Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
GS
Government ContractorVerified Bidding RecordPublic Works

Gaurav Singh

Aggregated public procurement dossier compiling official financial evaluations, competitive bidding ranks (L1, L2, L3), and tender awards.

Historical Win Rate17 Wins
30.4%award ratio

17 awarded across 56 participated tenders

Primary Issuing Authorities:national highways authority of indiaarmoured vehicles nigam limited
Official Central e-Procurement Evaluation Data

Total Tenders Bidded

56

Evaluated bids submitted

Official L1 Wins

17

Lowest responsive bidder

Won Contracts Value

₹225.44 Cr

Cumulative awarded volume

Total Quoted Pipeline

₹410.86 Cr

Aggregated financial quotes

Competitive Position & Rank Distribution

Historical rank distribution across technical evaluations and financial openings

Average Margin vs Estimate: -29.43%
Bidding Outcome Proportion56 Total Evaluated Bids
L130.4%

17

Winning Bid

L28.9%

5

Runner Up

L37.1%

4

3rd Lowest

L4+7.1%

4

Higher Ranks

DQ1.8%

1

Disqualified

Profile Summary & Procurement Overview

Gaurav Singh is an active participant in public government e-procurement tenders. Across documented records, the contractor has placed financial quotes for 56 distinct tenders, achieving the lowest conforming bid position (L1) on 17 tenders with a historical win rate of 30.4%.

The contractor has executed or been awarded project works amounting to ₹225.44 Cr. In competitive bidding assessments, the firm has also finished as the secondary bidder (L2) in 5 tenders. Primary issuing authorities include national highways authority of india, armoured vehicles nigam limited.

