| L16 | Strengthening of NH-709 (Extn.) from Km.87.00 to Km.89.980 and from Km.90.824 to 99.000. ministry of road transport and highways•Rohtak•06-Jun-2023 | ₹22.32 Cr | ₹28.08 Cr | -20.51% | Admitted-Finance | View |
| — | Construction of Barpeta By Pass of NH-427 from KM 77.900 to KM 86.150 (Deurikuchi) under Rangia NH Division in the state of Assam (Length 8.250 km.Approx) (JOB NO. 427/AS/2022-23/245). ministry of road transport and highways•Barpeta•12-Jul-2023 | — | — | — | Accepted-Technical | View |
| L1 | Development of 4 lane with paved shoulders for the road section Talwandi Sabo-Raman to Refinery Road Junction with Bathinda-Dabwali road of NH-254 from existing Km 131.600 to 155.650 (Design Km 131.600 to Km 152.600) in the State of Punjab under EPC ministry of road transport and highways•Talwandi Sabo-Raman to Refinery Road Junction•18-Jul-2023 | ₹209.00 Cr | ₹227.84 Cr | -8.27% | Awarded (L1) | View |
| L4 | Construction of four lane with paved shoulder of Darbhanga (Dilli More) - Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the state of Bihar ministry of road transport and highways•NH 527B from ch. 0.00 to ch. 14.95•01-Aug-2023 | ₹228.51 Cr | ₹285.69 Cr | -20.02% | Admitted-Finance | View |
| L4 | For Construction of 4 Lane ROB and its approaches at the level crossing LC No 29 B of Km 29 Ekangarsarai at NH110 New NH 33 and Railway Km 32.63 of Fatwa FUT Islampur IPR section with Utility Shifting in the state of Bihar on EPC mode. ministry of road transport and highways•Km 29 Ekangarsarai at NH110 New NH 33•24-Aug-2023 | ₹90.51 Cr | ₹109.87 Cr | -17.62% | Admitted-Finance | View |
| L5 | Rehabilitation and Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 and km.35.400toKm.52.345(Design len.-24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to Bihar Border and Bihar Border to Majhauli)on EPC mode in the State of UP ministry of road transport and highways•DEORIA•15-Sep-2023 | ₹233.00 Cr | ₹338.99 Cr | -31.27% | Admitted-Finance | View |
| DQ | Widening from 2L to 2L with PS from km 21.000 to km 84.274 (Length 63.274) of New NH 106 along with resurfacing of existing bituminous surface and other miscellaneous works in the State of Meghalaya ministry of road transport and highways•NH 44E•12-Jun-2024 | — | ₹141.78 Cr | — | Rejected-Technical | View |
| DQ | Construction of 4 Lane PS from Km 140.200 to 167.326 Chikkodi Gotur section including Chikkodi Bypass on NH 548B in the State of Karnataka on Hybrid Annuity Mode HAM under NHO Annual Plan 2023 24 ministry of road transport and highways•Chikkodi Gotur section•26-Jun-2024 | — | ₹541.56 Cr | — | Rejected-Technical | View |
| L1 | Construction of additional major Bridge with 4-lane configuration of length 1.48 km on NH-60 (NH-14) over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4-lane configuration of length 0.900 km on NH-60 (NH-14) over ministry of road transport and highways•Paschim Medinipur•26-Jun-2024 | ₹158.25 Cr | ₹210.81 Cr | -24.93% | Awarded (L1) | View |
| L3 | Construction of 4-lane Gauripur Bypass starting from Km. 852.560 of NH-31 and Terminating at Km. 862.170 via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari PtIII and meeting at Km 862.170 of NH-17(New)/NH-31(Old) in Assam under EPC Mode ministry of road transport and highways•New Delhi•04-Jul-2024 | ₹216.32 Cr | ₹318.23 Cr | -32.02% | Admitted-Finance | View |
| L3 | Job No. 715K/AS/2023-24/256 ministry of road transport and highways•Jorhat•05-Jul-2024 | ₹207.00 Cr | ₹293.70 Cr | -29.52% | Awarded: BRN INFRASTRUCTURES PRIVATE LIMITED | View |
