport and highways•Maksudangarh - Sironj Section•02-Jun-2026 | — | ₹29.16 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L6 | W Metal Beam Crash Barrier in KM 132.600 to km 142.600 (Kanker Portion) and km 162.600 to km 170.400 (Keshkal Ghat Portion) of NH-30 under Road Safety Plan 2022_23. ministry of road transport and highways•Kanker•19-May-2023 | ₹3.00 Cr | ₹3.41 Cr | -12.04% | Admitted-Finance | View |
| L7 | Crash Barrier work in km 287.00 to 504.00 Bhopalpatnam to Jagdalpur Road and km 299.00 to 316.880 Jagdalpur to Dhanpunji Bordar of NH-63 ministry of road transport and highways•Jagdalpur•19-May-2023 | ₹3.31 Cr | ₹3.78 Cr | -12.66% | Admitted-Finance | View |
| L4 | Providing and installation of W Type Metal Crash Barrier and Sign Board on Curve From Km. 0.000 to 65.820 on NH-353 under Road Safety Plan 2022-23 ministry of road transport and highways•Mahasamund•19-May-2023 | ₹3.37 Cr | ₹4.36 Cr | -22.57% | Admitted-Finance | View |
| L3 | SHORT TERM ROAD SAFETY MEASURES FOR 11 NOS BLACK SPOT UNDER AMBIKAPUR NH DIVISION IN N.H. -43 AND N.H. -130 under Road Safety Pland 2022-23 ministry of road transport and highways•Ambikapur•19-May-2023 | ₹3.25 Cr | ₹2.95 Cr | +10% | Admitted-Finance | View |
| — | Providing Incident Management service on Nagaur Jodhpur section from km 267.500 Netra village to km 296.070 Mandor of NH62 in the State of Rajasthan in annual plan 2023 24 (For 01 10 2023 to 31 03 2024 ministry of road transport and highways•NAGAUR•28-Sep-2023 | — | ₹42.00 L | — | Accepted-Technical | View |
| DQ | Performance based Maintenance contract on Flexible and Rigid Pavement of Rewa-Sirmour Section of NH-135B road (length 36.71 Km) in the state of Madhya Pradesh ministry of road transport and highways•Rewa-Sirmour Section of NH-135B road•04-Oct-2024 | — | ₹30.26 Cr | — | Rejected-Technical | View |
| L2 | Performance based Maintenance contract of Rigid Pavement of NH-347B Anjad Thikri section from Km 0/000 to Km 34/560 (length 34.56 km) in the state of Madhya Pradesh ministry of road transport and highways•NH-347B Anjad Thikri section•03-Oct-2024 | ₹6.66 Cr | ₹19.35 Cr | -65.57% | Admitted-Finance | View |
| — | PBMC work on Morena-Ambah-Porsa from Ch 238.940 to Ch 282.540 (Total Length-41.476 Km.) NH-552 Extn. in the State of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) mode ministry of road transport and highways•WORKS•11-Feb-2025 | — | ₹23.86 Cr | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Annual Maintenance Contract Short Term Improvement and Routine Maintenance Contract for Four Lane of 1251.814 615.814 RJ MP Border) and 0.00 MP to 1305 087 54.087 MP tolling reach of Ramanagar Toll Plaza of Baran Shivpuri Section of New NH27 national highways authority of india•NHAI RO Bhopal•16-Jul-2021 | — | ₹4.69 Cr | — | Rejected-Technical | View |
| L2 | Short term repair, routine maintenance and Incident Management of Tapa to Bathinda section of NH-64 (New NH07) from km 175.000 to km 216.350 for 01 years national highways authority of india•Bathinda•03-Nov-2021 | ₹3.01 Cr | — | — | Awarded: ROADLINK INFRATECH PVT LTD | View |
| — | Routine Maintenance, Incident Management from km 1076.480(chinnaavutupalli) to km 1100.254(kanaka durgamma varadhi) and Incident management from Gundugolanu(1023.280) - Chinnaavutupalli(1076.480) of Vijayawada-Gundugolanu section of NH-16 in AP national highways authority of india•Vijayawada•11-Dec-2021 | — | ₹6.25 Cr | — | Accepted-Technical | View |