Tender Bidding Archive & Historical Records

Evaluation records and financial bids submitted by Gaurav Singh

RankTender & AuthorityQuoted BidEstimated CostMarginOutcomeLink
L1Construction of 6-Lane Flyover at Km 417.374 and 6-Lane VUP at Km 416.700 including Service Roads on Jalandhar-Amritsar Section of NH-03 in the State of Punjab on EPC Mode. Execution of urgent remedial, Safety and Balance works at the Risk and Cost.
national highways authority of indiaPIU Amritsar04-Aug-2026
₹13.58 Cr₹14.42 Cr-5.79%Awarded (L1)View
Operation and Maintenance including Routine Maintenance and Incident Management of Four Lane of Ambala-Pehowa Balance Length Section of NH-152 From Km 3.700 to Km. 46.200 and Incident Management services (from km. 0.00 to km. 50.360) in the State of
national highways authority of indiaPIU Ambala14-Jul-2026
₹6.37 CrAdmitted-FinanceView
Construction of exit/entry at Ch.88.500 on RHS and at Ch.88.500 on RHS and increasing the height of existing PGR in between MCW and PR from Ch.87.590 to Ch.88.700 and Ch.91.900 to Ch.98.300 on Panipat Elevated Corridor from km.86 to km.96 on NH-44
national highways authority of indiaAmbala09-Mar-2023
₹3.09 CrAdmitted-Fee/PreQual/TechnicalView
L3Repair and Maintenance from km 126.270 to 197.200 of 4 laning of Bhiwani-Hansi-Barwala Section of NH-148B in the State of Haryana
national highways authority of indiaBhiwani09-Jun-2023
₹7.56 Cr₹10.35 Cr-26.99%
Awarded: Vmaks Constructions Private Limited
View
L1Overlay work on Yamunanagar Saha Panchkula section of NH-73 (New NH-344 ) from km. 115.400 to km. 157.192 (Package -2) in the State of Haryana
national highways authority of indiaChandigarh12-Jun-2023
₹16.71 Cr₹22.11 Cr-24.44%Awarded (L1)View
L2Operation and maintenance including Incident Management of Zirakpur to Patiala section of NH-64 (New NH-07) from km. 0.000 to km. 50.000 under NHDP-IV in the State of Punjab.
national highways authority of indiaPIU Chandigarh11-Oct-2023
₹4.69 Cr₹6.18 Cr-23.99%
Awarded: Vmaks Constructions Private Limited
View
L3Operation and Maintenance of four laning of Hisar to Dabwali Section of NH-10 (New NH 09) from km 170.000 to km 314.660 with paved shoulder in the State of Haryana
national highways authority of indiaPIU Hisar17-Nov-2023
₹4.48 Cr₹6.40 Cr-29.99%
Awarded: SHRI BALAJI CONSTRUCTIONS
View
L24 laning of Rohtak-Hisar section of NH-9 (Old NH-10) from Km. 87.000 to Km.170.000 including connection link from Km 87.000 (NH-10) to Km 348.000 (NH-71) in the State of Haryana. (Total length 98.810 Km).
national highways authority of indiaPIU Hisar20-Nov-2023
₹3.63 Cr₹5.95 Cr-39%
Awarded: Shanti Road And Construction
View
Incident Management service on Ambala to Kaithal section of old NH-65 (new NH-152) from Km 00.000 to Km 50.360 (Package-1) for the Period of 2 Years.
national highways authority of indiaPIU Ambala23-Nov-2023
₹1.48 CrAdmitted-FinanceView
Special repair of Bed Protection work of Major Bridge on Ghaggar River at Ch.175.854 on Yamunanagar-Panchkula section of old NH-73 (New NH-07) from Km.157.192 to km.176.400 on EPC mode under NHDP Phase-III in the State of Haryana (Package-3)
national highways authority of indiaPIU Chandigarh11-Dec-2023
₹13.61 CrAdmitted-Fee/PreQual/TechnicalView
Repair, Routine Maintenance and Incident Management service on Ambala to Kaithal section of old NH-65 (new NH-152) from Km 50.860 to Km 95.360 (Package-2) for the Period of 2 Years.
national highways authority of indiaPIU Ambala12-Dec-2023
₹8.36 CrAdmitted-FinanceView
Installation of View Cutters on Major Bridge on Ghaggar River from km. 175.700 to km 176.008 on Yamunanagar to Panchkula (Package-3) section of Old NH-73 (New NH- 07) in State of Haryana(2nd call)
national highways authority of indiaPanchkula15-Dec-2023
₹94.58 LAdmitted-FinanceView
Overlay work at Risk and Cost of Contractor on UP-Haryana Border -Yamunanagar-Saha - Panchkula Section of (Old NH-73) (New NH-344) from km. 71.400 to km. 115.400 (Package-1) in the State of Haryana
national highways authority of indiaPIU Chandigarh24-Jan-2024
₹13.21 CrAdmitted-Fee/PreQual/TechnicalView
Repair and Maintenance of Project Highway at Risk and Cost of Contractor for Four laning of Haryana-Punjab border to Jind Section of NH-71 (New NH-52-352) from km 238.695 to km 307.000 in the State of Haryana