| — | Construction of 2 Lane ROB over L.C. No 2 between Muktapur and Kishanpur station on Samastipur Darbhanga Road (NH 322) in Samastipur district in the state of Bihar on EPC mode. ministry of road transport and highways•Samastipur Darbhanga Road (NH 322)•20-Aug-2024 | — | ₹61.68 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 0.000 to Km 60.250 (package-1) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹822.35 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 160.75 to km 209.90 (Package-5) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹821.55 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 113.00 to km 167.75 (Package-4) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹802.27 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 70.000 to km 113.000 (Package-3) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹793.89 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 34.700 to km 70.000 (Package-2) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹564.95 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 85.60 to km 126.15 (Package-5) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹558.58 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 35.000 to km 78.380 (Package-2) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹528.81 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹512.78 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 87.13 to Km 121.541 (package-3) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹477.49 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 0.00 to km 28.50 (Package-1) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹476.22 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from Km 0.000 to Km 27.430 of Bile to Migging stretch (Ch.0.0 at Bile) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹445.85 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 0.000 to km 35.000 (Package-1) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹358.11 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 16.820 to km 43.650 (Package-2) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹337.23 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L1 | Perma recti of 4blackspots on NH27 of Kotwa Mehsi Muzaffarpur Sec 440.00 to 520.00 4blackspots on NH27 of Muzaffarpur Darbhanga Purnia sec 0.00 to 148.550 n 159.357 to 287.860 n Removal of 1 atgrade Jn near Satanpur Jn in Satanpur NH122 in BH on EPC national highways authority of india•NHAI HQ•12-Jan-2024 | ₹236.25 Cr | ₹295.29 Cr | -19.99% | Awarded (L1) | View |
| DQ | Strengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis. national highways authority of india•Sonipat•24-Jun-2021 | — | — | — | Awarded: SHIVALAYA CONSTRUCTION CO PVT LTD | View |
| — | Construction of 2 lane flyovers at the junction of NH-28 and NH-28B at Kushinagar (Ch. 322.200) and at the junction of NH-28 and state MDR at Gopalgarh Tiraha (Ch. 325.750) on Gorakhpur-Kasya Section of NH-28 in the state of Uttar Pradesh on NH-27 national highways authority of india•work•08-Jul-2021 | — | — | — | Accepted-Technical | View |
| — | Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC Basis national highways authority of india•NHAI HQ•14-Aug-2021 | — | ₹356.02 Cr | — | Admitted-Finance | View |
| — | 2 lane with paved shoulder of Najibabad Kotdwar section of NH 119 from Design Ch. 122.200 to 137.760 Existing Ch. 138.635 in the state of Uttar Pradesh. national highways authority of india•NHAI HQ•05-Oct-2021 | — | ₹81.44 Cr | — | Admitted-Finance | View |
| DQ | Construction of 6Lane ROB at Km. 314.630 over Existing NH24 of Bareilly Sitapur section on EPC basis in the state of Uttar Pradesh for proposed private railway siding of KFL national highways authority of india•NHAI HQ•08-Oct-2021 | — | ₹51.56 Cr | — | Rejected-Technical | View |