| DQ | Operation and maintenance including Incident Management of Zirakpur to Patiala section of NH-64 (NH-07) from km. 0.000 to km. 50.000 under NHDP-IV in the State of Punjab national highways authority of india•PATIALA•20-Jan-2022 | — | ₹7.41 Cr | — | Awarded: Vmaks Constructions Private Limited | View |
| L1 | Short term repair, routine maintenance and incident Management of Start of Sangrur to Dogal Kalan of NH-71 (New NH-52) from km. 181.805 to 211.450 in the State of Punjab for the period of one year national highways authority of india•PATIALA•22-Jan-2022 | ₹2.13 Cr | ₹3.89 Cr | -45.11% | Awarded (L1) | View |
| — | Short Term Improvements and Routine Maintenance of 2-lane with paved shoulder stretch from km. 615.000 to km. 668.600 on Kalyan to Nirmal section of NH-61 in the State of Telangana for a period of One Year national highways authority of india•Kalyan to Nirmal section of NH-61•02-Jun-2022 | — | ₹7.32 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi-Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana national highways authority of india•NHAI HQ•03-Aug-2022 | — | ₹6.64 Cr | — | Admitted-Finance | View |
| L1 | Operation and Maintenance of Jhalawar Rajasthan M.P. Border Section of NH 12 (New NH 52) from Km. 346.540 to Km. 408.700 in the State of Rajasthan national highways authority of india•NHAI RO JAIPUR•08-Aug-2022 | ₹3.97 Cr | ₹5.72 Cr | -30.5% | Awarded (L1) | View |
| — | Operation and Maintenance of Wadner - Devadhari - Kelapur - Pimpalkhuti Section from Km. 94.000 to Km.175.000 of NH-44 in the State of Maharashtra national highways authority of india•NHAI RO, Nagpur•17-Aug-2022 | — | — | — | Not Admitted-Fee/PreQual/Technical | View |
| DQ | Operation and Maintenance for Dindigul-Kumili section of NH-183 national highways authority of india•Dindigul•17-Nov-2022 | — | ₹10.71 Cr | — | Rejected-Technical | View |
| L1 | Short Term Improvement and Routine Maintenance of stretch from design km 0.000 to 100.757 and from km 107.350 to km 125.380 of four lane of Gwalior-Shivpuri Section of NH-46 in MP national highways authority of india•Gwalior, Shivpuri•29-Dec-2022 | ₹7.90 Cr | ₹11.29 Cr | -29.99% | Awarded (L1) | View |
| L1 | Road Safety Measures and Operation and Maintenance of NH 17B from Km 0 000 Verna Junction to Km 13 100 Varunapuri Junction in the State of Goa national highways authority of india•Goa•06-Jan-2023 | ₹2.35 Cr | — | — | Awarded (L1) | View |
| DQ | Incident Management work for the Lalitpur Sagar Lakhnadon Section of NH 44 from k 99.005 to Km. 415 89 Total Length 316.084 Km in the State of Madhya Pradesh Uttar Pradesh national highways authority of india•NHAI PIU Sagar•04-Feb-2023 | — | ₹2.24 Cr | — | Rejected-Technical | View |
| — | Routine Maintenance for the Stretch from Chinna Avutupalli To Kanaka Durgamma Varadhi and Incident Management for the Stretch from Gundugolanu Kanaka Durgamma Varadhi Sections of Vijayawada Gundugolanu Section of NH-16 Old NH5 for a Period of 2 Ye national highways authority of india•vijayawada•18-Feb-2023 | — | ₹11.94 Cr | — | Admitted-Finance | View |