national highways authority of indiaPIU Hisar25-Jan-2024
₹12.32 CrAdmitted-FinanceView
Operation and Maintenance including Routine Maintenance and Incident Management of Six Laning of Panipat-Mandi Gobindgarh Section of NH-1 From Km 96.000 to Km 272.000 in the State of Haryana and Punjab.
national highways authority of indiaPIU Ambala30-Jan-2024
₹36.47 CrAdmitted-FinanceView
Special repair of Bed Protection work of Major Bridge on Ghaggar River at Ch.175.854 On Yamunanagar-Panchkula section of old NH-73 (New NH-07) from Km. 157.192 to km.176.400 on EPC mode under NHDP Phase-III in the State of Haryana (Pkg-3) (2nd Call)
national highways authority of indiaPIU Chandigarh28-Feb-2024
₹14.03 CrAdmitted-FinanceView
Construction of 3 nos. of Ramp Type Foot Over Bridges at various locations on Six laning of Panipat-Khanna section of NH-44 (old NH-1) from Km.96.000 to Km. 272.000 in the State of Haryana and Punjab
national highways authority of indiaPIU Ambala29-Feb-2024
₹4.94 CrAdmitted-FinanceView
L2Balance Overlay work on Yamunanagar-Saha- Panchkula section of (New NH-344) from km. 115.400 to km. 157.192 (Package-2) in the State of Haryana
national highways authority of indiaPIU Chandigarh10-Jun-2024
₹8.97 Cr₹12.35 Cr-27.39%
Awarded: RAJINDER INFRASTRUCTURE PVT LTD
View
L1Overlay and Maintenance work on Ambala Kala Amb section of NH-72 from Km.29.000 to km. 34.000 and in km. 38.000 in the State of Haryana.
national highways authority of indiaPIU Chandigarh10-Jun-2024
₹3.03 Cr₹3.97 Cr-23.59%Awarded (L1)View
L1Construction of Footpath-cum Drain on the edge of service road and widening of Peripheral Road on Both sides between km 86.000 to km 96.000 of old NH-01 (New NH-44) in Panipat City in the State of Haryana.
national highways authority of indiaPIU Ambala28-Jun-2024
₹12.30 Cr₹17.47 Cr-29.59%Awarded (L1)View
L1Routine maintenance and Incident Management of UP-Haryana Border -Yamunanagar-Saha -Panchkula Section of NH-73 (New NH- 07) from km. 157.192 to km. 176.400 (Package-3) in the State of Haryana.
national highways authority of indiaPIU Chandigarh05-Jul-2024
₹2.73 Cr₹3.90 Cr-30%Awarded (L1)View
DQMaintenance work on UP-Haryana Border -Yamunanagar-Saha -Panchkula Section of (Old NH-73) (New NH-344) from km. 71.400 to km. 115.400 (Package-1) in the State of Haryana.
national highways authority of indiaPIU Chandigarh06-Jul-2024
₹10.48 Cr₹13.10 Cr-20%
Awarded: RAJINDER INFRASTRUCTURE PVT LTD
View
L1Six laning of Panipat- Khanna section of NH-44 from Km. 96.000 to Km. 272.000 in the state of Haryana and Punjab - Rectification of pavement surface along with other related works at various selected locations along NH-44.
national highways authority of indiaPIU Ambala07-Aug-2024
₹6.78 Cr₹11.17 Cr-39.29%Awarded (L1)View
L3Incident Management of UP/Haryana Border -Yamunanagar-Saha -Panchkula Section of NH-73 from km. 70.830 to km. 115.400 (Pkg-1) and from km. 115.400 to km. 157.192 (Pkg-2) for FY 24-25 in the State of Haryana.
national highways authority of indiaRO Chandigarh07-Aug-2024
₹1.88 Cr₹2.32 Cr-19%
Awarded: M/s ABS Construction Co.
View
Routine Maintenance and Incident Management of 4-laning of Punjab-Haryana Border-Jind Section of NH-71 from km 238.695 to km 307.000 (Design km. 238.725 to km. 307.000) in the State of Haryana (2nd Call)
national highways authority of indiaPIU Hisar09-Aug-2024
₹10.97 CrAdmitted-FinanceView
L1Operation and Maintenance, including Incident Management System for Lambra-Shahkot-Moga section of NH-703 in the State of Punjab from existing Km. 12.120 to 77.200 on Short Term Basis.
national highways authority of indiaPIU Jalandhar15-Oct-2024
₹83.18 L₹1.23 Cr-32.33%Awarded (L1)View
DQBalance Work and O and M of NH-354 (Old SH-25) of Section Ramdas to Gurdaspur (Pkg-V) from Design chainage Km.140.000 to Design Chainage Km.187.492 for length of 47.492 Km in the State of Punjab.
national highways authority of indiaPIU Amritsar04-Nov-2024
₹44.97 Cr₹70.85 Cr-36.53%
Awarded: Satish Aggarwal and Co.
View
L1Six laning of Panipat- Khanna section of NH-44 from Km. 96.000 to Km. 272.000 in the State of Haryana and Punjab - BC Overlay and other pavement related works on NH-44 on selected reaches.
national highways authority of indiaPIU Ambala25-Nov-2024
₹47.50 Cr₹77.60 Cr-38.79%Awarded (L1)View