| — | Construction of Major Bridge at Km 12.865 on Shillong bypass connecting NH-40 and NH-44 in the State of Meghalaya on EPC Mode national highways authority of india•NHAI HQ•04-Jan-2022 | — | ₹9.79 Cr | — | Admitted-Finance | View |
| DQ | Construction of Six Lane Standalone Flyovers at Bongaigaon Chapaguri Pathsala Simalguri Chowk and Baihata Bypass Junctions on stretches of NH 31 and NH 31C (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis national highways authority of india•NHAI HQ•07-Apr-2022 | — | ₹372.88 Cr | — | Rejected-Technical | View |
| — | Construction of Six Lane Standalone Flyovers at Raha Demow Borghat Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 37 (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis national highways authority of india•NHAI HQ•07-Apr-2022 | — | ₹206.49 Cr | — | Admitted-Finance | View |
| L1 | Construction of Long Term Measures for 3 Nos. of Black Spots Locations at Sundari, Kishanbazar and Manikpur in the state of Assam on EPC basis. national highways authority of india•NHAI RO GHY•25-May-2022 | ₹65.05 Cr | ₹78.61 Cr | -17.25% | Awarded (L1) | View |
| L2 | Construction of flyover at km 233.110 on Dogal Kalan to Punjab-Haryana Border Section on NH-71 (new NH-52) in the State of Punjab on EPC Mode national highways authority of india•PATIALA•08-Jun-2022 | ₹16.84 Cr | ₹19.70 Cr | -14.52% | Awarded: Vijay Kumar Contractor | View |
| — | Rehabilitation and Upgradation of Chorma Bairgania section of NH No. 227F to 2 lane with paved shoulders from Design Ch 0.000 to Ch 34.566 in the state of Bihar through Hybrid annuity mode (HAM) Basis national highways authority of india•NHAI HQ•30-Jul-2022 | — | ₹353.09 Cr | — | Admitted-Finance | View |
| L1 | Construction of Long Term Measures for 4 Nos. of Black spots at Tihu, Society Chowk, Changsari Madanpur and Daboka under RO Guwahati in the State of Assam on EPC basis national highways authority of india•NHAI RO GHY•12-Aug-2022 | ₹57.94 Cr | ₹68.16 Cr | -15% | Awarded (L1) | View |
| — | Rehabilitation work for Damaged road sections AS27 KM 40.000 to KM 60.500 , AS25 KM 83.400 to KM 111.000, AS24 KM 111.000 to KM 126.450 and AS23 KM 126.450 to 140.700 in the State of Assam national highways authority of india•NHAI RO GHY•07-Sep-2022 | — | ₹105.51 Cr | — | Admitted-Finance | View |
| — | Cons. of2 Lane with paved Shoulder of Selected Rd. stretches from Bakaur to Parsarma Sec-1( 13.300 to 18.875)NH-527A Parsarma to Bariyahi Sec-2(0 to 24.068)NH-327E Bangaon Bypass Sec-3(0 to 3.820)Mahishi Spur Rd. Sec-4(0 to 5.720)BMP Ph-I in Bihar national highways authority of india•NHAI HQ•14-Oct-2022 | — | ₹484.54 Cr | — | Admitted-Finance | View |
| — | Construction of new 4lane Prayagraj Southern Greenfield Bypass from km. 50.860 (Nababa urf Nibi Kala Uparhar) to km. 64.763 on NH19 (near Khodaypur Kasgaon) including Interchange loop at NH19 (design length 14.980 km) Pkg3 PhI in UP on EPC under BMP national highways authority of india•NHAI HQ•21-Dec-2022 | — | ₹600.62 Cr | — | Admitted-Finance | View |
| — | Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode national highways authority of india•NHAI HQ•10-Mar-2023 | — | ₹124.18 Cr | — | Admitted-Finance | View |
| — | Construction of VUP at Tajpur Junction (Existing chainage 565.550), Mushrigharari Junction (Existing Chainage 574.550 and Dalsingh Sarai Junction (At Existing Chainage 539.660) on EPC Mode in the State of Bihar. national highways authority of india•NHAI, RO - Patna•22-May-2023 | — | ₹114.58 Cr | — | Admitted-Finance | View |
| — | Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC national highways authority of india•NHAI HQ•13-Jun-2023 | — | ₹485.06 Cr | — | Admitted-Finance | View |