| DQ | Road Incident Management work of NH 547 and 347 under PIU Chhindwara national highways authority of india•NHAI PIU Chhindwara•29-May-2023 | — | ₹7.33 Cr | — | Rejected-Technical | View |
| L2 | Routine Maintenance and Incident Mangement of Mandla-Chilpi Section of NH-30(old NH-12A) from Km. 85.400 to Km 177.750 in the state of Madhya Pradesh NH national highways authority of india•NHAI PIU Jabalpur•02-Jun-2023 | ₹3.89 Cr | ₹5.08 Cr | -23.47% | Awarded: Vmaks Constructions Private Limited | View |
| DQ | Routine Maintenance and Incident Management of Gurgaon Kotputli Jaipur section of NH 08 (New NH 48) from Km.107.100 to Km. 273.00 in the state of Rajasthan national highways authority of india•NHAI RO JAIPUR•19-Jun-2023 | — | ₹17.18 Cr | — | Rejected-Technical | View |
| — | Routine Maintenance and Incident Management of Four Laning of Rewa-Katni-Jabalpur Section of NH-7 (new NH-30) from Km 397.000 to Km 465.500 (Package- IV) in the state of Madhya Pradesh national highways authority of india•works•01-Jul-2023 | — | ₹7.00 Cr | — | Accepted-Technical | View |
| DQ | Road Incident Management work by Hiring of One 01 patrolling vehicle one 01 national highways authority of india•PIU Chhatarpur•05-Jul-2023 | — | ₹54.00 L | — | Rejected-Technical | View |
| DQ | Road Incident Management work by Hiring One 01 patrolling vehicle one 01 national highways authority of india•PIU Chhatarpur•05-Jul-2023 | — | ₹54.00 L | — | Rejected-Technical | View |
| DQ | Incident Management on Four Laning of Bareilly-Sitapur section of NH-24 from km.262.000 to km. 419.590 in the state of Uttar Pradesh national highways authority of india•PIU Bareilly•19-Jul-2023 | — | — | — | Rejected-Technical | View |
| — | Routine Maintenance including Incident Management for Operation and Maintenance of Kathipudi to Start of Kakinada Bypass Section of NH216 from Km.0.000 to Km.27.500 in the state of Andhra Pradesh. national highways authority of india•Kakinada•02-Aug-2023 | — | ₹4.08 Cr | — | Accepted-Technical | View |
| L3 | Operation and Maintenance including Incident Management System for Ludhiana-Talwandi Section of NH-95 (New NH-05) from Km 85.980 to Km 170.000 in the State of Punjab national highways authority of india•PIU Ludhiana•11-Aug-2023 | ₹3.64 Cr | ₹6.02 Cr | -39.47% | Awarded: Vmaks Constructions Private Limited | View |
| DQ | Additional signages and other road safety furniture from Km.18.000 to Km.135.304 on Bangalore Nidagatta Mysore section of NH275 in the state of Karnataka national highways authority of india•Bangalore to Mysore•14-Sep-2023 | ₹5.33 Cr | ₹7.64 Cr | -30.3% | Rejected-Finance | View |
| L1 | NHAI/RO-JBP/PIU-Katni/P-1/OnM national highways authority of india•work•22-Sep-2023 | ₹4.38 Cr | ₹8.03 Cr | -45.47% | Awarded (L1) | View |
| L2 | Repair, routine maintenance and Incident Management of Start of Sangrur to Punjab/Haryana Border section from Km 181.805 to Km 238.695 of NH-71 (New NH-52) in the State of Punjab national highways authority of india•PIU Chandigarh•22-Sep-2023 | ₹4.20 Cr | ₹6.94 Cr | -39.47% | Awarded: Vmaks Constructions Private Limited | View |
| L1 | Annual Maintenance for Chennai Bypass from Km 0.000 to Km 32.000 in the state of Tamil Nadu national highways authority of india•Chennai Bypass•09-Oct-2023 | ₹7.19 Cr | ₹11.50 Cr | -37.47% | Awarded (L1) | View |