Request for Pre-Qualification of Bidders (RFQ) - 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire ro Contractor in the state of Telangana.
national highways authority of indiaTelangana18-Oct-2025
Admitted-TechnicalView
DQOperation and Maintenance including Routine Maintenance and Incident Management of Four Laning of Ambala-Pehowa Balance Length Section of NH-152 from Km 0.000 to Km 3.700 and from Km. 46.200 to 95.360 in the State of Haryana for a Period of 1 Year
national highways authority of indiaPIU Ambala02-May-2025
₹5.37 Cr₹8.40 Cr-36%
Awarded: Vmaks Constructions Private Limited
View
Request for Pre-Qualification (RFQ) - 2025 for the maintenance works to be taken up on Risk and Cost of the Concessionaire/Contractor.
national highways authority of indiaRO Chandigarh14-Jun-2025
Admitted-TechnicalView
L2Routine maintenance and Incident Management Chandigarh - Kharar Section from (Km 0.000) to Kharar (km 10.185) of NH-21 and NH-95 and Kharar-Kurali section of (New NH-205) from Km. 16.200 to Km. 29.900 in the State of Punjab.
national highways authority of indiaRO Chandigarh06-Aug-2025
₹8.36 Cr₹14.07 Cr-40.59%
Awarded: Vmaks Constructions Private Limited
View
L14 Lane with PavedShoulder for Ambala-Saha Section from Km.0.000 to Km.14.800 of NH-444A intheState of Haryana Package1 Under Bharatmala Pariyojana on EPC Mode Undertaking rectification works at the riskandcost of the Contractor at various location
national highways authority of indiaPIU Ambala26-Sep-2025
₹15.06 Cr₹15.06 Cr-0.01%Awarded (L1)View
L1O and M of Patiala Sangrur section of NH-7 from Ch. 50.000 to Ch. 123.900 on short term bases including incident management services in the State of Punjab for the period of 1 year.
national highways authority of indiaPIU Chandigarh30-Sep-2025
₹9.89 Cr₹17.59 Cr-43.77%Awarded (L1)View
L1Operation and maintenance including incident management services for 4 Lane of Lambra-Shahkot-Moga Section of NH-703 from Km.12.120 - 77.200 in the state of Punjab.
national highways authority of indiaPIU Jalandhar10-Oct-2025
₹3.60 Cr₹6.27 Cr-42.57%Awarded (L1)View
L2Short Term Maintenance Contract of NH-354 2-Lane 4-Lane of Section Amarkot Town to Start of Amritsar Bypass from Chainage Km 34.293 (Amarkot) to Chainage Km 71.496 (Mannan) in the State of Punjab.
national highways authority of indiaPIU Amritsar13-Oct-2025
₹4.06 Cr₹6.86 Cr-40.79%
Awarded: SATISH AGGARWAL AND CO
View
Routine Maintenance including Incident Management of stretch of UP/Haryana Border -Yamunanagar -Panchkula section of NH-344 from Km. 124.000 to Km. 176.400 in the State of Haryana.
national highways authority of indiaPIU Chandigarh25-Oct-2025
₹7.27 Cr
Awarded: Vmaks Constructions Private Limited
View
Routine Maintenance including Incident Management of stretch of UP/Haryana Border -Yamunanagar -Panchkula section of NH-344 from Km. 71.400 to Km. 124.000 in the State of Haryana.
national highways authority of indiaRO Chandigarh25-Oct-2025
₹8.29 Cr
Awarded: Vmaks Constructions Private Limited
View
Short Term Maintenance Contract STMC of Amritsar-Ghoman-Tanda Section of NH-503A (Total Length 42.1 KM) in District Gurdaspur and Hoshiarpur in the State of Punjab.
national highways authority of indiaPIU Amritsar06-Nov-2025
₹13.01 Cr
Awarded: Jagson Constructions Limited
View
L1Operation and Maintenance including Routine Maintenance and Incident Management of 2-Lane with Paved shoulder for Jind-Karnal of NH 709 A from existing Km 82.227 and ends at Km. 154.219 of NH 709 A in the State of Haryana under NH(O) (Pkg-II).
national highways authority of indiaPIU Bhiwani11-Nov-2025
₹10.74 Cr₹18.45 Cr-41.79%Awarded (L1)View
Operation and maintenance including Incident Management of Zirakpur to Patiala of NH-64 (New NH-07) from km. 0.000 to km. 50.000 under NHDP-IV in the State of Punjab.
national highways authority of indiaPIU Chandigarh03-Dec-2025
₹19.10 CrAdmitted-FinanceView
DQUpgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
national highways authority of indiaNHAI HQ08-Dec-2025
₹64.90 Cr₹96.18 Cr-32.52%
Awarded: VRC Constructions (India) Limited
View
L1Strengthening - Bituminous Overlay work and Routine Maintenance including Incident Management of Khanouri-Arno Road NH-152A (Total length-12.220 km) starting from its junction with NH-52 near Shergarh, Amo upto Punjab.
national highways authority of indiaChandigarh15-Jan-2026