| — | 4L of NH530B from Chandan Nagar(Existing Km96.200 of NH530B Design Km.179.500) to Bareilly Bypass(End)(Existing Km267.000 of NH30 Design Km227.680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4) national highways authority of india•NHAI HQ•15-Jun-2023 | — | ₹1203.55 Cr | — | Admitted-Finance | View |
| DQ | Operation and Maintenance work from Km. 162.620 to Km. 278.685 NH 37 (New NH 27) in the state of Assam national highways authority of india•NHAI RO GHY•04-Jul-2023 | — | ₹17.68 Cr | — | Rejected-Technical | View |
| — | Four Laning of NH-146 from Design Chainage km 59.475 (Existing Chainage km 81.240 near Vidisha) to Design Chainage km 88.600 (Existing Chainage km 110.315 near Gyaraspur) in Madhya Pradesh on HAM under BMP national highways authority of india•NHAI HQ•05-Oct-2023 | — | ₹468.20 Cr | — | Admitted-Finance | View |
| — | Construction work of 4-lane Highway from km 0.000 to 42.040 Bhopal (Ratnaigiri Tiraha) to Vidisha (Morikodi) of NH 146 under BMP in Madhya Pradesh on HAM (HAM) Mode. national highways authority of india•NHAI HQ•05-Oct-2023 | — | ₹942.48 Cr | — | Admitted-Finance | View |
| — | Const of 4Lane CG/JH Border Gumla Bharda sec of NH43 from design ch.0.000 (Vill. Katkaiya) to design ch. 32.370 (Vill. Bharda) in the State of Jharkhand on HAM under Bharatmala Pariyojana national highways authority of india•NHAI HQ•11-Oct-2023 | — | ₹948.31 Cr | — | Admitted-Finance | View |
| — | Construction of New Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500 on NH-527C in the State of Bihar on EPC Mode national highways authority of india•NHAI HQ•01-Nov-2023 | — | ₹365.28 Cr | — | Admitted-Finance | View |
| — | Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•15-Dec-2023 | — | ₹613.62 Cr | — | Admitted-Finance | View |
| — | Construction of 4L from Amjhar Road to Barela (Jabalpur Ring Road Pkg 5) from design km 98.950 (Near Amjhar) to km 113.925 and km 0.000 to Km 2.900 (Near Barela) (Total design Length 17.875 km) under NH(O) in Madhya Pradesh on HAM national highways authority of india•NHAI HQ•15-Dec-2023 | — | ₹442.57 Cr | — | Admitted-Finance | View |
| — | Const of 2Lane GF Bypasses in Lalganj Ajhara Mohanganj and Raniganj on Raebareli Jaunpur Sec of NH31 in the State of Uttar Pradesh on HAM. national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹566.45 Cr | — | Admitted-Finance | View |
| — | 4 laning of Agra-Aligarh Sec from Km. 28.000(Near Asroi vill in Hathras)to Km.64.900 (Junc with Yamuna Expressway) in Uttar Pradesh on HAM mode under NH(O) Scheme (PKG-II) national highways authority of india•NHAI HQ•28-Dec-2023 | — | ₹656.21 Cr | — | Admitted-Finance | View |
| L1 | Additional works to ensure Road Safety for 6-Lane Bengaluru-Mysuru Access Controlled section of NH-275 in Karnataka on Hybrid Annuity Mode (HAM) under NH (O) national highways authority of india•NHAI HQ•06-Jan-2024 | ₹293.00 Cr | ₹688.11 Cr | -57.42% | Awarded (L1) | View |
| — | Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47.723 to Km 54.405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar. national highways authority of india•NHAI HQ•06-Jan-2024 | — | ₹180.30 Cr | — | Admitted-Finance | View |
| — | Construction of 4lane Greenfield Northern Patiala Bypass starting from Km. 274.115 of NH7 near village Wazidpur and terminating at Km. 300.465 of NH7 near village Chamarheri (Total length 27.350 Kms) in Punjab under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•07-Mar-2024 | — | ₹764.43 Cr | — | Admitted-Finance | View |
| DQ | Milling and BC overlay of Zirakpur to Sangrur section of NH-64 (New NH-07) from Km. 0.000 to Km. 123.900 in the State of Punjab. national highways authority of india•PIU Chandigarh•06-Jun-2024 | ₹22.24 Cr | ₹30.72 Cr | -27.62% | Awarded: Varinder Kumar Contractor | View |
| L3 | Balance Overlay work on Yamunanagar-Saha- Panchkula section of (New NH-344) from km. 115.400 to km. 157.192 (Package-2) in the State of Haryana national highways authority of india•PIU Chandigarh•10-Jun-2024 | ₹9.20 Cr | ₹12.35 Cr | -25.56% | Awarded: RAJINDER INFRASTRUCTURE PVT LTD | View |
| L1 | Overlay and Maintenance work on Ambala Kala Amb section of NH-72 from Km.29.000 to km. 34.000 and in km. 38.000 in the State of Haryana. national highways authority of india•PIU Chandigarh•10-Jun-2024 | ₹2.99 Cr | ₹3.97 Cr | -24.56% | Awarded (L1) | View |
| — | Construction of Elephant Underpass (from km. 153.853 to km 153.953) Flyover (from km 137.966 to km 138.034) 2 no. Box Culverts (km 153.679 and km 137.761) and other road safety works in Kharagpur Chichra section of NH-06 in West Bengal on EPC Mode national highways authority of india•NHAI HQ•27-Jun-2024 | — | ₹119.12 Cr | — | Admitted-Finance | View |
| — | Four laning of Gyaraspur- Rahatgarh section of NH-146 from Design chainage km. 88.361 to Design chainage at km. 124.470 in the state of Madhya Pradesh on HAM mode. national highways authority of india•NHAI HQ•10-Jul-2024 | — | ₹470.98 Cr | — | Admitted-Finance | View |
| — | Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design. Ch. Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call) national highways authority of india•NHAI HQ•16-Jul-2024 | — | ₹1049.57 Cr | — | Admitted-Finance | View |
| DQ | Construction of Additional Structures Improvement of Service Road and Maintenance of Six Lane Gurgaon-Jaipur Section of NH48 (old NH-8) between km 42.700 to km 107.100 in the States of Haryana on EPC Mode. national highways authority of india•DELHI•23-Jul-2024 | ₹300.00 Cr | ₹322.68 Cr | -7.03% | Awarded: WINNER CONSTRUCTIONS PVT LTD | View |
| — | CONSTRUCTION OF 4LANING OF KISHANGANJ-BAHADURGANJ SECTION AS A SPUR CONNECTIVITY NH-27 AND NH-327E UTTAR RAMPUR (0.0) AND TERMINATING AT NH-327E NEAR VILLAGE SATAL ISTMARAR BAHADURGANJ (23.649) AND INTERCHANGE AT START POINT IN BIHAR ON HAM (2nd call national highways authority of india•NHAI HQ•23-Jul-2024 | — | ₹788.12 Cr | — | Admitted-Finance | View |
| — | Const of 4/6 Lane Highway of Southern Bareilly Bypass (L29.920km)starting at Ch.237.000 of NH 530 near Jhumka chauraha Dhantiya vill and ending at Ch267.000 of NH 30 near Invertis University inc Trumpet Interchange on HAM basis in the Uttar Pradesh national highways authority of india•NHAI HQ•31-Jul-2024 | — | ₹937.20 Cr | — | Admitted-Finance | View |
| — | Constr. of 6lane elevated flyover inclu. reconst rehab of exist pavement from Km 426.230 to Km 430.500 at Nirsa in the Barwa Adda Panagarh sec of NH19 Km.398.240 to Km.521.120 inclu Panagarh Bypass in Jharkhand on EPC Mode under NH(O) national highways authority of india•NHAI HQ•06-Aug-2024 | — | ₹341.65 Cr | — | Admitted-Finance | View |
| — | Construction of 6lane elevated flyover inclu reconst. rehab of exist pavement Km 406.100 to Km 411.150 at Gobindpur area in the Barwa Adda Panagarh sec of NH19 from Km.398.240 to Km.521.120 inclu Panagarh Bypass in the State of Jharkhand on EPC Mode national highways authority of india•NHAI HQ•06-Aug-2024 | — | ₹499.01 Cr | — | Admitted-Finance | View |
| DQ | Slope stability and protection work of 7 nos. of vulnerable location along the Jowai-Ratacherra section of NH-6 in the state of Meghalaya on item rate (percentage) basis national highways authority of india•NHAI RO GHY•19-Aug-2024 | ₹80.00 Cr | ₹76.19 Cr | +5% | Rejected-Finance | View |
| — | Construction of Grade separators along with Service Roads at Four lane VOPs at Veerasandra Junction at Chainages 19.395 n 19.465 KA02115 2.Four lane VOP at Old Chandapura at Chainage 25.180 KA0335 3.Four lane VOP at Guddahatti gate Jain Temple at Cha national highways authority of india•Bangalore to Hosur section•20-Aug-2024 | — | ₹159.55 Cr | — | Admitted-Finance | View |
| — | Construction of Service Road , Drain, Pedestrian Guard Rail at Various locations in the stretch from Muzaffarpur -Darbhanga - Purnea (Km. 0.000 to 287.00) in the state of Bihar. national highways authority of india•NHAI, RO - Patna•29-Aug-2024 | — | ₹15.03 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of Balance New Service Road MNB Culverts Drain VUP-LVUP-SVUP and its work Km 656.000-Km725.185 of Rewa Katni Jabalpur section (P-1) and from Km 725.185-Km774.068 and Km793.065-Km813.257 (P-2) of NH-30 in the State of MP on EPC Mode national highways authority of india•NHAI HQ•08-Oct-2024 | — | ₹120.69 Cr | — | Admitted-Finance | View |
| — | Constr. of Additional Structures of 12 Nos Grade Separator VUP LVUP CUP on Rajasthan Border Fatehpur Salasar Sec of NH-52 and NH-58 on EPC Mode in the State of Rajasthan national highways authority of india•NHAI HQ•17-Oct-2024 | — | ₹183.82 Cr | — | Admitted-Finance | View |
| — | Improvement of riding quality and routine maintenance with other ancillary work, safety work etc. of existing Gwalior Shivpuri Section of NH 46 from Km 00.000 to Km 125.380 (Excluding 100.757 to 107.350) in state of MP national highways authority of india•NHAI RO Bhopal•21-Oct-2024 | — | ₹209.01 Cr | — | Accepted-Technical | View |
| L2 | Additional work i.e. Illumination, railings, Bus Bay etc along Guwahati Bypass national highways authority of india•NHAI RO GHY•08-Nov-2024 | ₹11.67 Cr | ₹14.77 Cr | -21% | Rejected-Finance | View |
| — | Rectification of 13 Nos Blackspots Accident spots under Annual Road Safety plan for 2024-2025 in the stretch of Walayar Vadakancherry and Thrissur Angamaly Sec of NH544 in Kerala on EPC mode national highways authority of india•NHAI HQ•26-Dec-2024 | — | ₹702.65 Cr | — | Admitted-Finance | View |
| — | Rehabilitation of distressed portion of RE wall from Km.368.753 to Km.368.908 (near Karmaini) on UP Border to Devapur (WB-09) section of NH-27 (East West Corridor) in Gopalganj district in the state of Bihar (2nd Call). national highways authority of india•NHAI, RO - Patna•01-Jan-2025 | — | ₹6.68 Cr | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Strengthening and Major Maintenance of the Rohtak Hisar Sec of NH09 From Km. 93.140 to 182.500 and Link road 09.450 Km total length 98.810 Km in Haryana on PBMC mode national highways authority of india•NHAI HQ•22-Jan-2025 | — | ₹174.11 Cr | — | Rejected-Technical | View |
| DQ | Widening n Strengthening of 2Lane with Paved Shoulder Myajlar Jaisalmer with Jaisalmer Bypass Link Road Sec of NH11 Part of BM7 and Sundra Myajlar Ambasingh ki Dhani Road part of Munabao Tanot project NH70 Portion of BM4 in Rajasthan under NH(O)HAM. national highways authority of india•NHAI HQ•28-Jan-2025 | ₹1060.00 Cr | ₹842.80 Cr | +25.77% | Awarded: VRC Constructions (India) Limited | View |
| — | Construction of 6 nos. of FOB at Km.34.500 (Badalpur), Km.42.800 (Dadri), Km.50.050 (Sikandrabad Industrial Area), Km.53.540 (Sikandrabad), Km.68.130 (Bulandshahr Dehat) and Km.83.100 (Khurja Dehat) on Ghaziabad Aligarh NH-34 in UP on EPC mode national highways authority of india•LUCKNOW•31-Jan-2025 | — | ₹21.49 Cr | — | Admitted-Finance | View |
| L1 | Rehabilitation of distressed portion of RE wall from Km.368.753 to Km.368.908 (near Karmaini) on UP Border to Devapur (WB-09) section of NH-27 (East West Corridor) in Gopalganj district in the state of Bihar (3rd Call). national highways authority of india•NHAI, RO - Patna•13-Feb-2025 | ₹7.02 Cr | ₹6.68 Cr | +5% | Awarded (L1) | View |
| L1 | Securing of ROW for four lane Greenfield Expressway for Connection of Amritsar with Delhi Amritsar Katra Expressway from km 40.900 to km 70.950 of NE 5A in the state of Punjab Amritsar Spur II national highways authority of india•PIU Amritsar•12-Mar-2025 | ₹2.89 Cr | ₹5.50 Cr | -47.48% | Awarded (L1) | View |
| L1 | Securing of ROW for Construction of four lane of existing two lane road from Amritsar to Tanda via Mehta and Sri hargobindpur NH 503A from km 42.950 to km 85.5 in the district of Hoshiarpur in the state of Punjab Package II national highways authority of india•PIU Amritsar•21-Mar-2025 | ₹2.56 Cr | ₹2.77 Cr | -7.41% | Awarded (L1) | View |
| — | Securing of ROW for Four/six lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE5 near to Manewal to junction with NH 205 near Bheora Village in the State of Punjab on HAM,Pkg 2 Ch 37.7 to Ch 66.7 and Spur from km 0.0 to km 18.5 national highways authority of india•Chandigarh•06-May-2025 | — | ₹6.98 Cr | — | Admitted-Finance | View |
| — | RECTIFICATION OF 03 NO. OF BLACKSPOTS ON JAIPUR-REENGUS-SIKAR SECTION OF NH-52 IN THE STATE OF RAJASTHAN on EPC Mode national highways authority of india•NHAI RO JAIPUR•20-Jun-2025 | — | ₹100.41 Cr | — | Admitted-Finance | View |
| — | CS of 2L VUP at Mukundpur junc 4L VUP at Lahra Mod junc 4L VUP at Eglas Chauraha junc 4L VUP at Kota Kapura junc 4lane VUP at Poiya junc and 4L of Malupur Tiraha as part of Rectification of MORTH identified BS in UP on EPC Mode national highways authority of india•NHAI HQ•23-Jun-2025 | — | ₹166.99 Cr | — | Admitted-Finance | View |
| — | Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.350 (Total Length- 900m) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km.206.050 to 266.282 national highways authority of india•NHAI, RO- Patna•21-Aug-2025 | — | ₹47.51 Cr | — | Admitted-Finance | View |
| DQ | Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode national highways authority of india•NHAI HQ•26-Sep-2025 | — | ₹548.14 Cr | — | Rejected-Technical | View |
| — | Cutting and taking away the salvage in the form of Timber and Fire wood of trees from 17 Nos Blackspots/Accident spots in the stretch of Walayar-Angamali Section of NH-544 Under PIU-Palakkad in the State of Kerala-3rd Call national highways authority of india•PALAKKAD•03-Jan-2026 | — | ₹57.18 L | — | Admitted-Finance | View |
| L2 | Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.59km to 2 Lane with paved shoulder configuration along with one time improvement in 5.88 km length in the State of Madhya Pradesh on EPC Mode ministry of road transport and highways•Ambua to Gujrat Border•17-Jan-2025 | ₹163.52 Cr | ₹255.50 Cr | -36% | Admitted-Finance | View |
| L9 | Construction of 2 Lane ROB over L.C. No 2 between Muktapur and Kishanpur station on Samastipur Darbhanga Road NH 322 in Samastipur district in the state of Bihar. ministry of road transport and highways•MUKTAPUR SAMASTIPUR•28-Jan-2025 | ₹57.45 Cr | ₹61.98 Cr | -7.31% | Admitted-Finance | View |
| L1 | Construction of VUP for rectification of blackspots at location km 299 plus 520 Mansa Kenchian Chowk ID PB 03 170 of series 2017 to 19 and km 304 plus 520 Bhaini Bagha Chowk ID PB 03 173 of series 2017 to 19 on NH 148B in the State of Punjab ministry of road transport and highways•BATHINDA•12-Mar-2025 | ₹46.58 Cr | ₹49.03 Cr | -5% | Awarded (L1) | View |
| L3 | Construction of road from km 70.000 to km 113.000 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹508.64 Cr | ₹793.89 Cr | -35.93% | Awarded: Gawar Construction Limited | View |
| L2 | Construction of road from km 0.000 to km 43.65 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹401.71 Cr | ₹594.32 Cr | -32.41% | Admitted-Finance | View |
| L4 | Construction of road from km 43.65 to km 85.60 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹354.94 Cr | ₹532.25 Cr | -33.31% | Admitted-Finance | View |
| DQ | Construction of road from km 87.130 to km 121.541 of Taliha-Tato section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹334.42 Cr | ₹477.49 Cr | -29.96% | Awarded: M/S R and C INFRAENGINEERS PVT LTD | View |
| L4 | Construction of road from km 17.812 to km 55.377 (Package-2) of Bile- Migging section (km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹317.93 Cr | ₹512.78 Cr | -38% | Admitted-Finance | View |
| L2 | Widening to 2 Lane with Paved Shoulder of Raipur-Jassakhera section (Km 0.000 to Km 29.770) of NH-458 on EPC mode in the State of Rajasthan ministry of road transport and highways•New Delhi•18-Jul-2025 | ₹416.73 Cr | ₹484.57 Cr | -14% | Admitted-Finance | View |
| L6 | Construction of four lane with paved shoulder of Darbhanga Dilli More Banwari Patti from km 0.000 to km 14.950 Package 1 of NH 105 New NH 527B in the state of Bihar. ministry of road transport and highways•As per NIT/RFP•01-Sep-2025 | ₹239.92 Cr | ₹285.69 Cr | -16.02% | Admitted-Finance | View |
| L7 | RFP for the work of Improvement and upgradation to 2 lane with Paved Shoulder configuration from existing Km 7.410 to Km 56.245(design chainage km 0.000 to Km 49.235)Hadia Chauraha to Karmaini Ghat section of NH328 in the State of U.P.on EPC mode. ministry of road transport and highways•Sant Kabir Nagar•29-Sep-2025 | ₹210.40 Cr | ₹351.25 Cr | -40.1% | Admitted-Finance | View |
| DQ | Balance work of widening to two lane, re-alignment and geometric improvement from km 11.000 to km 114.618 of NH 44A old in the State of Mizoram ministry of road transport and highways•km 11.000 to km 114.618 of NH 44A old•01-Oct-2025 | ₹112.36 Cr | — | — | Rejected-Finance | View |
| L9 | UPGRADATION OF NH 448 (OLD NH-79) AJMER-NASIRABAD ROAD FROM 2 LANE TO 4 LANE DIVIDED CARRIAGEWAY ON EXISTING CHAINAGE KM 3/100 TO 7/050 IN THE STATE OF RAJASTHAN ministry of road transport and highways•Under Jurisdiction of PWD NH Dn. Ajmer•25-Oct-2025 | ₹47.75 Cr | ₹60.44 Cr | -21% | Admitted-Finance | View |
| — | Construction of 4 laning of Rishikesh Bypass from Design Chainage km 529.750 Near Teenpani Flyover on NH7 to Design Chainage km 542.420 Near Kharasrote Bridge passing through Bhattowala and Dhalwala Village in the State of Uttarakhand Design Length ministry of road transport and highways•Rishikesh Bypass•18-Apr-2026 | — | ₹735.23 Cr | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Construction of Railway formation using Coal Ash,Blanketing incl Bridges, Service Buildings,Quarters,Service Road, Drain,Retaining wall,General Electrical works etc.in Const of MGR for Linking of Hurra C mines with existing MGR of Kahalgaon STTP ircon international limited•Kahalgaon, Bihar•04-Oct-2024 | — | ₹184.83 Cr | — | Awarded: Triveni Engicons Private Limited | View |
| — | EOI for JV association with IRCON for Capacity Augmentation and Safety Measures for the Ayodhya Gorakhpur section in the state of Uttar Pradesh on EPC mode ircon international limited•Ayodhya, UP•16-Dec-2025 | — | — | — | Admitted-Fee/PreQual/Technical/Finance | View |
| — | EOI for association with DMRC delhi metro rail corporation limited•New Delhi•04-Jul-2025 | — | — | — | Admitted-Fee/PreQual/Technical/Finance | View |