| — | Routine Maintenance works for Palanpur/Khemana to Abu Road to Swaroopganj section (from Km. 601.000 to Km. 677.000) of NH27 in the State of Gujarat and Rajasthan national highways authority of india•NHAI HQ•15-Feb-2024 | — | ₹2.00 Cr | — | Admitted-Finance | View |
| L1 | Operation and Maintenance of 4-laning of Ayodhya - Gorakhpur Section (From km. 142.810 to km 252.860) of NH-28 (new NH-27) national highways authority of india•Gorakhpur•08-Jun-2024 | ₹3.41 Cr | ₹25,000 | +136482.9% | Awarded (L1) | View |
| L1 | Operation and Maintenance of 2 and 4 laning of Rudhauli to Basti national highways authority of india•Gorakhpur•08-Jun-2024 | ₹2.99 Cr | ₹25,000 | +119451.04% | Awarded (L1) | View |
| L1 | OMworkThirumayamNH22636 national highways authority of india•ThirumayamManamadurai•13-Jun-2024 | ₹4.19 Cr | ₹6.92 Cr | -39.47% | Awarded (L1) | View |
| L2 | Routine Maintenance including Incident Management (Excluding Ambulance services) for Four Laning of Vijayawada Machilipatnam section of NH-65 from Km.0.000 to Km.64.611 and Eastern side Benz Circle Flyover on NH-16 in the state of Andhra Pradesh. national highways authority of india•Vijayawada•18-Jun-2024 | ₹8.36 Cr | ₹13.90 Cr | -39.87% | Awarded: SHIVA BUILDTECH PVT LTD | View |
| — | Operation and Maintenance of Six Laning of Hosur Krishnagiri section of NH-44 from Km.33/130 to Km.93/000 in the State of Tamil Nadu national highways authority of india•Hosur Krishnagiri Section of NH-44•28-Jun-2024 | — | ₹14.10 Cr | — | Accepted-Technical | View |
| — | Operation and Maintenance for one year of Madurai - Paramakudi section of NH85 87 in the State of Tamil Nadu national highways authority of india•Madurai•26-Jul-2024 | — | ₹10.16 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L2 | Operation and Maintenance including Incident Management for one year of Four laning of Madurai to Paramakudi section from Km 5/000 to Km 81/064 of NH-85 and 87 (Old NH-49) in the State of Tamil Nadu on an item rate basis (2nd Call) national highways authority of india•Madurai•24-Aug-2024 | ₹6.01 Cr | ₹10.16 Cr | -40.89% | Rejected-Finance | View |
| L1 | UPC N/04007/14001/TS Short Term Improvements and Routine Maintenance of 4/6 Lane with paved shoulder stretch from Km 40.000 to Km 100.000 on Hyderabad to Vijayawada section of NH 65 in the state of Telangana. national highways authority of india•Km 40 to Km 100 on Hyderabad to Vijayawada NH 65.•27-Jul-2024 | ₹3.36 Cr | — | — | Awarded (L1) | View |
| L1 | UPC N/04007/14001/TS Short Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 100.000 to Km 160.000 on Hyderabad to Vijayawada section of NH 65 in the state of Telangana. national highways authority of india•Km 100 to Km 160 on Hyderabad to Vijayawada NH 65.•27-Jul-2024 | ₹3.38 Cr | — | — | Awarded (L1) | View |
| L1 | UPC N/04007/14001/TS Short Term Improvements and Routine Maintenance of 4/6-lane with paved shoulder stretch from Km 160.000 to Km 221.500 on Hyderabad to Vijayawada section of NH-65 in the state of Telangana. national highways authority of india•Km 160 to 221.500 on Hyderabad to Vijayawada NH-65•27-Jul-2024 | ₹3.37 Cr | — | — | Awarded (L1) | View |
| DQ | Annual Maintenance including Incident Management of Two laning with paved shoulders of Thanjavur to Pudukkottai Section from Km 174.000 to Km 229.228 of NH36 in the State of Tamil Nadu on Item Rate Basis (2nd Call) national highways authority of india•Thanjavur to Pudukkottai•21-Aug-2024 | ₹3.42 Cr | ₹4.84 Cr | -29.47% | Rejected-Finance | View |
| — | Routine Maintenance and Incident Management of Mandla-Chilpi Section of NH-30 national highways authority of india•work•14-Aug-2024 | — | ₹13.68 Cr | — | Accepted-Technical | View |
| — | Annual Maintenance including Incident Management of Four laning of Trichy Bypass to Tovarankurichi to Madurai section from Km 0/000 to Km 124/840 of NH-45B (New NH-38) in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Madurai•24-Aug-2024 | — | ₹10.94 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L3 | Road Safety Measures and Operation and Maintenance national highways authority of india•Goa•29-Aug-2024 | ₹2.63 Cr | — | — | Awarded: SANWARIYA CONSTRUCTION | View |
| L3 | Annual Maintenance including Incident Management of Four laning of Madurai - Tuticorin Section from Km 138.800 to Km 266.865 of NH-38 in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Madurai / Tuticorin•03-Sep-2024 | ₹6.13 Cr | ₹9.27 Cr | -33.89% | Rejected-Finance | View |
| — | Annual Maintenance including Incident Management of Trichy to Karaikudi section from Km 10/000 to Km 91/054 of NH-210 (New NH-336,36 and 536) including Trichy Bypass from Km 110/016 to Km 135/930 of NH-67 in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Trichy - Karaikudi•05-Nov-2024 | — | ₹12.36 Cr | — | Admitted-Finance | View |
| — | Operation and Maintenance including Incident Management for the 4 lane stretch of Kathipudi to start of Kakinada Bypass from Km0.000 to Km27.500 section of NH216 in the State of Andhra Pradesh national highways authority of india•Kakinada•09-Jan-2025 | — | ₹8.65 Cr | — | Accepted-Technical | View |
| L3 | Annual Maintenance for Chennai Bypass from Km 0.000 to Km 32.000 in the state of Tamil Nadu national highways authority of india•Chennai Bypass•10-Jan-2025 | ₹5.49 Cr | ₹7.17 Cr | -23.47% | Rejected-Finance | View |
| — | Annual Maintenance for Tirupati-Tiruttani-Chennai section of NH-205 from Km 274.800 to Km 338.030 in the state of Andhra Pradesh and from Km 0.000 to Km 43.950 in the state of Tamil Nadu national highways authority of india•Tirupathi - Tiruttani - Chennai•10-Jan-2025 | — | ₹3.53 Cr | — | Admitted-Finance | View |
| — | Short-Term Maintenance Contract (One Year) and Routine Maintenance including Incident Management of Bhakarapet to Kalur section of NH-71 from Km.77/400 to Km.101/000 (total length 23.600 Km) in the state of Andhra Pradesh national highways authority of india•Tirupati•16-Jan-2025 | — | — | — | Admitted-Finance | View |
| DQ | Improvement works in respect of Lakhnadon Khawasa Section of NH-44 (old NH-07) from 546.420 to Km 653.770 in the State of Madhya Pradesh on item rate mode national highways authority of india•NHIPMPL•24-Jan-2025 | — | ₹13.63 Cr | — | Awarded: DHINGRA BROTHERS (INDIA) | View |
| — | Operation and Maintenance of Krishnagiri Tindivanam section of NH77 from Km.0.000 to Km.182.182 in the state of Tamil Nadu national highways authority of india•Krishnagiri - Tindivanam section of NH-77 (Old NH-•24-Feb-2025 | — | ₹13.89 Cr | — | Accepted-Technical | View |
| — | Routine Maintenance and Incident Management work of Four lane Talaja- Mahua- Kagvadar section of NH-8E (New NH-51) from km 53.585 to km 139.915 (Design chainage from km 54.990 to Km 140.470) in the State of Gujarat (Pkg-II and Pkg-III) on Item Rate national highways authority of india•NHAI Regional Office, Gandhinagar•08-May-2025 | — | ₹3.24 Cr | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana on item rate basis. national highways authority of india•NHAI HQ•14-May-2025 | — | ₹10.10 Cr | — | Awarded: Vmaks Constructions Private Limited | View |
| DQ | Operation and Maintenance and Providing Incident Management Services of Tambaram to Tindivanam section of NH 45 from Km28/000 to Km121/000 in the State of Tamil Nadu on Single Percentage Item Rate Basis national highways authority of india•Tambaram to Tindivanam section of NH 45•26-Jun-2025 | — | ₹26.33 Cr | — | Rejected-Technical | View |
| — | Operation and Maintenance and Providing Incident Management Services of Pondicherry to Tindivanam section of NH 66 from Km 0/000 to Km 38/608 in the State of Tamil Nadu and Puducherry (UT) national highways authority of india•Pondicherry to Tindivanam section of NH 66•26-Jun-2025 | — | ₹12.25 Cr | — | Accepted-Technical | View |
| — | Routine Maintenance including Incident Management (Excluding Ambulance services) for Four Laning of Vijayawada-Machilipatnam section of NH-65 from Km 0.000 to Km 64.611 and Eastern side Benz Circle Flyover on NH-16 in the state of AP. national highways authority of india•Vijyawada•09-Jul-2025 | — | ₹12.18 Cr | — | Accepted-Technical | View |
| L1 | Operation and Maintenance including Incident Management of Thirumayam - Manamadurai Section of NH-36 (Old NH-226) for a period of one year in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Thirumayam - Manamadurai•19-Sep-2025 | ₹2.32 Cr | ₹3.80 Cr | -38.89% | Awarded (L1) | View |
| L1 | Operation and Maintenance including Incident Management of Four laning of Trichy Bypass to Tovarankurichi - Madurai section from Km 0.000 to Km 124.840 of NH-45B (New NH-38) in the State of Tamil Nadu on Item Rate Basis (2nd Call) national highways authority of india•Trichy - Madurai•20-Dec-2025 | ₹8.41 Cr | ₹11.82 Cr | -28.89% | Awarded (L1) | View |
| — | Short Term Improvement, Routine Maintenance including Incident Management services for Teendhar Rajasthan M.P. Border Section of New NH 52 from New Km 355.537 to Km 416.700 (Old Km 346.540 to Km 408.700) in the State of Rajasthan. national highways authority of india•NHAI RO JAIPUR•14-Nov-2025 | — | ₹6.91 Cr | — | Accepted-Technical | View |
| — | Operation and Maintenance of Two lane with paved shoulder of Jodhpur Pachpadra section of NH 25 from Km 95.140 to 114.610 and Km 116.060 to 180.755 in the State of Rajasthan (length km 84.165) national highways authority of india•NHAI RO JAIPUR•08-Dec-2025 | — | ₹10.69 Cr | — | Accepted-Technical | View |
| DQ | Operation and Maintenance including Incident Management for One Year from Km 0.000 to Km 38.000 of Dindigul-Natham section of NH-383 in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Dindigul - Natham•02-Jan-2026 | ₹8.85 Cr | ₹10.99 Cr | -19.47% | Rejected-Finance | View |
| L2 | Operation and Maintenance including Incident Management for One Year from Km 6.000 to Km 74.912 of Thanjavur to Perambalur section of NH-136 in the State of Tamil Nadu on an Item Rate Basis national highways authority of india•Thanjavur - Perambalur•23-Jan-2026 | ₹8.87 Cr | ₹11.01 Cr | -19.47% | Rejected-Finance | View |
| L1 | Annual Maintenance including Incident Management of Trichy-Karaikudi section NH-336, 36 and 536 including the Trichy Bypass section of NH-83 in the State of Tamil Nadu on Item Rate Basis national highways authority of india•Trichy - Karaikudi•14-Mar-2026 | ₹4.69 Cr | ₹7.89 Cr | -40.47% | Awarded (L1) | View |
| L2 | STMC work on nh168 from km 0 to 71.400 old sd 24 km, 197 to 267.400 Anandra choraya sirohi to state borader rajasthan gujrat and nh 62 near sirohi to anadra choraya sirohi km 0 to 4.5 left our of old nh 14 in tjhe state of rajasthan ministry of road transport and highways•PALI•16-Nov-2024 | ₹3.50 Cr | ₹4.61 Cr | -24.17% | Admitted-Finance | View |
| L2 | PBMC work of Rigid pavement of NH 752-B Biaora Maksudangarh section from Km 3/150 to Km 38/700, km 42/030 to km 42/510, length 36.03 km, in the state of Madhya Pradesh ministry of road transport and highways•NH 752-B Biaora Maksudangarh section•04-Mar-2025 | ₹9.38 Cr | ₹16.05 Cr | -41.56% | Admitted-Finance | View |
| L1 | PBMC work of Rigid pavement of NH 752-B Biaora Maksudangarh section from Km 3/150 to Km 38/700, km 42/030 to km 42/510, length 36.03 km, in the state of Madhya Pradesh (2nd Call) ministry of road transport and highways•NH 752-B Biaora Maksudangarh section•31-Jul-2025 | ₹8.84 Cr | ₹16.05 Cr | -44.89% | Awarded (L1) | View |
| L2 | PBMC work of Rigid pavement of NH 752B Khilchipur- Jirapur section from Km 5.5 to Km 22.91, Length 17.410 km in the state of Madhya Pradesh ministry of road transport and highways•Biaora Maksudangarh section•05-Mar-2025 | ₹6.30 Cr | ₹9.53 Cr | -33.89% | Admitted-Finance | View |
| L1 | PBMC work of Rigid pavement of NH 752B Khilchipur- Jirapur section from Km 5.5 to Km 22.91, Length 17.410 km in the state of Madhya Pradesh ministry of road transport and highways•Khilchipur- Jirapur•28-Jul-2025 | ₹5.16 Cr | ₹9.53 Cr | -45.89% | Awarded (L1) | View |
| L1 | Performance based Maintenance contract on Rigid Pavement from km 41/800 to km 82/300 (Ashta Shujalpur section) including White Topping from km 82/300 to km 85/180 on NH 752C (Total Length 43.38 km in the state of Madhya Pradesh ministry of road transport and highways•Ashta Shujalpur section•23-Apr-2025 | ₹11.27 Cr | ₹19.97 Cr | -43.57% | Awarded (L1) | View |
| — | PBMC work on Morena-Ambah-Porsa from Ch 238.940 to Ch 282.540 (Total Length-41.476 Km.) NH-552 Extn. in the State of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) mode ministry of road transport and highways•WORKS•27-May-2025 | — | ₹23.86 Cr | — | Accepted-Technical | View |
| — | STMC Work from Km. 00/00 (Jherda) State Border Rajasthan Gujrat to Km. 76/400 (Sirohi on NH-62) on NH-168 in the State of Rajasthan ministry of road transport and highways•Pali•02-Aug-2025 | — | — | — | Accepted-Technical | View |
| L4 | Short Term Maintenance contract (STMC) Scheme work from km 0/0 to 8/0, 15/0 to 84/0, 98/0 to 102/0 and 130/0 to 148/0 on Swaroopganj to Kherwara section of NH-927A in the state of Rajasthan ministry of road transport and highways•Kotra, Udaipur•15-Aug-2025 | ₹3.29 Cr | ₹4.57 Cr | -27.97% | Admitted-Finance | View |