₹12.76 Cr₹18.63 Cr-31.52%Awarded (L1)View
L3Strengthening/Bituminous Overlaywork and RoutineMaintenance including Incident Management ofsection starting from its junction with NH-148B near Jakhal connecting Lehra Gaga and terminating at Sunam on NH-148BB (TotalLength38 Km) in State of Punjab.
national highways authority of indiaPIU Chandigarh20-Jan-2026
₹16.03 Cr₹24.50 Cr-34.59%
Awarded: NKC CONSTRUCTIONS PRIVATE LIMITED
View
L1Routine Maintenance (including overlay on the required staggered stretches) and Incident Management of 2 Lane plus PS configured Bhiwani-Jind Section of NH-709A from Km 6.875 to Km 68.857 for 1 Year.
national highways authority of indiaPIU Bhiwani21-Jan-2026
₹6.81 Cr₹10.26 Cr-33.59%Awarded (L1)View
Short term Maintenance of Jhansi-Orai Section of NH-27 from Km. 1380.300 to Km. 1515.713 (Length 135.413 Km.) in the State of Uttar Pradesh on Item Rate (percentage) Basis
national highways authority of indiaLUCKNOW23-Jan-2026
₹40.54 CrAccepted-TechnicalView
Protection works and restoration of flood damaged stretches including Incident Management work from Ch.30.515 to 45.880 of Jagadhri-Poanta Sahib Road (NH-907) in the State of Haryana.
national highways authority of indiaPIU Chandigarh02-Feb-2026
₹23.97 CrAdmitted-FinanceView
L1Protection Work at CH-58.700 (LHS) and from CH-58.800 to CH-58.850 (LHS) on Zirakpur-Parwanoo Section of NH-5 (Old NH-22) from KM 39.960 to KM 67.550 on BOT Basis in the States of Punjab, Haryana and Himachal Pradesh.
national highways authority of indiaPIU Chandigarh03-Feb-2026
₹81.11 L₹85.38 L-5%Awarded (L1)View
L1Six Laning of Panipat-Jalandhar Section of NH-1 (New NH-44) from Km272.000 to Km352.730 in the StateofPunjab - Reconstruction of Service RoadsandJunctions with Rigid Pavement at Various Locations and Installation of Paver Blocks in Separator Portion
national highways authority of indiaPIU Ludhiana06-Feb-2026
₹53.84 Cr₹68.84 Cr-21.79%Awarded (L1)View
L1Routine Maintenance along with Providing Highway lights, fixing additional Road Safety items and Incident Management of NH-709A from Km 00.000 to 14.450 (Karnal- Meerut Section from Devilal Chowk to UP Border) in the Haryana State
national highways authority of indiaPIU Bhiwani19-Mar-2026
₹8.50 Cr₹12.46 Cr-31.79%Awarded (L1)View
Strnengthening maintenance of Pinjore Baddi Nalagarh section of vh 4200 to 35 395 of NH105 in the state of Haryana and Himachal Pradesh
national highways authority of indiaRO-Shimla01-Apr-2026
₹13.90 CrAccepted-TechnicalView
Operation and Maintenance of NH 148A from junction of NH 48 (Gurugram) to Delhi/Haryana Border on item rate (percentage) basis
national highways authority of indiaNHAI HQ15-Apr-2026
₹20.43 CrAdmitted-FinanceView
Request for Pre-Qualification (RFQ) 2026 for the maintenance works to be taken up on Risk and Cost of the Concessionaire-Contractor under jurisdiction of RO-Delhi
national highways authority of indiaNHAI HQ13-May-2026
Admitted-TechnicalView
Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1) Rectification works at the risk and cost of the Contractor at various locations.
national highways authority of indiaPIU Ambala22-May-2026
₹12.89 CrAdmitted-FinanceView
DQSPECIAL REPAIRS TO THE PROPOSED FSC IN 601 EME BATTALION PATIALA
armoured vehicles nigam limited601 EME Battalion Patiala04-Dec-2025
₹92.04 L
Awarded: NARENDER KUMAR CONTRACTOR
View
Maintenance Works to Be Taken Up on Risk and Cost of the Concessionaire Contractor
national highways authority of indiaMumbai13-Jul-2026
Admitted-Fee/PreQual/Technical/FinanceView

Frequently Asked Questions

How many government tenders has Gaurav Singh participated in?

According to public e-procurement data records, Gaurav Singh has participated in 56 government infrastructure and procurement tenders across central and state authorities.

How many tenders has Gaurav Singh won as lowest bidder (L1)?

Gaurav Singh has secured 17 tenders as the official lowest bidder (L1) or awardee, achieving an overall win rate of 30.4%.

What is the total value of government contracts awarded to Gaurav Singh?

The cumulative value of project contracts awarded to Gaurav Singh is approximately ₹225.44 Cr, across agencies such as national highways authority of india, armoured vehicles nigam limited.

Explore more public procurement intelligence and infrastructure data: